Abstract: This paper presents an analytical approach for
evaluating distribution system reliability indices in the presence of
distributed generation. Modeling distributed generation and
evaluation of distribution system reliability indices using the
frequency duration technique. Using model implements and case
studies are discussed. Results showed that location of DG and its
effect in distribution reliability indices. In this respect, impact of DG
on distribution system is investigated using the IEEE Roy Billinton
test system (RBTS2) included feeder 1. Therefore, it will help to the
distribution system planners in the DG resource placement.
Abstract: Technological developments in industrial innovations have currently been related to interconnected system assistance and distribution networks. This important in order to enable an electrical load to continue receive power in the event of disconnection of load from the main power grid. This paper represents a method for reliability assessment of interconnected power systems based. The multi-agent system consists of four agents. The first agent was the generator agent to using as connected the generator to the grid depending on the state of the reserve margin and the load demand. The second was a load agent is that located at the load. Meanwhile, the third is so-called "the reverse margin agent" that to limit the reserve margin between 0 - 25% depend on the load and the unit size generator. In the end, calculation reliability Agent can be calculate expected energy not supplied (EENS), loss of load expectation (LOLE) and the effecting of tie line capacity to determine the risk levels Roy Billinton Test System (RBTS) can use to evaluated the reliability indices by using the developed JADE package. The results estimated of the reliability interconnection power systems presented in this paper. The overall reliability of power system can be improved. Thus, the market becomes more concentrated against demand increasing and the generation units were operating in relation to reliability indices.
Abstract: This paper presents the optimal placement and sizing of distributed generation (DG) in a distribution system. The problem is to reliability improvement of distribution system with distributed generations. The technique employed to solve the minimization problem is based on a developed Tabu search algorithm and reliability worth analysis. The developed methodology is tested with a distribution system of Roy Billinton Test System (RBTS) bus 2. It can be seen from the case study that distributed generation can reduce the customer interruption cost and therefore improve the reliability of the system. It is expected that our proposed method will be utilized effectively for distribution system operator.
Abstract: This paper investigates the suitability of Latin Hypercube sampling (LHS) for composite electric power system reliability analysis. Each sample generated in LHS is mapped into an equivalent system state and used for evaluating the annualized system and load point indices. DC loadflow based state evaluation model is solved for each sampled contingency state. The indices evaluated are loss of load probability, loss of load expectation, expected demand not served and expected energy not supplied. The application of the LHS is illustrated through case studies carried out using RBTS and IEEE-RTS test systems. Results obtained are compared with non-sequential Monte Carlo simulation and state enumeration analytical approaches. An error analysis is also carried out to check the LHS method’s ability to capture the distributions of the reliability indices. It is found that LHS approach estimates indices nearer to actual value and gives tighter bounds of indices than non-sequential Monte Carlo simulation.
Abstract: This paper presents a Reliability-Based Topology
Optimization (RBTO) based on Evolutionary Structural Optimization
(ESO). An actual design involves uncertain conditions such as
material property, operational load and dimensional variation.
Deterministic Topology Optimization (DTO) is obtained without
considering of the uncertainties related to the uncertainty parameters.
However, RBTO involves evaluation of probabilistic constraints,
which can be done in two different ways, the reliability index
approach (RIA) and the performance measure approach (PMA). Limit
state function is approximated using Monte Carlo Simulation and
Central Composite Design for reliability analysis. ESO, one of the
topology optimization techniques, is adopted for topology
optimization. Numerical examples are presented to compare the DTO
with RBTO.
Abstract: This paper presents a reliability-based approach to select appropriate wind turbine types for a wind farm considering site-specific wind speed patterns. An actual wind farm in the northern region of Iran with the wind speed registration of one year is studied in this paper. An analytic approach based on total probability theorem is utilized in this paper to model the probabilistic behavior of both turbines- availability and wind speed. Well-known probabilistic reliability indices such as loss of load expectation (LOLE), expected energy not supplied (EENS) and incremental peak load carrying capability (IPLCC) for wind power integration in the Roy Billinton Test System (RBTS) are examined. The most appropriate turbine type achieving the highest reliability level is chosen for the studied wind farm.
Abstract: In this paper, a tooth shape optimization method for
cogging torque reduction in Permanent Magnet (PM) motors is
developed by using the Reduced Basis Technique (RBT) coupled by
Finite Element Analysis (FEA) and Design of Experiments (DOE)
methods. The primary objective of the method is to reduce the
enormous number of design variables required to define the tooth
shape. RBT is a weighted combination of several basis shapes. The
aim of the method is to find the best combination using the weights
for each tooth shape as the design variables. A multi-level design
process is developed to find suitable basis shapes or trial shapes at
each level that can be used in the reduced basis technique. Each level
is treated as a separated optimization problem until the required
objective – minimum cogging torque – is achieved. The process is
started with geometrically simple basis shapes that are defined by
their shape co-ordinates. The experimental design of Taguchi method
is used to build the approximation model and to perform
optimization. This method is demonstrated on the tooth shape
optimization of a 8-poles/12-slots PM motor.
Abstract: In an electric power system, spinning reserve
requirements can be determined by using deterministic and/or
probabilistic measures. Although deterministic methods are usual in
many systems, application of probabilistic methods becomes
increasingly important in the new environment of the electric power
utility industry. This is because of the increased uncertainty
associated with competition. In this paper 1) a new probabilistic
method is presented which considers the reliability of transmission
system in a simplified manner and 2) deterministic and probabilistic
methods are compared. The studied methods are applied to the Roy
Billinton Test System (RBTS).