Abstract: There are currently many people living with limb loss in the USA. The main causes for amputation can range from vascular disease, to trauma, or cancer. This number is expected increase over the next decade. Many patients have a single prosthetic for the first year but end up getting a second one to accommodate their changing physique. Afterwards, the prosthesis gets replaced every three to five years depending on how often it is used. This could cost the patient up to $500,000 throughout their lifetime. Complications do not end there, however. Due to the absence of nerves, it becomes more difficult to traverse terrain with a prosthetic. Moving on an incline or decline becomes difficult, thus curbs and stairs can be a challenge. Certain physical activities, such as cycling, could be even more strenuous. It will need to be relearned to accommodate for the change in weight, center of gravity, and transfer of energy from the leg to the pedal. The purpose of this research project is to develop a new, alternate below-knee cycling prosthetic using Dieter & Schmidt’s design process approach. It will be subjected to fatigue analysis under dynamic loading to observe the limitations as well as the strengths and weaknesses of the prosthetic. Benchmark comparisons will be made between existing prosthetics and the proposed one, examining the benefits and disadvantages. The resulting prosthetic will be 3D printed using acrylonitrile butadiene styrene (ABS) or polycarbonate (PC) plastic.
Abstract: In this paper, we present a model and an algorithm for
the calculation of the optimal control limit, average cost, sample size,
and the sampling interval for an optimal Bayesian chart to control
the proportion of defective items produced using a semi-Markov
decision process approach. Traditional p-chart has been widely
used for controlling the proportion of defectives in various kinds
of production processes for many years. It is well known that
traditional non-Bayesian charts are not optimal, but very few optimal
Bayesian control charts have been developed in the literature, mostly
considering finite horizon. The objective of this paper is to develop
a fast computational algorithm to obtain the optimal parameters of a
Bayesian p-chart. The decision problem is formulated in the partially
observable framework and the developed algorithm is illustrated by
a numerical example.
Abstract: Banda Sea Collision Zone (BSCZ) is the result of the
interaction and convergence of Indo-Australian plate, Eurasian plate
and Pacific plate. This location is located in eastern Indonesia. This
zone has a very high seismic activity. In this research, we will
calculate the rate (λ) and Mean Square Error (MSE). By this result,
we will classification earthquakes distribution in the BSCZ with the
point process approach. Chi-square is used to determine the type of
earthquakes distribution in the sub region of BSCZ. The data used in
this research is data of earthquakes with a magnitude ≥ 6 SR for the
period 1964-2013 and sourced from BMKG Jakarta. This research is
expected to contribute to the Moluccas Province and surrounding
local governments in performing spatial plan document related to
disaster management.
Abstract: The organizations of European and Czech critical
infrastructure have specific position, mission, characteristics and
behaviour in European Union and Czech state/business environments,
regarding specific requirements for regional and global security
environments. They must respect policy of national security and
global rules, requirements and standards in all their inherent and
outer processes of supply - customer chains and networks. A
controlling is generalized capability to have control over situational
policy. This paper aims and purposes are to introduce the controlling
as quite new necessary process attribute providing for critical
infrastructure is environment the capability and profit to achieve its
commitment regarding to the effectiveness of the quality
management system in meeting customer/ user requirements and also
the continual improvement of critical infrastructure organization’s
processes overall performance and efficiency, as well as its societal
security via continual planning improvement via DYVELOP
modelling.
Abstract: Every organization is continually subject to new damages and threats which can be resulted from their operations or their goal accomplishment. Methods of providing the security of space and applied tools have been widely changed with increasing application and development of information technology (IT). From this viewpoint, information security management systems were evolved to construct and prevent reiterating the experienced methods. In general, the correct response in information security management systems requires correct decision making, which in turn requires the comprehensive effort of managers and everyone involved in each plan or decision making. Obviously, all aspects of work or decision are not defined in all decision making conditions; therefore, the possible or certain risks should be considered when making decisions. This is the subject of risk management and it can influence the decisions. Investigation of different approaches in the field of risk management demonstrates their progress from quantitative to qualitative methods with a process approach.