Abstract: Forecasting electricity load is important for various purposes like planning, operation and control. Forecasts can save operating and maintenance costs, increase the reliability of power supply and delivery systems, and correct decisions for future development. This paper compares various time series methods to forecast 24 hours ahead of electricity load. The methods considered are the Holt-Winters smoothing, SARIMA Modeling, LSTM Network, Fbprophet and Tensorflow probability. The performance of each method is evaluated by using the forecasting accuracy criteria namely, the Mean Absolute Error and Root Mean Square Error. The National Renewable Energy Laboratory (NREL) residential energy consumption data are used to train the models. The results of this study show that SARIMA model is superior to the others for 24 hours ahead forecasts. Furthermore, a Bagging technique is used to make the predictions more robust. The obtained results show that by Bagging multiple time-series forecasts we can improve the robustness of the models for 24 hour ahead electricity load forecasting.
Abstract: Electrical load forecasting is considered to be one of the most indispensable parts of a modern-day electrical power system. To ensure a reliable and efficient supply of electric energy, special emphasis should have been put on the predictive feature of electricity supply. Artificial Neural Network-based approaches have emerged to be a significant area of interest for electric load forecasting research. This paper proposed an Artificial Neural Network model based on the particle swarm optimization algorithm for improved electric load forecasting for Mymensingh, Bangladesh. The forecasting model is developed and simulated on the MATLAB environment with a large number of training datasets. The model is trained based on eight input parameters including historical load and weather data. The predicted load data are then compared with an available dataset for validation. The proposed neural network model is proved to be more reliable in terms of day-wise load forecasting for Mymensingh, Bangladesh.
Abstract: High cost of fossil fuels and intensifying installations of alternate energy generation sources are intimidating main challenges in power systems. Making accurate load forecasting an important and challenging task for optimal energy planning and management at both distribution and generation side. There are many techniques to forecast load but each technique comes with its own limitation and requires data to accurately predict the forecast load. Artificial Neural Network (ANN) is one such technique to efficiently forecast the load. Comparison between two different ranges of input datasets has been applied to dynamic ANN technique using MATLAB Neural Network Toolbox. It has been observed that selection of input data on training of a network has significant effects on forecasted results. Day-wise input data forecasted the load accurately as compared to year-wise input data. The forecasted load is then distributed among the six generators by using the linear programming to get the optimal point of generation. The algorithm is then verified by comparing the results of each generator with their respective generation limits.
Abstract: Load forecasting has become crucial in recent years
and become popular in forecasting area. Many different power
forecasting models have been tried out for this purpose. Electricity
load forecasting is necessary for energy policies, healthy and reliable
grid systems. Effective power forecasting of renewable energy load
leads the decision makers to minimize the costs of electric utilities
and power plants. Forecasting tools are required that can be used
to predict how much renewable energy can be utilized. The purpose
of this study is to explore the effectiveness of LSTM-based neural
networks for estimating renewable energy loads. In this study, we
present models for predicting renewable energy loads based on
deep neural networks, especially the Long Term Memory (LSTM)
algorithms. Deep learning allows multiple layers of models to learn
representation of data. LSTM algorithms are able to store information
for long periods of time. Deep learning models have recently been
used to forecast the renewable energy sources such as predicting
wind and solar energy power. Historical load and weather information
represent the most important variables for the inputs within the
power forecasting models. The dataset contained power consumption
measurements are gathered between January 2016 and December
2017 with one-hour resolution. Models use publicly available data
from the Turkish Renewable Energy Resources Support Mechanism.
Forecasting studies have been carried out with these data via deep
neural networks approach including LSTM technique for Turkish
electricity markets. 432 different models are created by changing
layers cell count and dropout. The adaptive moment estimation
(ADAM) algorithm is used for training as a gradient-based optimizer
instead of SGD (stochastic gradient). ADAM performed better than
SGD in terms of faster convergence and lower error rates. Models
performance is compared according to MAE (Mean Absolute Error)
and MSE (Mean Squared Error). Best five MAE results out of
432 tested models are 0.66, 0.74, 0.85 and 1.09. The forecasting
performance of the proposed LSTM models gives successful results
compared to literature searches.
