Abstract: Parallel Job Shop Scheduling Problem (JSSP) is a multi-objective and multi constrains NP-optimization problem. Traditional Artificial Intelligence techniques have been widely used; however, they could be trapped into the local minimum without reaching the optimum solution. Thus, we propose a hybrid Artificial Intelligence (AI) model with Discrete Breeding Swarm (DBS) added to traditional AI to avoid this trapping. This model is applied in the cost minimization of the Car Sequencing and Operator Allocation (CSOA) problem. The practical experiment shows that our model outperforms other techniques in cost minimization.
Abstract: In this paper, a mixed integer linear programming (MILP) model is presented to solve the flexible job shop scheduling problem (FJSP). This problem is one of the hardest combinatorial problems. The objective considered is the minimization of the makespan. The computational results of the proposed MILP model were compared with those of the best known mathematical model in the literature in terms of the computational time. The results show that our model has better performance with respect to all the considered performance measures including relative percentage deviation (RPD) value, number of constraints, and total number of variables. By this improved mathematical model, larger FJS problems can be optimally solved in reasonable time, and therefore, the model would be a better tool for the performance evaluation of the approximation algorithms developed for the problem.
Abstract: This paper presents optimization of makespan for ‘n’
jobs and ‘m’ machines flexible job shop scheduling problem with
sequence dependent setup time using genetic algorithm (GA)
approach. A restart scheme has also been applied to prevent the
premature convergence. Two case studies are taken into
consideration. Results are obtained by considering crossover
probability (pc = 0.85) and mutation probability (pm = 0.15). Five
simulation runs for each case study are taken and minimum value
among them is taken as optimal makespan. Results indicate that
optimal makespan can be achieved with more than one sequence of
jobs in a production order.
Abstract: A procedure commonly used in Job Shop Scheduling Problem (JSSP) to evaluate the neighborhoods functions that use the non-deterministic algorithms is the calculation of the critical path in a digraph. This paper presents an experimental study of the cost of computation that exists when the calculation of the critical path in the solution for instances in which a JSSP of large size is involved. The results indicate that if the critical path is use in order to generate neighborhoods in the meta-heuristics that are used in JSSP, an elevated cost of computation exists in spite of the fact that the calculation of the critical path in any digraph is of polynomial complexity.
Abstract: In this paper, mathematical models for permutation flow shop scheduling and job shop scheduling problems are proposed. The first problem is based on a mixed integer programming model. As the problem is NP-complete, this model can only be used for smaller instances where an optimal solution can be computed. For large instances, another model is proposed which is suitable for solving the problem by stochastic heuristic methods. For the job shop scheduling problem, a mathematical model and its main representation schemes are presented.
Abstract: The job shop scheduling problem (JSSP) is a
notoriously difficult problem in combinatorial optimization. This
paper presents a hybrid artificial immune system for the JSSP with the
objective of minimizing makespan. The proposed approach combines
the artificial immune system, which has a powerful global exploration
capability, with the local search method, which can exploit the optimal
antibody. The antibody coding scheme is based on the operation based
representation. The decoding procedure limits the search space to the
set of full active schedules. In each generation, a local search heuristic
based on the neighborhood structure proposed by Nowicki and
Smutnicki is applied to improve the solutions. The approach is tested
on 43 benchmark problems taken from the literature and compared
with other approaches. The computation results validate the
effectiveness of the proposed algorithm.
Abstract: During last decades, developing multi-objective
evolutionary algorithms for optimization problems has found
considerable attention. Flexible job shop scheduling problem, as an
important scheduling optimization problem, has found this attention
too. However, most of the multi-objective algorithms that are
developed for this problem use nonprofessional approaches. In
another words, most of them combine their objectives and then solve
multi-objective problem through single objective approaches. Of
course, except some scarce researches that uses Pareto-based
algorithms. Therefore, in this paper, a new Pareto-based algorithm
called controlled elitism non-dominated sorting genetic algorithm
(CENSGA) is proposed for the multi-objective FJSP (MOFJSP). Our
considered objectives are makespan, critical machine work load, and
total work load of machines. The proposed algorithm is also
compared with one the best Pareto-based algorithms of the literature
on some multi-objective criteria, statistically.
Abstract: In this paper, multi-processors job shop scheduling problems are solved by a heuristic algorithm based on the hybrid of priority dispatching rules according to an ant colony optimization algorithm. The objective function is to minimize the makespan, i.e. total completion time, in which a simultanous presence of various kinds of ferons is allowed. By using the suitable hybrid of priority dispatching rules, the process of finding the best solution will be improved. Ant colony optimization algorithm, not only promote the ability of this proposed algorithm, but also decreases the total working time because of decreasing in setup times and modifying the working production line. Thus, the similar work has the same production lines. Other advantage of this algorithm is that the similar machines (not the same) can be considered. So, these machines are able to process a job with different processing and setup times. According to this capability and from this algorithm evaluation point of view, a number of test problems are solved and the associated results are analyzed. The results show a significant decrease in throughput time. It also shows that, this algorithm is able to recognize the bottleneck machine and to schedule jobs in an efficient way.
Abstract: The job shop scheduling problem (JSSP) is well known as one of the most difficult combinatorial optimization problems. This paper presents a hybrid genetic algorithm for the JSSP with the objective of minimizing makespan. The efficiency of the genetic algorithm is enhanced by integrating it with a local search method. The chromosome representation of the problem is based on operations. Schedules are constructed using a procedure that generates full active schedules. In each generation, a local search heuristic based on Nowicki and Smutnicki-s neighborhood is applied to improve the solutions. The approach is tested on a set of standard instances taken from the literature and compared with other approaches. The computation results validate the effectiveness of the proposed algorithm.
Abstract: Scheduling for the flexible job shop is very important
in both fields of production management and combinatorial
optimization. However, it quit difficult to achieve an optimal solution
to this problem with traditional optimization approaches owing to the
high computational complexity. The combining of several
optimization criteria induces additional complexity and new
problems. In this paper, a Pareto approach to solve the multi
objective flexible job shop scheduling problems is proposed. The
objectives considered are to minimize the overall completion time
(makespan) and total weighted tardiness (TWT). An effective
simulated annealing algorithm based on the proposed approach is
presented to solve multi objective flexible job shop scheduling
problem. An external memory of non-dominated solutions is
considered to save and update the non-dominated solutions during
the solution process. Numerical examples are used to evaluate and
study the performance of the proposed algorithm. The proposed
algorithm can be applied easily in real factory conditions and for
large size problems. It should thus be useful to both practitioners and
researchers.
Abstract: Flexible Job Shop Problem (FJSP) is an extension of
classical Job Shop Problem (JSP). The FJSP extends the routing
flexibility of the JSP, i.e assigning machine to an operation. Thus it
makes it more difficult than the JSP. In this study, Cooperative Coevolutionary
Genetic Algorithm (CCGA) is presented to solve the
FJSP. Makespan (time needed to complete all jobs) is used as the
performance evaluation for CCGA. In order to test performance and
efficiency of our CCGA the benchmark problems are solved.
Computational result shows that the proposed CCGA is comparable
with other approaches.
Abstract: The performance of schedules released to a shop floor may greatly be affected by unexpected disruptions. Thus, this paper considers the flexible job shop scheduling problem when processing times of some operations are represented by a uniform distribution with given lower and upper bounds. The objective is to find a predictive schedule that can deal with this uncertainty. The paper compares two genetic approaches to obtain predictive schedule. To determine the performance of the predictive schedules obtained by both approaches, an experimental study is conducted on a number of benchmark problems.