Achieving Success in NPD Projects

The new product development (NPD) literature emphasizes the importance of introducing new products on the market for continuing business success. New products are responsible for employment, economic growth, technological progress, and high standards of living. Therefore, the study of NPD and the processes through which they emerge is important. The goal of our research is to propose a framework of critical success factors, metrics, and tools and techniques for implementing metrics for each stage of the new product development (NPD) process. An extensive literature review was undertaken to investigate decades of studies on NPD success and how it can be achieved. These studies were scanned for common factors for firms that enjoyed success of new products on the market. The paper summarizes NPD success factors, suggests metrics that should be used to measure these factors, and proposes tools and techniques to make use of these metrics. This was done for each stage of the NPD process, and brought together in a framework that the authors propose should be followed for complex NPD projects. While many studies have been conducted on critical success factors for NPD, these studies tend to be fragmented and focus on one or a few phases of the NPD process. 

Evaluation of Stormwater Quantity and Quality Control through Constructed Mini Wet Pond: A Case Study

One of the Best Management Practices (BMPs) promoted in Urban Stormwater Management Manual for Malaysia (MSMA) published by the Department of Irrigation and Drainage (DID) in 2001 is through the construction of wet ponds in new development projects for water quantity and quality control. Therefore, this paper aims to demonstrate a case study on evaluation of a constructed mini wet pond located at Sekolah Rendah Kebangsaan Seksyen 2, Puchong, Selangor, Malaysia in both stormwater quantity and quality aspect particularly to reduce the peak discharge by temporary storing and gradual release of stormwater runoff from an outlet structure or other release mechanism. The evaluation technique will be using InfoWorks Collection System (CS) as the numerical modeling approach for water quantity aspect. Statistical test by comparing the correlation coefficient (R2), mean error (ME), mean absolute error (MAE) and root mean square error (RMSE) were used to evaluate the model in simulating the peak discharge changes. Results demonstrated that there will be a reduction in peak flow at 11 % to 15% and time to peak flow is slower by 5 minutes through a wet pond. For water quality aspect, a survey on biological indicator of water quality carried out depicts that the pond is within the range of rather clean to clean water with the score of 5.3. This study indicates that a constructed wet pond with wetland facilities is able to help in managing water quantity and stormwater generated pollution at source, towards achieving ecologically sustainable development in urban areas.

A Study on a Research and Development Cost-Estimation Model in Korea

In this study, we analyzed the factors that affect research funds using linear regression analysis to increase the effectiveness of investments in national research projects. We collected 7,916 items of data on research projects that were in the process of being finished or were completed between 2010 and 2011. Data pre-processing and visualization were performed to derive statistically significant results. We identified factors that affected funding using analysis of fit distributions and estimated increasing or decreasing tendencies based on these factors.

Solid Waste Pollution and the Importance of Environmental Planning in Managing and Preserving the Public Environment in Benghazi City and Its Surrounding Areas

Pollution and solid waste are the most important environmental problems plaguing the city of Benghazi as well as other cities and towns in Libya. These problems are caused by the lack of environmental planning and sound environmental management. Environmental planning is very important at present for the development of projects that preserve the environment; therefore, the planning process should be prioritized over the management process. Pollution caused by poor planning and environmental management exists not only in Benghazi but also in all other Libyan cities. This study was conducted through various field visits to several neighborhoods and areas within Benghazi as well as its neighboring regions. Follow-ups in these areas were conducted from March 2013 to October 2013 as documented by photographs. The existing methods of waste collection and means of transportation were investigated. Interviews were conducted with relevant authorities, including the Environment Public Authority in Benghazi and the Public Service Company of Benghazi. The objective of this study is to determine the causes of solid waste pollution in Benghazi City and its surrounding areas. Results show that solid waste pollution in Benghazi and its surrounding areas is the result of poor planning and environmental management, population growth, and the lack of hardware and equipment for the collection and transport of waste from the city to the landfill site. One of the most important recommendations in this study is the development of a complete and comprehensive plan that includes environmental planning and environmental management to reduce solid waste pollution.

A Study on the Planning Criteria of Block-Unit Redevelopment to Improve Residential Environment - Focused on Redevelopment Project in Seoul -

In Korea, elements that decide the quality of residential environment are not only diverse, but show deviation as well. However, people do not consider these elements and instead, they try to settle the uniformed style of residential environment, which focuses on the construction development of apartment housing and business based plans. Recently, block-unit redevelopment is becoming the standout alternative plan of standardize redevelopment projects, but constructions become inefficient because of indefinite planning criteria.  In conclusion, the following research is about analyzing and categorizing the development method and legal ground of redevelopment project district and plan determinant and applicable standard; the purpose of this study is to become a basis in compatible analysis of planning standards that will happen in the future.

