Abstract: Fishery lights on the surface could be detected by the Day and Night Band (DNB) of the Visible Infrared Imaging Radiometer Suite (VIIRS) on the Suomi National Polar-orbiting Partnership (Suomi-NPP). The DNB covers the spectral range of 500 to 900 nm and realized a higher sensitivity. The DNB has a difficulty of identification of fishing lights from lunar lights reflected by clouds, which affects observations for the half of the month. Fishery lights and lights of the surface are identified from lunar lights reflected by clouds by a method using the DNB and the infrared band, where the detection limits are defined as a function of the brightness temperature with a difference from the maximum temperature for each level of DNB radiance and with the contrast of DNB radiance against the background radiance. Fishery boats or structures on islands could be detected by the Synthetic Aperture Radar (SAR) on the polar orbit satellites using the reflected microwave by the surface reflecting targets. The SAR has a difficulty of tradeoff between spatial resolution and coverage while detecting the small targets like fishery boats. A distribution of fishery boats and island activities were detected by the scan-SAR narrow mode of Radarsat-2, which covers 300 km by 300 km with various combinations of polarizations. The fishing boats were detected as a single pixel of highly scattering targets with the scan-SAR narrow mode of which spatial resolution is 30 m. As the look angle dependent scattering signals exhibits the significant differences, the standard deviations of scattered signals for each look angles were taken into account as a threshold to identify the signal from fishing boats and structures on the island from background noise. It was difficult to validate the detected targets by DNB with SAR data because of time lag of observations for 6 hours between midnight by DNB and morning or evening by SAR. The temporal changes of island activities were detected as a change of mean intensity of DNB for circular area for a certain scale of activities. The increase of DNB mean intensity was corresponding to the beginning of dredging and the change of intensity indicated the ending of reclamation and following constructions of facilities.
Abstract: This paper studies a secondary voltage control
framework of the microgrids based on the consensus for a
communication network of multiagent. The proposed control is
designed by the communication network with one-way links. The
communication network is modeled by a directed graph. At this
time, the concept of sampling is considered as the communication
constraint among each distributed generator in the microgrids. To
analyze the sampling effects on the secondary voltage control of
the microgrids, by using Lyapunov theory and some mathematical
techniques, the sufficient condition for such problem will be
established regarding linear matrix inequality (LMI). Finally, some
simulation results are given to illustrate the necessity of the
consideration of the sampling effects on the secondary voltage control
of the microgrids.
Abstract: In this paper, reliable consensus of multi-agent systems
with sampled-data is investigated. By using a suitable
Lyapunov-Krasovskii functional and some techniques such as
Wirtinger Inequality, Schur Complement and Kronecker Product, the
results of such system are obtained by solving a set of Linear Matrix
Inequalities (LMIs). One numerical example is included to show the
effectiveness of the proposed criteria.
Abstract: The main objective of this paper is to identify and
disseminate good practice in quality assurance and enhancement as
well as in teaching and learning at master level. This paper focuses
on the experience of the Erasmus Mundus Master program CIMET
(Color in Informatics and Media Technology). Amongst topics
covered, we discuss the adjustments necessary to a curriculum
designed for excellent international students and their preparation for
a global labor market.
Abstract: This paper proposes a delay-dependent leader-following consensus condition of multi-agent systems with both communication delay and probabilistic self-delay. The proposed methods employ a suitable piecewise Lyapunov-Krasovskii functional and the average dwell time approach. New consensus criterion for the systems are established in terms of linear matrix inequalities (LMIs) which can be easily solved by various effective optimization algorithms. Numerical example showed that the proposed method is effective.
Abstract: The purpose of this paper is to analyze the case of the
U.S. Pivot and to suggest an appropriate model including entry
strategies and success factors for QPS of Cable TV. The
telecommunication companies have been operating QPS including
IPTV service, which enables them to cross over broadcasting areas.
Due to this circumstance, the Cable TV operators are now concerned
and are planning to add QPS with the mobile service. Based on the
Porter's five forces model, an analytical framework has been proposed
to MVNO in Cable TV industry in the United States. As a result of this
study, MVNO in Cable TV industry has to have a clear killer
application with their sufficient contents. Subsequently, the direction
of the future Cable TV industry is proposed.
Abstract: There has been gradual progress of late in construction projects, particularly in big-scale megaprojects. Due to the long-term construction period, however, with large-scale budget investment, lack of construction management technologies, and increase in the incomplete elements of project schedule management, a plan to conduct efficient operations and to ensure business safety is required. In particular, as the project management information system (PMIS) is meant for managing a single project centering on the construction phase, there is a limitation in the management of program-scale businesses like megaprojects. Thus, a program management information system (PgMIS) that includes program-level management technologies is needed to manage multiple projects. In this study, a support tool was developed for managing the cost and schedule information occurring in the construction phase, at the program level. In addition, a case study on the developed support tool was conducted to verify the usability of the system. With the use of the developed support tool program, construction managers can monitor the progress of the entire project and of the individual subprojects in real time.