Abstract: The one of best robust search technique on large scale
search area is heuristic and meta heuristic approaches. Especially in
issue that the exploitation of combinatorial status in the large scale
search area prevents the solution of the problem via classical
calculating methods, so such problems is NP-complete. in this
research, the problem of winner determination in combinatorial
auctions have been formulated and by assessing older heuristic
functions, we solve the problem by using of genetic algorithm and
would show that this new method would result in better performance
in comparison to other heuristic function such as simulated annealing
greedy approach.
Abstract: The Ant Colony Optimization (ACO) is a metaheuristic inspired by the behavior of real ants in their search for the shortest paths to food sources. It has recently attracted a lot of attention and has been successfully applied to a number of different optimization problems. Due to the importance of the feature selection problem and the potential of ACO, this paper presents a novel method that utilizes the ACO algorithm to implement a feature subset search procedure. Initial results obtained using the classification of speech segments are very promising.
Abstract: There are two common types of operational research techniques, optimisation and metaheuristic methods. The latter may be defined as a sequential process that intelligently performs the exploration and exploitation adopted by natural intelligence and strong inspiration to form several iterative searches. An aim is to effectively determine near optimal solutions in a solution space. In this work, a type of metaheuristics called Ant Colonies Optimisation, ACO, inspired by a foraging behaviour of ants was adapted to find optimal solutions of eight non-linear continuous mathematical models. Under a consideration of a solution space in a specified region on each model, sub-solutions may contain global or multiple local optimum. Moreover, the algorithm has several common parameters; number of ants, moves, and iterations, which act as the algorithm-s driver. A series of computational experiments for initialising parameters were conducted through methods of Rigid Simplex, RS, and Modified Simplex, MSM. Experimental results were analysed in terms of the best so far solutions, mean and standard deviation. Finally, they stated a recommendation of proper level settings of ACO parameters for all eight functions. These parameter settings can be applied as a guideline for future uses of ACO. This is to promote an ease of use of ACO in real industrial processes. It was found that the results obtained from MSM were pretty similar to those gained from RS. However, if these results with noise standard deviations of 1 and 3 are compared, MSM will reach optimal solutions more efficiently than RS, in terms of speed of convergence.
Abstract: Traditionally, project scheduling and material planning have been treated independently. In this research, a mixed integer programming model is presented to integrate project scheduling and materials ordering problems. The goal is to minimize the total material holding and ordering costs. In addition, an efficient metaheuristic algorithm is proposed to solve the model. The proposed algorithm is computationally tested, the results are analyzed, and conclusions are given.
Abstract: A direct search approach to determine optimal reservoir operating is proposed with ant colony optimization for continuous domains (ACOR). The model is applied to a system of single reservoir to determine the optimum releases during 42 years of monthly steps. A disadvantage of ant colony based methods and the ACOR in particular, refers to great amount of computer run time consumption. In this study a highly effective procedure for decreasing run time has been developed. The results are compared to those of a GA based model.
Abstract: We propose a control design scheme that aims to
prevent undesirable liquid outpouring and suppress sloshing during
the forward and backward tilting phases of the pouring process, for
the case of liquid containers carried by manipulators. The proposed
scheme combines a partial inverse dynamics controller with a PID
controller, tuned with the use of a “metaheuristic" search algorithm.
The “metaheuristic" search algorithm tunes the PID controller based
on simulation results of the plant-s linearization around the operating
point corresponding to the critical tilting angle, where outpouring
initiates. Liquid motion is modeled using the well-known pendulumtype
model. However, the proposed controller does not require
measurements of the liquid-s motion within the tank.
Abstract: Feature selection is an important step in many pattern
classification problems. It is applied to select a subset of features,
from a much larger set, such that the selected subset is sufficient to
perform the classification task. Due to its importance, the problem of
feature selection has been investigated by many researchers. In this
paper, a novel feature subset search procedure that utilizes the Ant
Colony Optimization (ACO) is presented. The ACO is a
metaheuristic inspired by the behavior of real ants in their search for
the shortest paths to food sources. It looks for optimal solutions by
considering both local heuristics and previous knowledge. When
applied to two different classification problems, the proposed
algorithm achieved very promising results.
Abstract: This work presents a multiple objective linear programming (MOLP) model based on the desirability function approach for solving the aggregate production planning (APP) decision problem upon Masud and Hwang-s model. The proposed model minimises total production costs, carrying or backordering costs and rates of change in labor levels. An industrial case demonstrates the feasibility of applying the proposed model to the APP problems with three scenarios of inventory levels. The proposed model yields an efficient compromise solution and the overall levels of DM satisfaction with the multiple combined response levels. There has been a trend to solve complex planning problems using various metaheuristics. Therefore, in this paper, the multi-objective APP problem is solved by hybrid metaheuristics of the hunting search (HuSIHSA) and firefly (FAIHSA) mechanisms on the improved harmony search algorithm. Results obtained from the solution of are then compared. It is observed that the FAIHSA can be used as a successful alternative solution mechanism for solving APP problems over three scenarios. Furthermore, the FAIHSA provides a systematic framework for facilitating the decision-making process, enabling a decision maker interactively to modify the desirability function approach and related model parameters until a good optimal solution is obtained with proper selection of control parameters when compared.
Abstract: This paper presents an algorithm which
combining ant colony optimization in the dynamic
programming for solving a dynamic facility layout problem.
