Abstract: Progressive collapse of buildings typically occurs
when abnormal loading conditions cause local damages, which leads
to a chain reaction of failure and ultimately catastrophic collapse. The
tie force (TF) method is one of the main design approaches for
progressive collapse. As the TF method is a simplified method, further
investigations on the reliability of the method is necessary. This study
aims to develop an improved TF method to design the cross wall
structures for progressive collapse. To this end, the pullout behavior of
strands in grout was firstly analyzed; and then, by considering the tie
force-slip relationship in the friction stage together with the catenary
action mechanism, a comprehensive analytical method was developed.
The reliability of this approach is verified by the experimental results
of concrete block pullout tests and full scale floor-to-floor joints tests
undertaken by Portland Cement Association (PCA). Discrepancies in
the tie force between the analytical results and codified specifications
have suggested the deficiency of TF method, hence an improved
model based on the analytical results has been proposed to address this
concern.