Abstract: Energy production optimization has been traditionally very important for utilities in order to improve resource consumption. However, load forecasting is a challenging task, as there are a large number of relevant variables that must be considered, and several strategies have been used to deal with this complex problem. This is especially true also in microgrids where many elements have to adjust their performance depending on the future generation and consumption conditions. The goal of this paper is to present a solution for short-term load forecasting in microgrids, based on three machine learning experiments developed in R and web services built and deployed with different components of Cortana Intelligence Suite: Azure Machine Learning, a fully managed cloud service that enables to easily build, deploy, and share predictive analytics solutions; SQL database, a Microsoft database service for app developers; and PowerBI, a suite of business analytics tools to analyze data and share insights. Our results show that Boosted Decision Tree and Fast Forest Quantile regression methods can be very useful to predict hourly short-term consumption in microgrids; moreover, we found that for these types of forecasting models, weather data (temperature, wind, humidity and dew point) can play a crucial role in improving the accuracy of the forecasting solution. Data cleaning and feature engineering methods performed in R and different types of machine learning algorithms (Boosted Decision Tree, Fast Forest Quantile and ARIMA) will be presented, and results and performance metrics discussed.
Abstract: Load modeling is one of the central functions in
power systems operations. Electricity cannot be stored, which means
that for electric utility, the estimate of the future demand is necessary
in managing the production and purchasing in an economically
reasonable way. A majority of the recently reported approaches are
based on neural network. The attraction of the methods lies in the
assumption that neural networks are able to learn properties of the
load. However, the development of the methods is not finished, and
the lack of comparative results on different model variations is a
problem. This paper presents a new approach in order to predict the
Tunisia daily peak load. The proposed method employs a
computational intelligence scheme based on the Fuzzy neural
network (FNN) and support vector regression (SVR). Experimental
results obtained indicate that our proposed FNN-SVR technique gives
significantly good prediction accuracy compared to some classical
techniques.
Abstract: Load Forecasting plays a key role in making today's
and future's Smart Energy Grids sustainable and reliable. Accurate
power consumption prediction allows utilities to organize in advance
their resources or to execute Demand Response strategies more
effectively, which enables several features such as higher
sustainability, better quality of service, and affordable electricity
tariffs. It is easy yet effective to apply Load Forecasting at larger
geographic scale, i.e. Smart Micro Grids, wherein the lower available
grid flexibility makes accurate prediction more critical in Demand
Response applications. This paper analyses the application of
short-term load forecasting in a concrete scenario, proposed within the
EU-funded GreenCom project, which collect load data from single
loads and households belonging to a Smart Micro Grid. Three
short-term load forecasting techniques, i.e. linear regression, artificial
neural networks, and radial basis function network, are considered,
compared, and evaluated through absolute forecast errors and training
time. The influence of weather conditions in Load Forecasting is also
evaluated. A new definition of Gain is introduced in this paper, which
innovatively serves as an indicator of short-term prediction
capabilities of time spam consistency. Two models, 24- and
1-hour-ahead forecasting, are built to comprehensively compare these
three techniques.
Abstract: Accurate Short Term Load Forecasting (STLF) is essential for a variety of decision making processes. However, forecasting accuracy can drop due to the presence of uncertainty in the operation of energy systems or unexpected behavior of exogenous variables. Interval Type 2 Fuzzy Logic System (IT2 FLS), with additional degrees of freedom, gives an excellent tool for handling uncertainties and it improved the prediction accuracy. The training data used in this study covers the period from January 1, 2012 to February 1, 2012 for winter season and the period from July 1, 2012 to August 1, 2012 for summer season. The actual load forecasting period starts from January 22, till 28, 2012 for winter model and from July 22 till 28, 2012 for summer model. The real data for Iraqi power system which belongs to the Ministry of Electricity.
Abstract: This paper presents an Artificial Neural Network based approach for short-term load forecasting and exactly for two days ahead. Two seasons have been discussed for Iraqi power system, namely summer and winter; the hourly load demand is the most important input variables for ANN based load forecasting. The recorded daily load profile with a lead time of 1-48 hours for July and December of the year 2012 was obtained from the operation and control center that belongs to the Ministry of Iraqi electricity.
