Abstract: This paper presents established 3n enumeration procedure for mixed integer optimization problems for solving multi-objective reliability and redundancy allocation problem subject to design constraints. The formulated problem is to find the optimum level of unit reliability and the number of units for each subsystem. A number of illustrative examples are provided and compared to indicate the application of the superiority of the proposed method.
Abstract: One challenge faced by procurement decision-maker during the acquisition process is how to compare similar products from different suppliers and allocate orders among different products or services. This work focuses on allocating orders among multiple suppliers considering rebate. The objective function is to minimize the total acquisition cost including purchasing cost and rebate benefit. Rebate benefit is complex and difficult to estimate at the ordering step. Rebate rules vary for different suppliers and usually change over time. In this work, we developed a system to collect the rebate policies, standardized the rebate policies and developed two-stage optimization models for ordering allocation. Rebate policy with multi-tiers is considered in modeling. The discontinuous cost function of rebate benefit is formulated for different scenarios. A piecewise linear function is used to approximate the discontinuous cost function of rebate benefit. And a Mixed Integer Programing (MIP) model is built for order allocation problem with multi-tier rebate. A case study is presented and it shows that our optimization model can reduce the total acquisition cost by considering rebate rules.
Abstract: In this paper, the single-depot capacitated
location-routing problem under uncertainty is presented. The
problem aims to find the optimal location of a single depot and
the routing of vehicles to serve the customers when the parameters
may change under different circumstances. This problem has many
applications, especially in the area of supply chain management and
distribution systems. To get closer to real-world situations, travel time
of vehicles, the fixed cost of vehicles usage and customers’ demand
are considered as a source of uncertainty. A combined approach
including robust optimization and stochastic programming was
presented to deal with the uncertainty in the problem at hand. For
this purpose, a mixed integer programming model is developed and
a heuristic algorithm based on Variable Neighborhood Search(VNS)
is presented to solve the model. Finally, the computational results
are presented and future research directions are discussed.
Abstract: In this paper, there is concentration on collaborative transportation planning (CTP) among multiple carriers with pickup and delivery requests and time windows. This problem is a vehicle routing problem with constraints from standard vehicle routing problems and new constraints from a real-world application. In the problem, each carrier has a finite number of vehicles, and each request is a pickup and delivery request with time window. Moreover, each carrier has reserved requests, which must be served by itself, whereas its exchangeable requests can be outsourced to and served by other carriers. This collaboration among carriers can help them to reduce total transportation costs. A mixed integer programming model is proposed to the problem. To solve the model, a hybrid algorithm that combines Genetic Algorithm and Simulated Annealing (GASA) is proposed. This algorithm takes advantages of GASA at the same time. After tuning the parameters of the algorithm with the Taguchi method, the experiments are conducted and experimental results are provided for the hybrid algorithm. The results are compared with those obtained by a commercial solver. The comparison indicates that the GASA significantly outperforms the commercial solver.
Abstract: This paper presents a design of a model for planning the distribution logistics operation. The significance of this work relies on the applicability of this fact to the analysis of small and medium enterprises (SMEs) of dry freight in Bogotá. Two stages constitute this implementation: the first one is the place where optimal planning is achieved through a hybrid model developed with mixed integer programming, which considers the transhipment operation based on a combined load allocation model as a classic transshipment model; the second one is the specific routing of that operation through the heuristics of Clark and Wright. As a result, an integral model is obtained to carry out the step by step planning of the distribution of dry freight for SMEs in Bogotá. In this manner, optimum assignments are established by utilizing transshipment centers with that purpose of determining the specific routing based on the shortest distance traveled.
Abstract: Supplier selection problem is one of the important issues of supply chain problems. Two categories of methodologies include qualitative and quantitative approaches which can be applied to supplier selection problems. However, due to the complexities of the problem and lacking of reliable and quantitative data, qualitative approaches are more than quantitative approaches. This study considers operational cost and supplier’s reliability factor and solves the problem by using a quantitative approach. A mixed integer programming model is the primary analytic tool. Analyses of different scenarios with variable cost and reliability structures show that the effectiveness of this approach to the supplier selection problem.
Abstract: In this paper, we consider the vehicle routing problem
with mixed fleet of conventional and heterogenous electric vehicles
and time dependent charging costs, denoted VRP-HFCC, in which
a set of geographically scattered customers have to be served by a
mixed fleet of vehicles composed of a heterogenous fleet of Electric
Vehicles (EVs), having different battery capacities and operating
costs, and Conventional Vehicles (CVs). We include the possibility
of charging EVs in the available charging stations during the routes
in order to serve all customers. Each charging station offers charging
service with a known technology of chargers and time dependent
charging costs. Charging stations are also subject to operating time
windows constraints. EVs are not necessarily compatible with all
available charging technologies and a partial charging is allowed.
Intermittent charging at the depot is also allowed provided that
constraints related to the electricity grid are satisfied.
The objective is to minimize the number of employed vehicles and
then minimize the total travel and charging costs.
In this study, we present a Mixed Integer Programming Model and
develop a Charging Routing Heuristic and a Local Search Heuristic
based on the Inject-Eject routine with different insertion methods. All
heuristics are tested on real data instances.
Abstract: In this paper, mathematical models for permutation flow shop scheduling and job shop scheduling problems are proposed. The first problem is based on a mixed integer programming model. As the problem is NP-complete, this model can only be used for smaller instances where an optimal solution can be computed. For large instances, another model is proposed which is suitable for solving the problem by stochastic heuristic methods. For the job shop scheduling problem, a mathematical model and its main representation schemes are presented.
