Abstract: In recent years, a reconstruction project for sewer
pipelines has been progressing in Japan with the aim of renewing old
sewer culverts. However, it is difficult to secure a sufficient base area
for shafts in an urban area because many streets are narrow with a
complex layout. As a result, construction in such urban areas is
generally very demanding.
In urban areas, there is a strong requirement for a safe, reliable and
economical construction method that does not disturb the public’s
daily life and urban activities. With this in mind, we developed a new
construction method called the “shield switching type micro-tunneling
method,” which integrates the micro-tunneling method and shield
method.
In this method, pipeline is constructed first for sections that are
gently curved or straight using the economical micro-tunneling
method, and then the method is switched to the shield method for
sections with a sharp curve or a series of curves without establishing
an intermediate shaft.
This paper provides the information, features and construction
examples of this newly developed method.