Concrete Recycling in Egypt for Construction Applications: A technical and Financial Feasibility Model

The construction industry is a very dynamic field. Every day new technologies and methods are developed to fasten the process and increase its efficiency. Hence, if a project uses fewer resources it will be more efficient. This paper examines the recycling of concrete construction and demolition (C&D) waste to reuse it as aggregates in on-site applications for construction projects in Egypt and possibly in the Middle East. The study focuses on a stationary plant setting. The machinery set-up used in the plant is analyzed technically and financially. The findings are gathered and grouped to obtain a comprehensive cost-benefit financial model to demonstrate the feasibility of establishing and operating a concrete recycling plant. Furthermore, a detailed business plan including the time and hierarchy is proposed. 

Critical Success Factors of Information Technology Projects

Information Technology (IT) is being used by almost all organizations throughout the world. However its success at supporting and improving business is debatable. There is always the risk of IT project failure and studies have proven that a large number of IT projects indeed do fail. There are many components that further the success of IT projects; these have been studied in previous studies. Studies have found the most necessary components for success in software development projects, executive information systems etc. In this study previous literatures that have looked into these success promoting factors have been critically reviewed and analyzed. 15 Critical Success Factors (CSF) of IT projects were enlisted and examined. These factors can be applied to all IT projects and is not specific to a particular type of IT/IS project. A hypothesis was also generated after the evaluation of the factors.

A Model for Managing Intellectual Property, Commercialisation and Technology Transfer within a Collaborative Research Environment

The Defence Materials Technology Centre has evolved from the Australian Cooperative Research Centres Program. The Centre receives funding from Government, industry and research sources to fund collaborative research within its participant organisations. The research centre is structured as a company with a small administrative staff and plays the role of the “honest broker” within the collaboration. A corporate culture has been established that is pervasive into the research projects are undertaken. The model is an effective mechanism to deliver outcomes to each of the participant stakeholders.

Ranking of the Main Criteria for Contractor Selection Procedures on Major Construction Projects in Libya Using the Delphi Method

The construction sector constitutes one of the most important sectors in the economy of any country. Contractor selection is a critical decision that is undertaken by client organizations and is central to the success of any construction project. Contractor selection (CS) is a process which involves investigating, screening and determining whether candidate contractors have the technical and financial capability to be accepted to formally tender for construction work. The process should be conducted prior to the award of contract, characterized by many factors such as: contactor’s skills, experience on similar projects, track- record in the industry, and financial stability. However, this paper evaluates the current state of knowledge in relation to contractor selection process and demonstrates the findings from the analysis of the data collected from the Delphi questionnaire survey. The survey was conducted with a group of 12 experts working in the Libyan construction industry (LCI). The paper starts by briefly explaining the general outline of the questionnaire including the survey participation rate, the different fields the experts came from, and the business titles of the participants. Then the paper describes the tests used to determine when the experts had reached consensus. The paper is based on research which aims to develop rank contractor selection criteria with specific application to make construction projects in the Libyan context. The findings of this study will be utilized to establish the scope of work that will be used as part of a PhD research.

Alignment of e-Government Policy Formulation with Practical Implementation: The Case of Sub-Saharan Africa

The purpose of this study is to analyze how varying alignment of e-Government policies in four countries in Sub-Saharan Africa Region, namely South Africa, Seychelles, Mauritius and Cape Verde lead to the success or failure of e-Government; and what should be done to ensure positive alignment that lead to e-Government project growth. In addition, the study aims to understand how various governments’ efforts in e-Government awareness campaign strategies, international cooperation, functional literacy and anticipated organizational change can influence implementation. This study extensively explores contemporary research undertaken in the field of e-Government and explores the actual respective national ICT policies, strategies and implemented e-Government projects for in-depth comprehension of the status core. Data is analyzed qualitatively and quantitatively to reach a conclusion. The study found that resounding successes in strategic e-Government alignment was achieved in Seychelles, Mauritius, South Africa and Cape Verde - (Ranked number 1 to 4 respectively). The implications of the study is that policy makers in developing countries should put mechanisms in place for constant monitoring and evaluation of project implementation in line with ICT policies to ensure that e-Government projects reach maturity levels and do not die mid-way implementation as often noticed in many countries. The study recommends that countries within the region should make consented collaborative efforts and synergies with the private sector players and international donor agencies to achieve the implementation part of the set ICT policies.

