Enhancement of the Performance of Al-Qatraneh 33-kV Transmission Line Using STATCOM: A Case Study

This paper presents a case study of using STATCOM to enhance the performance of Al-Qatraneh 33-kV transmission line. The location of the STATCOM was identified by maintaining minimum voltage drops at the 110 load nodes. The transmission line and the 110 load nodes have been modeled by MATLAB/Simulink. The suggested STATCOM and its location will increase the transmission capability of this transmission line and overcome the overload expected in the year 2020. The annual percentage loading rise has been considered as 14.35%. A graphical representation of the line-to-line voltages and the voltage drops at different load nodes is illustrated.

Investigating Causes of Pavement Deterioration in Khartoum State, Sudan

It is quite essential to investigate the causes of pavement deterioration in order to select the proper maintenance technique. The objective of this study was to identify factors cause deterioration of recently constructed roads in Khartoum state. A comprehensive literature concerning the factors of road deterioration, common road defects and their causes were reviewed. Three major road projects with different deterioration reasons were selected for this study. The investigation involved field survey and laboratory testing on those projects to examine the existing pavement conditions. The results revealed that the roads investigated experienced severe failures in the forms of cracks, potholes, and rutting in the wheel path. The causes of those failures were found mainly linked to poor drainage, traffic overloading, expansive subgrade soils, and the use of low quality materials in construction. Based on the results, recommendations were provided to help highway engineers in selecting the most effective repair techniques for specific kinds of distresses.

Application of Micro-Tunneling Technique to Rectify Tilted Structures Constructed on Cohesive Soil

Foundation differential settlement and supported structure tilting are an occasionally occurred engineering problem. This may be caused by overloading, changes in ground soil properties or unsupported nearby excavations. Engineering thinking points directly toward the logic solution for such problem by uplifting the settled side. This can be achieved with deep foundation elements such as micro-piles and macro-piles™, jacked piers, and helical piers, jet grouted mortar columns, compaction grout columns, cement grouting or with chemical grouting, or traditional pit underpinning with concrete and mortar. Although, some of these techniques offer economic, fast and low noise solutions, many of them are quite the contrary. For tilted structures, with the limited inclination, it may be much easier to cause a balancing settlement on the less-settlement side which shall be done carefully in a proper rate. This principal has been applied in Leaning Tower of Pisa stabilization with soil extraction from the ground surface. In this research, the authors attempt to introduce a new solution with a different point of view. So, the micro-tunneling technique is presented in here as an intended ground deformation cause. In general, micro-tunneling is expected to induce limited ground deformations. Thus, the researchers propose to apply the technique to form small size ground unsupported holes to produce the target deformations. This shall be done in four phases: 1. Application of one or more micro-tunnels, regarding the existing differential settlement value, under the raised side of the tilted structure. 2. For each individual tunnel, the lining shall be pulled out from both sides (from jacking and receiving shafts) in the slow rate. 3. If required, according to calculations and site records, an additional surface load can be applied on the raised foundation side. 4. Finally, a strengthening soil grouting shall be applied for stabilization after adjustment. A finite element based numerical model is presented to simulate the proposed construction phases for different tunneling positions and tunnels group. For each case, the surface settlements are calculated and induced plasticity points are checked. These results show the impact of the suggested procedure on the tilted structure and its feasibility. Comparing results also show the importance of the position selection and tunnels group gradual effect. Thus, a new engineering solution is presented to one of the structural and geotechnical engineering challenges.

Lumped Parameter Models for Numerical Simulation of the Dynamic Response of Hoisting Appliances

This paper describes three lumped parameters models for the study of the dynamic behavior of a boom crane. The models here proposed allows to evaluate the fluctuations of the load arising from the rope and structure elasticity and from the type of the motion command imposed by the winch. A calculation software was developed in order to determine the actual acceleration of the lifted mass and the dynamic overload during the lifting phase. Some application examples are presented, with the aim of showing the correlation between the magnitude of the stress and the type of the employed motion command.