The problem is separated into 2 phases, static and dynamic
phase. In static phase, ant colony optimization is used to find
the best ranked of layouts for each period. Then the dynamic
programming (DP) procedure is performed in the dynamic
phase to evaluate the layout set during multi-period planning
horizon. The proposed algorithm is tested over many
problems with size ranging from 9 to 49 departments, 2 and 4
periods. The experimental results show that the proposed
method is an alternative way for the plant layout designer to
determine the layouts during multi-period planning horizon.
Abstract: This research deals with a flexible flowshop
scheduling problem with arrival and delivery of jobs in groups and
processing them individually. Due to the special characteristics of
each job, only a subset of machines in each stage is eligible to
process that job. The objective function deals with minimization of
sum of the completion time of groups on one hand and minimization
of sum of the differences between completion time of jobs and
delivery time of the group containing that job (waiting period) on the
other hand. The problem can be stated as FFc / rj , Mj / irreg which
has many applications in production and service industries. A
mathematical model is proposed, the problem is proved to be NPcomplete,
and an effective heuristic method is presented to schedule
the jobs efficiently. This algorithm can then be used within the body
of any metaheuristic algorithm for solving the problem.
Abstract: In this paper, a framework for the simplification and
standardization of metaheuristic related parameter-tuning by applying
a four phase methodology, utilizing Design of Experiments and
Artificial Neural Networks, is presented. Metaheuristics are multipurpose
problem solvers that are utilized on computational optimization
problems for which no efficient problem specific algorithm
exist. Their successful application to concrete problems requires the
finding of a good initial parameter setting, which is a tedious and
time consuming task. Recent research reveals the lack of approach
when it comes to this so called parameter-tuning process. In the
majority of publications, researchers do have a weak motivation for
their respective choices, if any. Because initial parameter settings
have a significant impact on the solutions quality, this course of
action could lead to suboptimal experimental results, and thereby
a fraudulent basis for the drawing of conclusions.
Abstract: This article proposes an Ant Colony Optimization
(ACO) metaheuristic to minimize total makespan for scheduling a set
of jobs and assign workers for uniformly related parallel machines.
An algorithm based on ACO has been developed and coded on a
computer program Matlab®, to solve this problem. The paper
explains various steps to apply Ant Colony approach to the problem
of minimizing makespan for the worker assignment & jobs
scheduling problem in a parallel machine model and is aimed at
evaluating the strength of ACO as compared to other conventional
approaches. One data set containing 100 problems (12 Jobs, 03
machines and 10 workers) which is available on internet, has been
taken and solved through this ACO algorithm. The results of our
ACO based algorithm has shown drastically improved results,
especially, in terms of negligible computational effort of CPU, to
reach the optimal solution. In our case, the time taken to solve all 100
problems is even lesser than the average time taken to solve one
problem in the data set by other conventional approaches like GA
algorithm and SPT-A/LMC heuristics.
Abstract: Network reconfiguration in distribution system is realized by changing the status of sectionalizing switches to reduce the power loss in the system. This paper presents a new method which applies an artificial bee colony algorithm (ABC) for determining the sectionalizing switch to be operated in order to solve the distribution system loss minimization problem. The ABC algorithm is a new population based metaheuristic approach inspired by intelligent foraging behavior of honeybee swarm. The advantage of ABC algorithm is that it does not require external parameters such as cross over rate and mutation rate as in case of genetic algorithm and differential evolution and it is hard to determine these parameters in prior. The other advantage is that the global search ability in the algorithm is implemented by introducing neighborhood source production mechanism which is a similar to mutation process. To demonstrate the validity of the proposed algorithm, computer simulations are carried out on 14, 33, and 119-bus systems and compared with different approaches available in the literature. The proposed method has outperformed the other methods in terms of the quality of solution and computational efficiency.
Abstract: In the modern manufacturing systems, the use of
thermal cutting techniques using oxyfuel, plasma and laser have
become indispensable for the shape forming of high quality complex
components; however, the conventional chip removal production
techniques still have its widespread space in the manufacturing
industry. Both these types of machining operations require the
positioning of end effector tool at the edge where the cutting process
commences. This repositioning of the cutting tool in every machining
operation is repeated several times and is termed as non-productive
time or airtime motion. Minimization of this non-productive
machining time plays an important role in mass production with high
speed machining. As, the tool moves from one region to the other by
rapid movement and visits a meticulous region once in the whole
operation, hence the non-productive time can be minimized by
synchronizing the tool movements. In this work, this problem is
being formulated as a general travelling salesman problem (TSP) and
a genetic algorithm approach has been applied to solve the same. For
improving the efficiency of the algorithm, the GA has been
hybridized with a noble special heuristic and simulating annealing
(SA). In the present work a novel heuristic in the combination of GA
has been developed for synchronization of toolpath movements
during repositioning of the tool. A comparative analysis of new Meta
heuristic techniques with simple genetic algorithm has been
performed. The proposed metaheuristic approach shows better
performance than simple genetic algorithm for minimization of nonproductive
toolpath length. Also, the results obtained with the help of
hybrid simulated annealing genetic algorithm (HSAGA) are also
found better than the results using simple genetic algorithm only.
Abstract: The vehicle routing problem (VRP) is a famous combinatorial optimization problem. Because of its well-known difficulty, metaheuristics are the most appropriate methods to tackle large and realistic instances. The goal of this paper is to highlight the key ideas for designing VRP metaheuristics according to the following criteria: efficiency, speed, robustness, and ability to take advantage of the problem structure. Such elements can obviously be used to build solution methods for other combinatorial optimization problems, at least in the deterministic field.