Causes of Final Account Closing Delay: A Theoretical Framework

Delay can be defined as time overrun or extension of time to complete the project. There are high possibilities that delay issues in final account closing cannot be avoided especially in construction project in Malaysia which is unique and dynamic in the terms of nature of design and technical skill. Delay in final account closing is a situation when the actual planning (time and budget allocation) of a construction project exceeds the planned schedule or on the other hand, final account closing exceeds the time and other provisions specified in the contract. The causes of delay discussed in this paper are appraised from the literature review. There are two main types of delay: excusable delay and non-excusable delay. The literature reviews on the delay in final account closing which is then translated into a theoretical framework are summarized in the context of construction players and academician perspective. It is anticipated that the finding reported in this paper could assist the planning of future strategies and guidelines of final account closing for the betterment of construction projects in Malaysia.

Applications of Building Information Modeling (BIM) in Knowledge Sharing and Management in Construction

Construction knowledge can be referred to and reused among involved project managers and jobsite engineers to alleviate problems on a construction jobsite and reduce the time and cost of solving problems related to constructability. This paper proposes a new methodology to provide sharing of construction knowledge by using the Building Information Modeling (BIM) approach. The main characteristics of BIM include illustrating 3D CAD-based presentations and keeping information in a digital format, and facilitation of easy updating and transfer of information in the 3D BIM environment. Using the BIM approach, project managers and engineers can gain knowledge related to 3D BIM and obtain feedback provided by jobsite engineers for future reference. This study addresses the application of knowledge sharing management in the construction phase of construction projects and proposes a BIM-based Knowledge Sharing Management (BIMKSM) system for project managers and engineers. The BIMKSM system is then applied in a selected case study of a construction project in Taiwan to verify the proposed methodology and demonstrate the effectiveness of sharing knowledge in the BIM environment. The combined results demonstrate that the BIMKSM system can be used as a visual BIM-based knowledge sharing management platform by utilizing the BIM approach and web technology.

Fundamental Variables of Final Account Closing Success in Construction Projects in Malaysia

Project management process starts from the planning stage up to the stage of completion (handover of buildings, preparation of the final accounts and the closing balance). Seeing as this process is not easy to be implemented efficiently and effectively, the issue of unsuccessful delivery as per contract in construction has become a major problem for construction projects. These issues have been blamed mainly on inefficient traditional construction practices that continue to dominate the current industry. This is due to several factors, such as environments of construction technology, sophisticated design and customer demand, that are constantly changing and influencing, either directly or indirectly, to the practice of management. Among the identified influences are physical environment, social environment, information environment, political and moral atmosphere. Therefore, this paper is emerged to determine the fundamental variables in the final account closing success in construction project. This aim can be achieved via its objectives of identifying the key constraints to the closing of final accounts in construction projects in Malaysia, investigating solutions to the identified constraints and analysing the relative levels of impact of the identified constraints. It is expected that this paper provides effective measures to avoid or at least reduce the problems in final account closing to the optimum level. It is also anticipated that the finding or outcome reported in this paper could address the unsuccessful contributors in final account closing and define tools for their mitigation for the better development of construction project.

Regional Development Programs: A Reason for Them Failing

This paper contributes to the analysis of the design of regional development programs. This is a case study the birth, life, death and afterlife of a stately development program in Norway, supporting diffusion of innovations by promoting e-business in SMEs (small and medium sized enterprises). The study shows that joint projects like regional development programs have to be designed such that the present value of the future benefits always exceeds the present value of the future effort for all stakeholders vital for the survival of the project. The study also indicate that a development program not always have one common goal which all the stakeholders agree upon. There are several stakeholders who may have different goals by playing a part in the realization of the program. Even if some parties evaluate the results of a development program as a failure, other may have attained their goals. The lessons learned from this study may advise the designers of development programs involving many independent stakeholders. There is a lack of research examining failing development programs, investigating the reasons for it to be considered a failure. This paper shows why a development program was terminated and gives hint to how joint programs could be designed in order for the program to deliver the wanted results to all the key stakeholders.