The Effect of Gross Vehicle Weight on the Stability of Heavy Vehicle during Cornering

One of the functions of the commercial heavy vehicle is to safely and efficiently transport goods and people. Due to its size and carrying capacity, it is important to study the vehicle dynamic stability during cornering. Study has shown that there are a number of overloaded heavy vehicles or permissible Gross Vehicle Weight (GVW) violations recorded at selected areas in Malaysia assigned by its type and category. Thus, the objective of this study is to investigate the correlation and effect of the GVW on heavy vehicle stability during cornering event using simulation. Various selected heavy vehicle types and category are simulated using IPG/Truck Maker® with different GVW and road condition (coefficient of friction of road surface), while the speed, driver characteristic, center of gravity of load and road geometry are constant. Based on the analysis, the relationship between GVW and lateral acceleration were established. As expected, on the same value of coefficient of friction, the maximum lateral acceleration would be increased as the GVW increases.

Static Priority Approach to Under-Frequency Based Load Shedding Scheme in Islanded Industrial Networks: Using the Case Study of Fatima Fertilizer Company Ltd - FFL

In this paper static scheme of under-frequency based load shedding is considered for chemical and petrochemical industries with islanded distribution networks relying heavily on the primary commodity to ensure minimum production loss, plant downtime or critical equipment shutdown. A simplistic methodology is proposed for in-house implementation of this scheme using underfrequency relays and a step by step guide is provided including the techniques to calculate maximum percentage overloads, frequency decay rates, time based frequency response and frequency based time response of the system. Case study of FFL electrical system is utilized, presenting the actual system parameters and employed load shedding settings following the similar series of steps. The arbitrary settings are then verified for worst overload conditions (loss of a generation source in this case) and comprehensive system response is then investigated.

On Adaptive, Auto-Configurable Apps

Apps are today the most important possibility to adapt mobile phones and computers to fulfill the special needs of their users. Location- and context-sensitive programs are hereby the key to support the interaction of the user with his/her environment and also to avoid an overload with a plenty of dispensable information. The contribution shows, how a trusted, secure and really bi-directional communication and interaction among users and their environment can be established and used, e.g. in the field of home automation.

ATC in Competitive Electricity Market Using TCSC

In a deregulated power system structure, power producers and customers share a common transmission network for wheeling power from the point of generation to the point of consumption. All parties in this open access environment may try to purchase the energy from the cheaper source for greater profit margins, which may lead to overloading and congestion of certain corridors of the transmission network. This may result in violation of line flow, voltage and stability limits and thereby undermine the system security. Utilities therefore need to determine adequately their available transfer capability (ATC) to ensure that system reliability is maintained while serving a wide range of bilateral and multilateral transactions. This paper presents power transfer distribution factor based on AC load flow for the determination and enhancement of ATC. The study has been carried out for IEEE 24 bus Reliability Test System.

Congestion Management in a Deregulated Power System with Micro Grid

This paper presents congestion management in deregulated power systems. In a deregulated environment, every buyer wants to buy power from the cheapest generator available, irrespective of relative geographical location of buyer and seller. As a consequence of this, the transmission corridors evacuating the power of cheaper generators would get overloaded if all such transactions are approved. Congestion management is a mechanism to prioritize the transactions and commit to such a schedule which would not overload the network. The congestions in the transmission lines are determined by Optimal Power Flow (OPF) solution, which is carried by primal liner programming method. Congestion in the transmission lines are alleviated by connected Distributed Generation (DG) of micro grid at load bus. A method to determine the optimal location of DG unit has been suggested based on transmission line relief sensitivity based approach. The effectiveness of proposed method has been demonstrated on modified IEEE-14 and 30 bus test systems.

