Abstract: One of the mayor problems of programming a cruise
circuit is to decide which destinations to include and which don-t.
Thus a decision problem emerges, that might be solved using a linear
and goal programming approach. The problem becomes more
complex if several boats in the fleet must be programmed in a limited
schedule, trying their capacity matches best a seasonal demand and
also attempting to minimize the operation costs. Moreover, the
programmer of the company should consider the time of the
passenger as a limited asset, and would like to maximize its usage.
The aim of this work is to design a method in which, using linear and
goal programming techniques, a model to design circuits for the
cruise company decision maker can achieve an optimal solution
within the fleet schedule.