Abstract: In this article, the design of a Supply Chain Network
(SCN) consisting of several suppliers, production plants, distribution
centers and retailers, is considered. Demands of retailers are
considered stochastic parameters, so we generate amounts of data via
simulation to extract a few demand scenarios. Then a mixed integer
two-stage programming model is developed to optimize
simultaneously two objectives: (1) minimization the fixed and
variable cost, (2) maximization the service level. A weighting method
is utilized to solve this two objective problem and a numerical
example is made to show the performance of the model.
Abstract: This paper introduces a mixed integer programming model to find the optimum development plan for port Anzali. The model minimizes total system costs taking into account both port infrastructure costs and shipping costs. Due to the multipurpose function of the port, the model consists of 1020 decision variables and 2490 constraints. Results of the model determine the optimum number of berths that should be constructed in each period and for each type of cargo. In addition to, the results of sensitivity analysis on port operation quantity provide useful information for managers to choose the best scenario for port planning with the lowest investment risks. Despite all limitations-due to data availability-the model offers a straightforward decision tools to port planners aspiring to achieve optimum port planning steps.
Abstract: Traditionally, project scheduling and material planning have been treated independently. In this research, a mixed integer programming model is presented to integrate project scheduling and materials ordering problems. The goal is to minimize the total material holding and ordering costs. In addition, an efficient metaheuristic algorithm is proposed to solve the model. The proposed algorithm is computationally tested, the results are analyzed, and conclusions are given.
Abstract: This research presents a fuzzy multi-objective model
for a machine selection problem in a flexible manufacturing system
of a tire company. Two main objectives are minimization of an
average machine error and minimization of the total setup time.
Conventionally, the working team uses trial and error in selecting a
pressing machine for each task due to the complexity and constraints
of the problem. So, both objectives may not satisfy. Moreover, trial
and error takes a lot of time to get the final decision. Therefore, in
this research preemptive fuzzy goal programming model is developed
for solving this multi-objective problem. The proposed model can
obtain the appropriate results that the Decision Making (DM) is
satisfied for both objectives. Besides, alternative choice can be easily
generated by varying the satisfaction level. Additionally, decision
time can be reduced by using the model, which includes all
constraints of the system to generate the solutions. A numerical
example is also illustrated to show the effectiveness of the proposed
model.
Abstract: The objective of this research is to calculate the
optimal inventory lot-sizing for each supplier and minimize the total
inventory cost which includes joint purchase cost of the products,
transaction cost for the suppliers, and holding cost for remaining
inventory. Genetic algorithms (GAs) are applied to the multi-product
and multi-period inventory lot-sizing problems with supplier
selection under storage space. Also a maximum storage space for the
decision maker in each period is considered. The decision maker
needs to determine what products to order in what quantities with
which suppliers in which periods. It is assumed that demand of
multiple products is known over a planning horizon. The problem is
formulated as a mixed integer programming and is solved with the
GAs. The detailed computation results are presented.
Abstract: This paper presents the development of an electricity simulation model taking into account electrical network constraints, applied on the Belgian power system. The base of the model is optimizing an extensive Unit Commitment (UC) problem through the use of Mixed Integer Linear Programming (MILP). Electrical constraints are incorporated through the implementation of a DC load flow. The model encloses the Belgian power system in a 220 – 380 kV high voltage network (i.e., 93 power plants and 106 nodes). The model features the use of pumping storage facilities as well as the inclusion of spinning reserves in a single optimization process. Solution times of the model stay below reasonable values.
Abstract: We address the balancing problem of transfer lines in
this paper to find the optimal line balancing that minimizes the nonproductive
time. We focus on the tool change time and face
orientation change time both of which influence the makespane. We
consider machine capacity limitations and technological constraints
associated with the manufacturing process of auto cylinder heads.
The problem is represented by a mixed integer programming model
that aims at distributing the design features to workstations and
sequencing the machining processes at a minimum non-productive
time. The proposed model is solved by an algorithm established using
linearization schemes and Benders- decomposition approach. The
experiments show the efficiency of the algorithm in reaching the
exact solution of small and medium problem instances at reasonable
time.
Abstract: This study considers the problem of determining
operation and maintenance schedules for a containership equipped
with components during its sailing according to a pre-determined
navigation schedule. The operation schedule, which specifies work
time of each component, determines the due-date of each maintenance
activity, and the maintenance schedule specifies the actual start
time of each maintenance activity. The main constraints are component
requirements, workforce availability, working time limitation,
and inter-maintenance time. To represent the problem mathematically,
a mixed integer programming model is developed. Then,
due to the problem complexity, we suggest a heuristic for the objective
of minimizing the sum of earliness and tardiness between the
due-date and the starting time of each maintenance activity. Computational
experiments were done on various test instances and the
results are reported.
Abstract: Bus networks design is an important problem in
public transportation. The main step to this design, is determining the
number of required terminals and their locations. This is an especial
type of facility location problem, a large scale combinatorial
optimization problem that requires a long time to be solved.
The genetic algorithm (GA) is a search and optimization technique
which works based on evolutionary principle of natural
chromosomes. Specifically, the evolution of chromosomes due to the
action of crossover, mutation and natural selection of chromosomes
based on Darwin's survival-of-the-fittest principle, are all artificially
simulated to constitute a robust search and optimization procedure.
In this paper, we first state the problem as a mixed integer
programming (MIP) problem. Then we design a new crossover and
mutation for bus terminal location problem (BTLP). We tested the
different parameters of genetic algorithm (for a sample problem) and
obtained the optimal parameters for solving BTLP with numerical try
and error.