Abstract: The study aimed to investigate characteristics of
vegetative tissue for taxonomic purpose and possibly trend of waste
application in industry. Stems and branches of 15 species in Solanum
found in Thailand were prepared for fiber and examined by light
microscopy. Microstructural characteristic data of fiber i.e. fiber
length and width, fiber lumen diameter and fiber cell wall thickness
were recorded. The longest average fiber cell length (>3.9 mm.) were
obtained in S. lycopersicum L. and S. tuberosum L. Fiber cells from
S. lycopersicum also revealed the widest average diameter of whole
cell and its lumen at >45.5 μm and >29 μm respectively. However
fiber cells with thickest wall of > 9.6 μm were belonged to the
ornamental tree species, S. wrightii Benth. The results showed that
the slenderness ratio, Runkel ratio, and flexibility coefficient, with
potentially suitable for feedstock in paper industry fell in 4 exotic
species, i.e. Solanumamericanum L., S. lycopersicum, S.
seaforthianum Andr., and S. tuberosum L
Abstract: In this work, bending fatigue life of notched
specimens with various notch geometries and dimensions is
investigated by experiment and Manson-Caffin theoretical method. In
this theoretical method, fatigue life of notched specimens is
calculated using the fatigue life obtained from the experiments for
plain specimens (without notch). Three notch geometries including
∪-shape, ∨-shape and C -shape notches are considered in this
investigation. The experiments are conducted on a rotary bending
Moore machine. The specimens are made of a low carbon steel alloy,
which has wide application in industry. The stress- life curves are
captured for all notched specimen by experiment. The results indicate
that Manson-Caffin analytical method cannot adequately predict
the fatigue life of notched specimen. However, it seems that the
difference between the experiments and Manson-Caffin predictions
can be compensated by a proportional factor.
Abstract: This paper aims to develop an algorithm of finite
capacity material requirement planning (FCMRP) system for a multistage
assembly flow shop. The developed FCMRP system has two
main stages. The first stage is to allocate operations to the first and
second priority work centers and also determine the sequence of the
operations on each work center. The second stage is to determine the
optimal start time of each operation by using a linear programming
model. Real data from a factory is used to analyze and evaluate the
effectiveness of the proposed FCMRP system and also to guarantee a
practical solution to the user. There are five performance measures,
namely, the total tardiness, the number of tardy orders, the total
earliness, the number of early orders, and the average flow-time. The
proposed FCMRP system offers an adjustable solution which is a
compromised solution among the conflicting performance measures.
The user can adjust the weight of each performance measure to
obtain the desired performance. The result shows that the combination
of FCMRP NP3 and EDD outperforms other combinations
in term of overall performance index. The calculation time for the
proposed FCMRP system is about 10 minutes which is practical for
the planners of the factory.