Effect of Single Overload Ratio and Stress Ratio on Fatigue Crack Growth

In this investigation variation of cyclic loading effect on fatigue crack growth is the studied. This study is performed on 2024 T351 and 7050-T74 aluminum alloys, used in aeronautical structures. The propagation model used in this study is NASGRO model. In constant amplitude loading (CA), effect of stress ratio has been investigated. Fatigue life and fatigue crack growth rate were affected by this factor. Results showed an increasing in fatigue crack growth rates (FCGRs) with increasing stress ratio. Variable amplitude loading (VAL) can take many forms i.e. with a single overload, overload band… etc. The shape of these loads affects strongly the fracture life and FCGRs. The application of a single overload (ORL) decrease the FCGR and increase the delay crack length caused by the formation of a larger plastic zone compared to the plastic zone due without VAL. The fatigue behavior of the both material under single overload has been compared.

Lean in Large Enterprises: Study Results

The idea of Lean Manufacturing has been known for 20 years. In Polish enterprises its first implementation took place in the automotive industry in the 90s. Many companies, in order to reduce costs, use lower quality materials or overload employees with work and do not notice other possibilities for improving the company’s effectiveness. Enterprises are afraid of the unknown. And that is the problem in many cases with the Lean Manufacturing conception. This article presents the study results conducted in enterprises, the aim of which was to identify waste awareness and the need of lean manufacturing implementation. The authors also wanted to gain information on the most commonly used tools and the way of implementation and the methods of the effects assessment of using the mentioned conception. The study was conducted in large enterprises located on a limited area.

Optimal Location of Multi Type Facts Devices for Multiple Contingencies Using Particle Swarm Optimization

In deregulated operating regime power system security is an issue that needs due thoughtfulness from researchers in the horizon of unbundling of generation and transmission. Electric power systems are exposed to various contingencies. Network contingencies often contribute to overloading of branches, violation of voltages and also leading to problems of security/stability. To maintain the security of the systems, it is desirable to estimate the effect of contingencies and pertinent control measurement can be taken on to improve the system security. This paper presents the application of particle swarm optimization algorithm to find the optimal location of multi type FACTS devices in a power system in order to eliminate or alleviate the line over loads. The optimizations are performed on the parameters, namely the location of the devices, their types, their settings and installation cost of FACTS devices for single and multiple contingencies. TCSC, SVC and UPFC are considered and modeled for steady state analysis. The selection of UPFC and TCSC suitable location uses the criteria on the basis of improved system security. The effectiveness of the proposed method is tested for IEEE 6 bus and IEEE 30 bus test systems.

Dual-Response Approach to Work Stress: An Investigation of Stressors and Wellbeing Outcomes

This study sought to uncover the complex role of stress in the workplace by investigating both positive (eustress) and negative (distress) stress responses. In particular, the study tested a mediation model in which organisational stressors (person-job fit and role overload) influence employee affective wellbeing, both directly and indirectly through stress responses. Participants were recruited from retail and finance organisations in Australia and New Zealand, and asked to complete an anonymous online questionnaire. A total of 140 individuals returned completed questionnaires. The results show that person-job fit influenced eustress, which in turn had a positive effect on employee affective wellbeing; and role overload impacted distress, which in turn held a negative influence on affective wellbeing. These findings indicate that different organisational stressors have unique relationships with eustress and distress responses. Limitations and implications of the study are discussed.

Overloading Scheme for Cellular DS-CDMA using Quasi-Orthogonal Sequences and Iterative Interference Cancellation Receiver

Overloading is a technique to accommodate more number of users than the spreading factor N. This is a bandwidth efficient scheme to increase the number users in a fixed bandwidth. One of the efficient schemes to overload a CDMA system is to use two sets of orthogonal signal waveforms (O/O). The first set is assigned to the N users and the second set is assigned to the additional M users. An iterative interference cancellation technique is used to cancel interference between the two sets of users. In this paper, the performance of an overloading scheme in which the first N users are assigned Walsh-Hadamard orthogonal codes and extra users are assigned the same WH codes but overlaid by a fixed (quasi) bent sequence [11] is evaluated. This particular scheme is called Quasi- Orthogonal Sequence (QOS) O/O scheme, which is a part of cdma2000 standard [12] to provide overloading in the downlink using single user detector. QOS scheme are balance O/O scheme, where the correlation between any set-1 and set-2 users are equalized. The allowable overload of this scheme is investigated in the uplink on an AWGN and Rayleigh fading channels, so that the uncoded performance with iterative multistage interference cancellation detector remains close to the single user bound. It is shown that this scheme provides 19% and 11% overloading with SDIC technique for N= 16 and 64 respectively, with an SNR degradation of less than 0.35 dB as compared to single user bound at a BER of 0.00001. But on a Rayleigh fading channel, the channel overloading is 45% (29 extra users) at a BER of 0.0005, with an SNR degradation of about 1 dB as compared to single user performance for N=64. This is a significant amount of channel overloading on a Rayleigh fading channel.