A Critical Review on the Development of a Theoretical Framework for Managing Environmental Impacts of Construction Project

Construction industry is considered as one of the main contributor of natural resources depletion, responsible for high level pollution and it is one of the attributes that pose climate changes and other environmental threats. A lot of efforts had and have been done to reduce and control these impacts. Project Environmental Management (PEM) includes the processes required to ensure that the impacts of the project execution to the surrounding environment will remain within the limits stated in legal permits. The main aim of most of researches conducted managing Environmental Impacts (EI) is to protect earth planet from pollution. Those researches are presenting four major environmental elements; Environmental Management Systems (EMS), Environmental Design (ED), Environmental Planning (EP) and Environmental Impacts Assessments (EIA). Although everything has been said about environmental management for construction projects, but almost everything remains to be said and therefore to be explored or rediscovered because incontestably, almost everything remains to be done. This paper aimed at reviewing some of what has been said about PEM. Also one of its objectives is to explore and rediscover the whole view of managing the EI problems by proposing a framework that based on the relation between these environmental researches.

Kano’s Model for Clinical Laboratory

The clinical laboratory has received considerable recognition globally due to the rapid development of advanced technology, economic demands and its role in a patient’s treatment cycle. Although various cross-domain experiments and practices with respect to clinical laboratory projects are ready for the full swing, the customer needs are still ambiguous and debatable. The purpose of this study is to apply Kano’s model and customer satisfaction matrix to categorize service quality attributes in order to see how well these attributes are able to satisfy customer needs. The result reveals that ten of the 26 service quality attributes have greater impacts on highly increasing customer’s satisfaction and should be taken in consideration firstly.

Back Analysis of Tehran Metro Tunnel Construction Using FLAC-3D

An important aspect of planning for shallow tunneling under urban areas is the determination of likely surface movements and interaction with existing structures. Back analysis of built tunnels that their settlements magnitude is available, could aid the designers to have a more accuracy in future projects. In this paper, one single Tehran Metro Tunnel (at west of Hor square, Jang University Street) was selected. At first, surface settlements of this tunnel were measured in situ. Then this tunnel was modeled using the commercial finite deference software FLAC-3D. Finally, Results of modeling and in situ measurements compared for verification.

EnArgus: A Knowledge-Based Search Application for Energy Research Projects

Often the users of a semantic search application are facing the problem that they do not find appropriate terms for their search. This holds especially if the data to be searched is from a technical field in which the user does not have expertise. In order to support the user finding the results he seeks, we developed a domain-specific ontology and implemented it into a search application. The ontology serves as a knowledge base, suggesting technical terms to the user which he can add to his query. In this paper, we present the search application and the underlying ontology as well as the project EnArgus in which the application was developed.

Effectiveness of Business Software Systems Development and Enhancement Projects versus Work Effort Estimation Methods

Execution of Business Software Systems (BSS) Development and Enhancement Projects (D&EP) is characterized by the exceptionally low effectiveness, leading to considerable financial losses. The general reason for low effectiveness of such projects is that they are inappropriately managed. One of the factors of proper BSS D&EP management is suitable (reliable and objective) method of project work effort estimation since this is what determines correct estimation of its major attributes: project cost and duration. BSS D&EP is usually considered to be accomplished effectively if product of a planned functionality is delivered without cost and time overrun. The goal of this paper is to prove that choosing approach to the BSS D&EP work effort estimation has a considerable influence on the effectiveness of such projects execution.

Structural Sustainability Techniques for RC High Rise Buildings

Over the early years of the 21st century, cities throughout the Middle East, particularly in the Gulf region have expanded more rapidly than ever before. Given the presence of a large volume of high-rise buildings allover the region, the local authority aims to set a new standard for sustainable development; with an integrated approach to maintain a balance between economy, quality, environmental protection and safety of life. In the very near future, as mandatory requirements, sustainability will be the criteria that should be included in all building projects. It is well known in the building sustainability topics that structural design engineers do not have a key role in this matter. In addition, the LEED (Leadership in Energy and Environmental Design) has looked almost exclusively on the environmental components and materials specifications. The objective of this paper is to focus and establish groundwork for sustainability techniques and applications related to the RC high-rise buildings design, from the structural point of view. A set of recommendations related to local conditions, structural modeling and analysis is given, and some helpful suggestions for structural design team work are addressed. This paper attempts to help structural engineers in identifying the building sustainability design, in order to meet local needs and achieve alternative solutions at an early stage of project design.