Abstract: The generation of an idea that goes through several
phases is affected by individual factors, interests, preferences and
motivation. The purpose of this research was to analyze the
difference in difficulties of generating ideas according to individual
learning styles. A total of 375 technical students from four technical
universities in Malaysia were randomly selected as samples. The
Kolb Learning Styles Inventory and a set of developed questionnaires
were used in this research. The results showed that the most dominant
learning style among technical students is Doer. A total of 319
(85.1%) technical students faced difficulties in solving individual
assignments. Most of the problem faced by technical students is the
difficulty of generating ideas for solving individual assignments.
There was no significant difference in difficulties of generating ideas
according to students’ learning styles. Therefore, students need to
learn higher order thinking skills enabling students to generate ideas
and consequently complete assignments.
Abstract: Defect prevention is the most vital but habitually
neglected facet of software quality assurance in any project. If
functional at all stages of software development, it can condense the
time, overheads and wherewithal entailed to engineer a high quality
product. The key challenge of an IT industry is to engineer a
software product with minimum post deployment defects.
This effort is an analysis based on data obtained for five selected
projects from leading software companies of varying software
production competence. The main aim of this paper is to provide
information on various methods and practices supporting defect
detection and prevention leading to thriving software generation. The
defect prevention technique unearths 99% of defects. Inspection is
found to be an essential technique in generating ideal software
generation in factories through enhanced methodologies of abetted
and unaided inspection schedules. On an average 13 % to 15% of
inspection and 25% - 30% of testing out of whole project effort time
is required for 99% - 99.75% of defect elimination.
A comparison of the end results for the five selected projects
between the companies is also brought about throwing light on the
possibility of a particular company to position itself with an
appropriate complementary ratio of inspection testing.