Building a Personalized Multidimensional Intelligent Learning System

Currently, most of distance learning courses can only deliver standard material to students. Students receive course content passively which leads to the neglect of the goal of education – “to suit the teaching to the ability of students". Providing appropriate course content according to students- ability is the main goal of this paper. Except offering a series of conventional learning services, abundant information available, and instant message delivery, a complete online learning environment should be able to distinguish between students- ability and provide learning courses that best suit their ability. However, if a distance learning site contains well-designed course content and design but fails to provide adaptive courses, students will gradually loss their interests and confidence in learning and result in ineffective learning or discontinued learning. In this paper, an intelligent tutoring system is proposed and it consists of several modules working cooperatively in order to build an adaptive learning environment for distance education. The operation of the system is based on the result of Self-Organizing Map (SOM) to divide students into different groups according to their learning ability and learning interests and then provide them with suitable course content. Accordingly, the problem of information overload and internet traffic problem can be solved because the amount of traffic accessing the same content is reduced.

The Impact of Occupational Stress on Quality of Work Life among the Staff of e-Workspace

With the advent of new technologies, factors related to mental health in e-workspaces are taken into consideration more than ever. Studies have revealed that one of the factors affecting the productivity of employees in an organization is occupational stress. Another influential factor is quality of work life which is important in the improvement of work environment conditions and organizational efficiency. In order to uncover the quality of work life level and to investigate the impact of occupational stress on quality of work life among information technology employees in Iran, a cross-sectional study design was applied and data were gathered using a questionnaire validated by a group of experts. The results of the study showed that information technology staffs have average level of both occupational stress and quality of work life. Furthermore, it was found that occupational stress has a negative impact on quality of work life. In addition, the same results were observed for role ambiguity, role conflict, role under-load, work-pace, work repetitiveness and tension toward quality of work life. No significant relation was found between role overload and quality of work life. Finally, directions for future research are proposed and discussed.

Capacity of Overloaded DS-CDMA System on Rayleigh Fading Channel with Timing Error

The number of users supported in a DS-CDMA cellular system is typically less than spreading factor (N), and the system is said to be underloaded. Overloading is a technique to accommodate more number of users than the spreading factor N. In O/O overloading scheme, the first set is assigned to the N synchronous users and the second set is assigned to the additional synchronous users. An iterative multistage soft decision interference cancellation (SDIC) receiver is used to remove high level of interference between the two sets. Performance is evaluated in terms of the maximum number acceptable users so that the system performance is degraded slightly compared to the single user performance at a specified BER. In this paper, the capacity of CDMA based O/O overloading scheme is evaluated with SDIC receiver. It is observed that O/O scheme using orthogonal Gold codes provides 25% channel overloading (N=64) for synchronous DS-CDMA system on an AWGN channel in the uplink at a BER of 1e-5.For a Rayleigh faded channel, the critical capacity is 40% at a BER of 5e-5 assuming synchronous users. But in practical systems, perfect chip timing is very difficult to maintain in the uplink.. We have shown that the overloading performance reduces to 11% for a timing synchronization error of 0.02Tc for a BER of 1e-5.

