Abstract: This paper presents a genetic algorithm based loading methodology for a capacity constrained job-shop with the consideration of alternative process plans for each part to be produced. Performance analysis of the proposed methodology is carried out for two case studies by considering two different manufacturing scenarios. Results obtained indicate that the methodology is quite effective in improving the shop load balance, and hence, it can be included in the frameworks of manufacturing planning systems of job-shop oriented industries.
Abstract: The planning in manufacturing system is becoming complicated day by day due to the expanding networks and shortage of skilled people to manage change. Consequently, faster lead time and rising demands for eco-efficient evaluation of manufacturing products and processes need exploitation of new and intelligent knowledge management concepts for manufacturing planning. This paper highlights motivation for incorporation of new features in the manufacturing planning system. Furthermore, it elaborates requirements for the development of intelligent knowledge management concept to support planning related decisions. Afterwards, the derived concept is presented in this paper considering two case studies. The first case study is concerned with the automotive ramp-up planning. The second case study specifies requirements for knowledge management system to support decisions in eco-efficient evaluation of manufacturing products and processes
Abstract: Product Lead Time (PLT) is the period of time from
receiving a customer's order to delivering the final product. PLT is an
indicator of the manufacturing controllability, efficiency and
performance. Due to the explosion in the rate of technological
innovations and the rapid changes in the nature of manufacturing
processes, manufacturing firms can bring the new products to market
quicker only if they can reduce their PLT and speed up the rate at
which they can design, plan, control, and manufacture. Although
there is a substantial body of research on manufacturing relating to
cost and quality issues, there is no much specific research conducted
in relation to the formulation of PLT, despite its significance and
importance. This paper analyzes and formulates PLT which can be
used as a guideline for achieving the shorter PLT. Further more this
paper identifies the causes of delay and factors that contributes to the
increased product lead-time.