Abstract: In this paper, we try to address the topic of multiple
change management by adopting an engineered research
methodology, conducted within a Moroccan company during its
implementation of several change projects that aim at improving its
supply chain management performance. Firstly, we present the key
concepts related to our research, namely change management, multiproject
management and supply chain management. Then, we try to
assess how the change management and multi-project management
are applied in this company. Finally, we try to propose an approach
that will help managers in dealing with multiple change projects. This
approach proposes to integrate change management, project
management and multi-project management for managing change
projects according to three organizational levels: executive level,
project portfolio level and change project level.
Abstract: The goal of the article is to present a novel Multimedia Firearms Training System. The system was developed in order to compensate for major problems of existing shooting training systems. The designed and implemented solution can be characterized by five major advantages: algorithm for automatic geometric calibration, algorithm of photometric recalibration, firearms hit point detection using thermal imaging camera, IR laser spot tracking algorithm for after action review analysis, and implementation of ballistics equations. The combination of the abovementioned advantages in a single multimedia firearms training system creates a comprehensive solution for detecting and tracking of the target point usable for shooting training systems and improving intervention tactics of uniformed services. The introduced algorithms of geometric and photometric recalibration allow the use of economically viable commercially available projectors for systems that require long and intensive use without most of the negative impacts on color mapping of existing multi-projector multimedia shooting range systems. The article presents the results of the developed algorithms and their application in real training systems.
Abstract: In this paper, supply policy and procurement of
shared resources in some kinds of concurrent construction projects
are investigated. This could be oriented to the problems of holding
construction companies who involve in different projects
concurrently and they have to supply limited resources to several
projects as well as prevent delays to any project. Limits on
transportation vehicles and storage facilities for potential
construction materials and also the available resources (such as cash
or manpower) are some of the examples which affect considerably on
management of all projects over all. The research includes
investigation of some real multi-storey buildings during their
execution periods and surveying the history of the activities. It is
shown that the common resource demand variation curve of the
projects may be expanded or displaced to achieve an optimum
distribution scheme. Of course, it may cause some delay to some
projects, but it has minimum influence on whole execution period of
all projects and its influence on procurement cost of the projects is
considerable. These observations on investigation of some
multistorey building which are built in Iran will be presented in this
paper.