Abstract: During aircraft maintenance scheduling, operator calculates the budget of the maintenance. Usually, this calculation includes only the costs that are directly related to the maintenance process such as cost of labor, material, and equipment. In some cases, overhead cost is also included. However, in some of those, downtime cost is neglected claiming that grounding is a natural fact of maintenance; therefore, it is not considered as part of the analytical decision-making process. Based on the normalized data, we introduce downtime cost with its monetary value and add its seasonal character. We envision that the rest of the model, which works together with the downtime cost, could be checked with the real life cases, through the review of MRO cost and airline spending in the particular and scheduled maintenance events.
Abstract: This paper presents one comprehensive modelling approach for maintenance scheduling problem of thermal power units in competitive market. This problem is formulated as a 0/1 mixedinteger linear programming model. Model incorporates long-term bilateral contracts with defined profiles of power and price, and weekly forecasted market prices for market auction. The effectiveness of the proposed model is demonstrated through case study with detailed discussion.
Abstract: This study considers the problem of determining
operation and maintenance schedules for a containership equipped
with components during its sailing according to a pre-determined
navigation schedule. The operation schedule, which specifies work
time of each component, determines the due-date of each maintenance
activity, and the maintenance schedule specifies the actual start
time of each maintenance activity. The main constraints are component
requirements, workforce availability, working time limitation,
and inter-maintenance time. To represent the problem mathematically,
a mixed integer programming model is developed. Then,
due to the problem complexity, we suggest a heuristic for the objective
of minimizing the sum of earliness and tardiness between the
due-date and the starting time of each maintenance activity. Computational
experiments were done on various test instances and the
results are reported.