The results of the comparison show that the neural network gives a good prediction for the load forecasting and for two days ahead.
Abstract: This paper presents a Gaussian process model-based
short-term electric load forecasting. The Gaussian process model is
a nonparametric model and the output of the model has Gaussian
distribution with mean and variance. The multiple Gaussian process
models as every hour ahead predictors are used to forecast future
electric load demands up to 24 hours ahead in accordance with the
direct forecasting approach. The separable least-squares approach that
combines the linear least-squares method and genetic algorithm is
applied to train these Gaussian process models. Simulation results
are shown to demonstrate the effectiveness of the proposed electric
load forecasting.
Abstract: Short-Term Load Forecasting (STLF) plays an important role for the economic and secure operation of power systems. In this paper, Continuous Genetic Algorithm (CGA) is employed to evolve the optimum large neural networks structure and connecting weights for one-day ahead electric load forecasting problem. This study describes the process of developing three layer feed-forward large neural networks for load forecasting and then presents a heuristic search algorithm for performing an important task of this process, i.e. optimal networks structure design. The proposed method is applied to STLF of the local utility. Data are clustered due to the differences in their characteristics. Special days are extracted from the normal training sets and handled separately. In this way, a solution is provided for all load types, including working days and weekends and special days. We find good performance for the large neural networks. The proposed methodology gives lower percent errors all the time. Thus, it can be applied to automatically design an optimal load forecaster based on historical data.
Abstract: this paper presents an auto-regressive network called the Auto-Regressive Multi-Context Recurrent Neural Network (ARMCRN), which forecasts the daily peak load for two large power plant systems. The auto-regressive network is a combination of both recurrent and non-recurrent networks. Weather component variables are the key elements in forecasting because any change in these variables affects the demand of energy load. So the AR-MCRN is used to learn the relationship between past, previous, and future exogenous and endogenous variables. Experimental results show that using the change in weather components and the change that occurred in past load as inputs to the AR-MCRN, rather than the basic weather parameters and past load itself as inputs to the same network, produce higher accuracy of predicted load. Experimental results also show that using exogenous and endogenous variables as inputs is better than using only the exogenous variables as inputs to the network.
Abstract: The quality of short term load forecasting can improve the efficiency of planning and operation of electric utilities. Artificial Neural Networks (ANNs) are employed for nonlinear short term load forecasting owing to their powerful nonlinear mapping capabilities. At present, there is no systematic methodology for optimal design and training of an artificial neural network. One has often to resort to the trial and error approach. This paper describes the process of developing three layer feed-forward large neural networks for short-term load forecasting and then presents a heuristic search algorithm for performing an important task of this process, i.e. optimal networks structure design. Particle Swarm Optimization (PSO) is used to develop the optimum large neural network structure and connecting weights for one-day ahead electric load forecasting problem. PSO is a novel random optimization method based on swarm intelligence, which has more powerful ability of global optimization. Employing PSO algorithms on the design and training of ANNs allows the ANN architecture and parameters to be easily optimized. The proposed method is applied to STLF of the local utility. Data are clustered due to the differences in their characteristics. Special days are extracted from the normal training sets and handled separately. In this way, a solution is provided for all load types, including working days and weekends and special days. The experimental results show that the proposed method optimized by PSO can quicken the learning speed of the network and improve the forecasting precision compared with the conventional Back Propagation (BP) method. Moreover, it is not only simple to calculate, but also practical and effective. Also, it provides a greater degree of accuracy in many cases and gives lower percent errors all the time for STLF problem compared to BP method. Thus, it can be applied to automatically design an optimal load forecaster based on historical data.
Abstract: Due to the liberalization of countless electricity markets, load forecasting has become crucial to all public utilities for which electricity is a strategic variable. With the goal of contributing to the forecasting process inside public utilities, this paper addresses the issue of applying the Holt-Winters exponential smoothing technique and the time series analysis for forecasting the hourly electricity load curve of the Italian railways. The results of the analysis confirm the accuracy of the two models and therefore the relevance of forecasting inside public utilities.
