A Study on a Research and Development Cost-Estimation Model in Korea

In this study, we analyzed the factors that affect research funds using linear regression analysis to increase the effectiveness of investments in national research projects. We collected 7,916 items of data on research projects that were in the process of being finished or were completed between 2010 and 2011. Data pre-processing and visualization were performed to derive statistically significant results. We identified factors that affected funding using analysis of fit distributions and estimated increasing or decreasing tendencies based on these factors.

Technological Analysis Questionnaire for Preliminary Feasibility Study on R&D Program

The Korean government has applied preliminary feasibility study for a new R&D program over about $50 Million since 2008 as a part of official process in budget planning. The investigations of technology, policy, and economics are carried out separately to arrive at a definite result: whether a program is feasible or unfeasible. This paper describes the concept and check-points related to technological analysis from a preliminary evaluation’s stand-point. First of all, the fundamental concept of technological analysis in evaluation systems such as Program Assessment Rating Tool (PART) by Office of Management and Budget (OMB) and Evaluation Methods by Department of Energy (DOE) in the United States, the Green Book in the United Kingdom are reviewed. After the review, customized questionnaire for technological analysis are developed. Conclusively, limitations and further research directions are provided.

Development of Logic Model for R&D Program Plan Analysis in Preliminary Feasibility Study

The Korean Government has applied the preliminary feasibility study to new government R&D program plans as a part of an evaluation system for R&D programs. The preliminary feasibility study for the R&D program is composed of 3 major criteria such as technological, policy and economic analysis. The program logic model approach is used as a part of the technological analysis in the preliminary feasibility study. We has developed and improved the R&D program logic model. The logic model is a very useful tool for evaluating R&D program plans. Using a logic model, we can generally identify important factors of the R&D program plan, analyze its logic flow and find the disconnection or jump in the logic flow among components of the logic model.

Improvement of New Government R&D Program Plans through Preliminary Feasibility Studies

As a part of an evaluation system for R&D programs, the Korean Government has applied the preliminary feasibility study to new government R&D program plans. Basically, the fundamental purpose of the preliminary feasibility study is to decide that the government will either do or do not invest in a new R&D Program. Additionally, the preliminary feasibility study can contribute to the improvement of R&D program plans. For example, 2 cases of new R&D program plans applied to the study are explained in this paper and there are expectations that these R&D programs would yield better performance than without the study. It is thought that the important point of the preliminary feasibility study is not only the effective decision making process of R&D program but also the opportunity to improve R&D program plan actually.

Technology Trend and Level Assessment Using Patent Data for Preliminary Feasibility Study on R and D Program

The Korean government has applied preliminary feasibility study for new and huge R&D programs since 2008.The study is carried out from the viewpoints of technology, policy, and Economics. Then integrate the separate analysis and finally arrive at a definite result; whether a program is feasible or unfeasible, This paper describes the concept and method of the feasibility analysis focused on technological viability assessment for technical analysis. It consists of technology trend assessment and technology level assessment. Through the analysis, we can determine the chance of schedule delay or cost overrun occurring in the proposed plan.