Abstract: This paper produces a new approach for power quality analysis using a windowing technique based on Continuous S-transform (CST). This half-cycle window technique approach can detect almost correctly for initial detection of disturbances i.e. voltage sags, swells, and transients. Samples in half cycle window has been analyzed based continuous S-transform for entire disturbance waveform. The modified parameter has been produced by MATLAB programming m-file based on continuous s-transform. CST has better time frequency and localization property than traditional and also has ability to detect the disturbance under noisy condition correctly. The excellent time-frequency resolution characteristic of the CST makes it the most an attractive candidate for analysis of power system disturbances signals.
Abstract: This paper presents features that characterize power
quality disturbances from recorded voltage waveforms using wavelet
transform. The discrete wavelet transform has been used to detect
and analyze power quality disturbances. The disturbances of interest
include sag, swell, outage and transient. A power system network has
been simulated by Electromagnetic Transients Program. Voltage
waveforms at strategic points have been obtained for analysis, which
includes different power quality disturbances. Then wavelet has been
chosen to perform feature extraction. The outputs of the feature
extraction are the wavelet coefficients representing the power quality
disturbance signal. Wavelet coefficients at different levels reveal the
time localizing information about the variation of the signal.
Abstract: As one result of the project “Reactive Construction
Project Scheduling using Real Time Construction Logistic Data and
Simulation”, a procedure for using data about uncertain resource
availability assumptions in reactive scheduling processes has been
developed. Prediction data about resource availability is generated in
a formalized way using real-time monitoring data e.g. from auto-ID
systems on the construction site and in the supply chains. The paper
focusses on the formalization of the procedure for monitoring
construction logistic processes, for the detection of disturbance and
for generating of new and uncertain scheduling assumptions for the
reactive resource constrained simulation procedure that is and will be
further described in other papers.