Abstract: Taiwan’s infrastructure is gradually deteriorating, while resources for maintenance and replacement are increasingly limited, raising the urgent need for methods for maintaining existing infrastructure within constrained budgets. Infrastructure value evaluation is used to enhance the efficiency of infrastructure maintenance work, allowing administrators to quickly assess the maintenance needs and performance by observing variation in infrastructure value. This research establishes a value evaluation model for Taiwan’s highway box girder bridges. The operating mechanism and process of the model are illustrated in a practical case.
Abstract: Visual simulation has emerged as a key planning tool in built environment because it enables architects, engineers and project managers to visualize construction process evolution before the project actual commences. This provides an efficient technology for reducing time and cost through planning and controlling resources, machines and materials. With the development of infrastructure projects and the massive civil constructions such as bridges, urban tunnels and highways as well as sensitivity of their construction operations, it is very necessary to apply proper planning methods. Implementation of visual techniques into management of construction projects can provide a fundamental foundation for projects with massive activities and duplicate items. So, the purpose of this paper is to develop visual simulation management techniques for infrastructure projects such as highways bridges by the use of Four-Dimensional Computer-Aided design Models. This project simulates operational assembly-line for Box-Girder Concrete Bridges which it would be able to optimize the sequence and interaction of project activities and on the other hand, it would minimize any unintended conflicts prior to project start. In this paper, after introducing the various planning methods by building information model and concrete bridges in highways, an executive case study is demonstrated and then a visual technique (4D CAD) will be applied for the case. In the final step, the user feedback for interacting by this system evaluated according to six criteria.
Abstract: In general, codes and regulations consider seismic
loads only for completed structures of the bridges while, evaluation
of incomplete structure of bridges, especially those constructed by
free cantilever method, under these loads is also of great importance.
Hence, this research tried to study the behavior of incomplete
structure of common bridge type (box girder bridge), in construction
phase under vertical seismic loads. Subsequently, the paper provided
suitable guidelines and solutions to resist this destructive
phenomenon. Research results proved that use of preventive methods
can significantly reduce the stresses resulted from vertical seismic
loads in box cross sections to an acceptable range recommended by
design codes.
Abstract: It is necessary to evaluate the bridges conditions and
strengthen bridges or parts of them. The reinforcement necessary due
to some reasons can be summarized as: First, a changing in use of
bridge could produce internal forces in a part of structural which
exceed the existing cross-sectional capacity. Second, bridges may
also need reinforcement because damage due to external factors
which reduced the cross-sectional resistance to external loads. One of
other factors could listed here its misdesign in some details, like
safety of bridge or part of its.This article identify the design demands
of Qing Shan bridge located in is in Heilongjiang Province He gang -
Nen Jiang Road 303 provincial highway, Wudalianchi area, China, is
an important bridge in the urban areas. The investigation program
was include the observation and evaluate the damage in T- section
concrete beams , prestressed concrete box girder bridges section in
additional evaluate the whole state of bridge includes the pier ,
abutments , bridge decks, wings , bearing and capping beam, joints,
........etc. The test results show that the bridges in general structural
condition are good. T beam span No 10 were observed, crack
extended upward along the ribbed T beam, and continue to the T
beam flange. Crack width varying between 0.1mm to 0.4mm, the
maximum about 0.4mm. The bridge needs to be improved flexural
bending strength especially at for T beam section.