An Improved Tie Force Method for Progressive Collapse Resistance of Precast Concrete Cross Wall Structures

Progressive collapse of buildings typically occurs  when abnormal loading conditions cause local damages, which leads  to a chain reaction of failure and ultimately catastrophic collapse. The  tie force (TF) method is one of the main design approaches for  progressive collapse. As the TF method is a simplified method, further  investigations on the reliability of the method is necessary. This study  aims to develop an improved TF method to design the cross wall  structures for progressive collapse. To this end, the pullout behavior of  strands in grout was firstly analyzed; and then, by considering the tie  force-slip relationship in the friction stage together with the catenary  action mechanism, a comprehensive analytical method was developed.  The reliability of this approach is verified by the experimental results  of concrete block pullout tests and full scale floor-to-floor joints tests  undertaken by Portland Cement Association (PCA). Discrepancies in  the tie force between the analytical results and codified specifications  have suggested the deficiency of TF method, hence an improved  model based on the analytical results has been proposed to address this  concern.