Abstract: With the prevalence of computer and development of information technology, Geographic Information Systems (GIS) have long used for a variety of applications in electrical engineering. GIS are designed to support the analysis, management, manipulation and mapping of spatial data. This paper presents several usages of GIS in power utilities such as automated route selection for the construction of new power lines which uses a dynamic programming model for route optimization, load forecasting and optimizing planning of substation-s location and capacity with comprehensive algorithm which involves an accurate small-area electric load forecasting procedure and simulates the different cost functions of substations.
Abstract: The electric power industry is currently undergoing an unprecedented reform. One of the most exciting and potentially profitable recent developments is increasing usage of artificial intelligence techniques. The intention of this paper is to give an overview of using neural network (NN) techniques in power systems. According to the growth rate of NNs application in some power system subjects, this paper introduce a brief overview in fault diagnosis, security assessment, load forecasting, economic dispatch and harmonic analyzing. Advantages and disadvantages of using NNs in above mentioned subjects and the main challenges in these fields have been explained, too.
Abstract: This paper describes interconnection between
technical and economical making decision. The reason of this dealing
could be different: poor technical condition, change of substation
(electrical network) regime, power transformer owner budget deficit
and increasing of tariff on electricity. Establishing of recommended
practice as well as to give general advice and guidance in economical
sector, testing, diagnostic power transformers to establish its
conditions, identify problems and provide potential remedies.
Abstract: Fuzzy Load forecasting plays a paramount role in the operation and management of power systems. Accurate estimation of future power demands for various lead times facilitates the task of generating power reliably and economically. The forecasting of future loads for a relatively large lead time (months to few years) is studied here (long term load forecasting). Among the various techniques used in forecasting load, artificial intelligence techniques provide greater accuracy to the forecasts as compared to conventional techniques. Fuzzy Logic, a very robust artificial intelligent technique, is described in this paper to forecast load on long term basis. The paper gives a general algorithm to forecast long term load. The algorithm is an Extension of Short term load forecasting method to Long term load forecasting and concentrates not only on the forecast values of load but also on the errors incorporated into the forecast. Hence, by correcting the errors in the forecast, forecasts with very high accuracy have been achieved. The algorithm, in the paper, is demonstrated with the help of data collected for residential sector (LT2 (a) type load: Domestic consumers). Load, is determined for three consecutive years (from April-06 to March-09) in order to demonstrate the efficiency of the algorithm and to forecast for the next two years (from April-09 to March-11).
Abstract: One of the most important requirements for the
operation and planning activities of an electrical utility is the
prediction of load for the next hour to several days out, known as
short term load forecasting. This paper presents the development of
an artificial neural network based short-term load forecasting model.
The model can forecast daily load profiles with a load time of one
day for next 24 hours. In this method can divide days of year with
using average temperature. Groups make according linearity rate of
curve. Ultimate forecast for each group obtain with considering
weekday and weekend. This paper investigates effects of temperature
and humidity on consuming curve. For forecasting load curve of
holidays at first forecast pick and valley and then the neural network
forecast is re-shaped with the new data. The ANN-based load models
are trained using hourly historical. Load data and daily historical
max/min temperature and humidity data. The results of testing the
system on data from Yazd utility are reported.
Abstract: In this paper, the modelling and design of artificial neural network architecture for load forecasting purposes is investigated. The primary pre-requisite for power system planning is to arrive at realistic estimates of future demand of power, which is known as Load Forecasting. Short Term Load Forecasting (STLF) helps in determining the economic, reliable and secure operating strategies for power system. The dependence of load on several factors makes the load forecasting a very challenging job. An over estimation of the load may cause premature investment and unnecessary blocking of the capital where as under estimation of load may result in shortage of equipment and circuits. It is always better to plan the system for the load slightly higher than expected one so that no exigency may arise. In this paper, a load-forecasting model is proposed using a multilayer neural network with an appropriately modified back propagation learning algorithm. Once the neural network model is designed and trained, it can forecast the load of the power system 24 hours ahead on daily basis and can also forecast the cumulative load on daily basis. The real load data that is used for the Artificial Neural Network training was taken from LDC, Gujarat Electricity Board, Jambuva, Gujarat, India. The results show that the load forecasting of the ANN model follows the actual load pattern more accurately throughout the forecasted period.