Gas Lift Optimization Using Smart Gas Lift Valve

Gas lift is one of the most common forms of artificial lift, particularly for offshore wells because of its relative down hole simplicity, flexibility, reliability, and ability to operate over a large range of rates and occupy very little space at the well head. Presently, petroleum industry is investing in exploration and development fields in offshore locations where oil and gas wells are being drilled thousands of feet below the ocean in high pressure and temperature conditions. Therefore, gas-lifted oil wells are capable of failure through gas lift valves which are considered as the heart of the gas lift system for controlling the amount of the gas inside the tubing string. The gas injection rate through gas lift valve must be controlled to be sufficient to obtain and maintain critical flow, also, gas lift valves must be designed not only to allow gas passage through it and prevent oil passage, but also for gas injection into wells to be started and stopped when needed. In this paper, smart gas lift valve has been used to investigate the effect of the valve port size, depth of injection and vertical lift performance on well productivity; all these aspects have been investigated using PROSPER simulator program coupled with experimental data. The results show that by using smart gas lift valve, the gas injection rate can be controlled which leads to improved flow performance.

Implementation Gas Lift Selection Technique and Design in the Wafa Field of Ghadamis Basin, West Libya

Implementing of a continues flow gas lift system for one vertical oil well producer in Wafa field was investigated under five reservoir pressures and their dependent parameters. Well 03 producers were responded positively to the gas lift system despite of the high well head operating pressures. However, the flowing bottom hole pressures were reduced by a ratio from 6 to 33 % in the case A3 for example, for the design runs conducted under the existing operating conditions for years 2003, 2006 and 2009. This reduction in FBHP has increased the production rate by a ratio from 12 to 22.5%. The results indicated that continues flow gas lift system is a good candidate as an artificial lift system to be considered for the one vertical producer covered by this study. Most significantly, timing for artificial lift by a gas lift system for this field is highly dependent on the amount of gas available at the time of implementation because of the high gas production rate from the top of the reservoir.