Operational Risks for Highway Projects in Malaysia

The Malaysia Highway Authority (MHA) was established by the Government in 1980 for the purpose of designing, constructing and maintaining toll highways in Malaysia that include the North-South Expressway and the Penang Bridge, which were procured using the publicly-funded traditional procurement. However following a recession in the mid 80-s, the operations of these tolledhighways had been privatized to ensure that their operational services continue through private financing as a result of long-term concession agreement concurred between the Malaysian Government and private operators. The change in the contract strategy for highway projects in Malaysia would have a great tendency to dictate a significant risk exposure towards the key parties involved, particularly the Malaysian Government as project principal, unless operational risks are clearly identified and managed via appropriate mitigation measures prior to a contract signing. This research identifies potential operational risks that have a possibility to occur in highway projects in Malaysia from the perspective of public sector clients. Since this research focuses on the operational risks for highway projects in Malaysia, the initial results acquired from literature review on the operational risks of highway projects in some Asian countries are then justified by a number of key individuals from the MHA through interviews. As a result, among key operational risks that have possibility to occur in the highway projects in Malaysia include initial toll-tariff decided by the Government, traffic congestion, change of road network and overloaded freight transportation, which could cause damage to the road surface and hence affecting the operation of a particular highway.

Status of Thyroid Function and Iron Overload in Adolescents and Young Adults with Beta- Thalassemia Major Treated with Deferoxamine in Jordan

Thyroid dysfunction is one of the most frequently reported complications of chronic blood transfusion therapy in patients with beta-thalassemia major (BTM). However, the occurrence of thyroid dysfunction and its possible association with iron overload in BTM patients is still under debate. Therefore, this study aimed to investigate the status of thyroid functions and iron overload in adolescent and young adult patients with BTM in Jordan population. Thirty six BTM patients aged 12-28 years and matched controls were included in this study. All patients have been receiving frequent blood transfusion to maintain pretransfusion hemoglobin concentration above 10 g dl-1 and deferoxamine at a dose of 45 mg kg-1 day-1 (8 h, 5-7 days/week) by subcutaneous infusion. Blood samples were drawn from patients and controls. The status of thyroid functions and iron overload was evaluated by measurements of serum free thyroxine (FT4), triiodothyronine (FT3), thyrotropin (TSH) and serum ferritin level. A number of some hematological and biochemical parameters were also measured. It was found that hematocrit, serum ferritin, hemoglobin, FT3 and zinc, copper mean values were significantly higher in the patients than in the controls (P< 0.05). On other hand, leukocyte, FT4 and TSH mean values were similar to that of the controls. In addition, our data also indicated that all of the above examined parameters were not significantly affected by the patient-s age and gender. Deferoxamine approach for removing excess iron from our BTM patient did not normalize the values of serum ferritin, copper and zinc, suggesting poor compliance with deferoxamine chelation therapy. Thus, we recommend the use of a combination of deferoxamine and deferiprone to reduce the risk of excess of iron in our patients. Furthermore, thyroid dysfunction appears to be a rare complication, because our patients showed normal mean levels for serum TSH and FT4. However, high mean levels of serum ferritin, zinc, copper might be seen as potential risk factors for initiation and development of thyroid dysfunctions and other diseases. Therefore, further studies must be carried out at yearly intervals with large sample number, to detect subclinical thyroid dysfunction cases.

Measuring Cognitive Load - A Solution to Ease Learning of Programming

Learning programming is difficult for many learners. Some researches have found that the main difficulty relates to cognitive load. Cognitive overload happens in programming due to the nature of the subject which is intrinisicly over-bearing on the working memory. It happens due to the complexity of the subject itself. The problem is made worse by the poor instructional design methodology used in the teaching and learning process. Various efforts have been proposed to reduce the cognitive load, e.g. visualization softwares, part-program method etc. Use of many computer based systems have also been tried to tackle the problem. However, little success has been made to alleviate the problem. More has to be done to overcome this hurdle. This research attempts at understanding how cognitive load can be managed so as to reduce the problem of overloading. We propose a mechanism to measure the cognitive load during pre instruction, post instruction and in instructional stages of learning. This mechanism is used to help the instruction. As the load changes the instruction is made to adapt itself to ensure cognitive viability. This mechanism could be incorporated as a sub domain in the student model of various computer based instructional systems to facilitate the learning of programming.