Abstract: In this paper, CYME Distribution software has been used to assess the impacts of solar Photovoltaic (PV) distributed generation (DG) plant on the Electricity Company of Ghana (ECG) 33 kV sub-transmission network at different PV penetration levels. As ECG begins to encourage DG PV interconnections within its network, there has been the need to assess the impacts on the sub-transmission losses and voltage contribution. In Tema, a city in Accra - Ghana, ECG has a 33 kV sub-transmission network made up of 20 No. 33 kV buses that was modeled. Three different locations were chosen: The source bus, a bus along the sub-transmission radial network and a bus at the tail end to determine the optimal location for DG PV interconnection. The optimal location was determined based on sub-transmission technical losses and voltage impact. PV capacities at different penetration levels were modeled at each location and simulations performed to determine the optimal PV penetration level. Interconnection at a bus along (or in the middle of) the sub-transmission network offered the highest benefits at an optimal PV penetration level of 80%. At that location, the maximum voltage improvement of 0.789% on the neighboring 33 kV buses and maximum loss reduction of 6.033% over the base case scenario were recorded. Hence, the optimal location for DG PV integration within the 33 kV sub-transmission utility network is at a bus along the sub-transmission radial network.
Abstract: This paper aims to investigate and emphasize the importance of the grid-connected photovoltaic (PV) systems regarding the intermittent nature of renewable generation, and the characterization of PV generation with regard to grid code compliance. The development of Photovoltaic systems and expansion plans relating to the futuristic in worldwide is elaborated. The most important impacts of grid connected photovoltaic systems on distribution networks as well as the Penetration level of PV system was investigated.
Abstract: Wind energy offers a significant advantage such as no
fuel costs and no emissions from generation. However, wind energy
sources are variable and non-dispatchable. The utility grid is able to
accommodate the variability of wind in smaller proportion along with
the daily load. However, at high penetration levels, the variability can
severely impact the utility reserve requirements and the cost
associated with it. In this paper the impact of wind energy is
evaluated in detail in formulating the total utility cost. The objective
is to minimize the overall cost of generation while ensuring the
proper management of the load. Overall cost includes the curtailment
cost, reserve cost and the reliability cost, as well as any other penalty
imposed by the regulatory authority. Different levels of wind
penetrations are explored and the cost impacts are evaluated. As the
penetration level increases significantly, the reliability becomes a
critical question to be answered. Here we increase the penetration
from the wind yet keep the reliability factor within the acceptable
limit provided by NERC. This paper uses an economic dispatch (ED)
model to incorporate wind generation into the power grid. Power
system costs are analyzed at various wind penetration levels using
Linear Programming. The goal of this study is show how the
increases in wind generation will affect power system economics.