Abstract: During aircraft maintenance scheduling, operator calculates the budget of the maintenance. Usually, this calculation includes only the costs that are directly related to the maintenance process such as cost of labor, material, and equipment. In some cases, overhead cost is also included. However, in some of those, downtime cost is neglected claiming that grounding is a natural fact of maintenance; therefore, it is not considered as part of the analytical decision-making process. Based on the normalized data, we introduce downtime cost with its monetary value and add its seasonal character. We envision that the rest of the model, which works together with the downtime cost, could be checked with the real life cases, through the review of MRO cost and airline spending in the particular and scheduled maintenance events.
Abstract: Protection of slope and embankment from erosion has
become an important issue in Bangladesh. The constructions of
strong structures require large capital, integrated designing, high
maintenance cost. Strong structure methods have negative impact on
the environment and sometimes not function for the design period.
Plantation of vetiver system along the slopes is an alternative
solution. Vetiver not only serves the purpose of slope protection but
also adds green environment reducing pollution. Vetiver is available
in almost all the districts of Bangladesh. This paper presents the
application of vetiver system with geo-jute, for slope protection and
erosion control of embankments and slopes. In-situ shear tests have
been conducted on vetiver rooted soil system to find the shear
strength. The shear strength and effective soil cohesion of vetiver
rooted soil matrix are respectively 2.0 times and 2.1 times higher than
that of the bared soil. Similar trends have been found in direct shear
tests conducted on laboratory reconstituted samples. Field trials have
been conducted in road embankment and slope protection with
vetiver at different sites. During the time of vetiver root growth the
soil protection has been accomplished by geo-jute. As the geo-jute
degrades with time, vetiver roots grow and take over the function of
geo-jutes. Slope stability analyses showed that vegetation increase
the factor of safety significantly.
Abstract: A data warehouse (DW) is a system which has value and role for decision-making by querying. Queries to DW are critical regarding to their complexity and length. They often access millions of tuples, and involve joins between relations and aggregations. Materialized views are able to provide the better performance for DW queries. However, these views have maintenance cost, so materialization of all views is not possible. An important challenge of DW environment is materialized view selection because we have to realize the trade-off between performance and view maintenance. Therefore, in this paper, we introduce a new approach aimed to solve this challenge based on Two-Phase Optimization (2PO), which is a combination of Simulated Annealing (SA) and Iterative Improvement (II), with the use of Multiple View Processing Plan (MVPP). Our experiments show that 2PO outperform the original algorithms in terms of query processing cost and view maintenance cost.
Abstract: A data warehouse (DW) is a system which has value and role for decision-making by querying. Queries to DW are critical regarding to their complexity and length. They often access millions of tuples, and involve joins between relations and aggregations. Materialized views are able to provide the better performance for DW queries. However, these views have maintenance cost, so materialization of all views is not possible. An important challenge of DW environment is materialized view selection because we have to realize the trade-off between performance and view maintenance cost. Therefore, in this paper, we introduce a new approach aimed at solve this challenge based on Two-Phase Optimization (2PO), which is a combination of Simulated Annealing (SA) and Iterative Improvement (II), with the use of Multiple View Processing Plan (MVPP). Our experiments show that our method provides a further improvement in term of query processing cost and view maintenance cost.