Automatic Design Algorithm for the Tower Crane Foundations

Foundation of tower crane serves to ensure stability against vertical and horizontal forces. If foundation stress is not sufficient, tower crane may be subject to overturning, shearing or foundation settlement. Therefore, engineering review of stable support is a highly critical part of foundation design. However, there are not many professionals who can conduct engineering review of tower crane foundation and, if any, they have information only on a small number of cranes in which they have hands-on experience. It is also customary to rely on empirical knowledge and tower crane renter-s recommendations rather than designing foundation on the basis of engineering knowledge. Therefore, a foundation design automation system considering not only lifting conditions but also overturning risk, shearing and vertical force may facilitate production of foolproof foundation design for experts and enable even non-experts to utilize professional knowledge that only experts can access now. This study proposes Automatic Design Algorithm for the Tower Crane Foundations considering load and horizontal force.




References:
[1] Koo, M. H. (2006). "Technological tend of tower cranes and safety in
Korea", The 5th Korea China Japan International Crane Symposium,
Korea, 162-179
[2] KOSHA (2007). "Statistics of construction disasters in 2006", Korea
Occupational Safety & Health Agency
[3] Beavers, J. E., Moore, J. R., Rinehart, R., and Schriver, W. R. (2006).
"Crane-Related Fatalities in the Construction Industry." J. Constr. Engrg.
and Mgmt. 132(9), 901-910
[4] J.K. Ho, A System Development for Selecting Tower Cranes and
Reviewing the Safety, Architecture, 50(6), pp.112-116, 2006
[5] J.K. Ho, K.K. Han, S.K. Kim, Tower Crane Foundation Design and
Stability Review Model, Korea Institute of Ecological Architecture and
Environment, Vol.7(6), pp99-106, 2007
[6] K.K. Han, A.Y. Kim, S.K. Kim, A Stability Examination Of Tower
Cranes Base through OptiCRANE-TC, Korea Institute of Ecological
Architecture and Environment, Vol.13, pp.139-142, 2007
[7] Sun-Kuk Kim , Jang-Young Kim, Dong-Hoon Lee, Sang-Yeon Ryu,
Automatic Optimal Design Algorithm for the Foundation of Tower
Cranes, Journal of Automation in Construction, 2011
[8] Leonhard E. Bernold, Steven J. Lorenc, and Erick Luces. (1997).
"On-Line Assistance for Crane Operators." J. Comp. in Civ. Engrg. 11,
248
[9] John G. Everett and Alexander H. Slocum. (1993). "CRANIUM: Device
for Improving Crane Productivity and Safety." J. Constr. Engrg. Mgmt.
119, 23
[10] Leung, W. T. and Tam, C. M. (1999). "Models for assessing hoisting
times of tower cranes", J. Constr. Engrg. and Mgmt. 125(6), 385-391
[11] Shuzo Furusaka , Colin Gray ,A model for the selection of the optimum
crane for construction sites, Construction Management and Economics22,
157 - 176,September 1984
[12] C. Gray, J. Little, (1985). "A systematic approach to the selection of an
appropriate crane for a construction site", Construction Management and
Economics, 3(2), pp.121-144
[13] J.K. Ho, K.K. Han, S.K. Kim, Tower Crane Foundation Design and
Stability Review Model, Korea Institute of Ecological Architecture and
Environment, Vol.7(6), pp99-106, 2007
[14] J.K. Ho, D.H. Kook, S.K. Kim, A System for the Selection of the
Optimum Tower Cranes, Korean Journal of Construction Engineering
and Management, Vol.8(6), pp.216-226, 2007
[15] K.K. Han, A.Y. Kim, S.K. Kim, A Stability Examination Of Tower
Cranes Base through OptiCRANE-TC, Korea Institute of Ecological
Architecture and Environment, Vol.13, pp.139-142, 2007
[16] J.K. Ho, Tower Crane Stability Review Program Development, Samsung
E&C, Samsung E&C Technology, Vol.55, pp.57-63, 2006