Groundwater Seepage Estimation into Amirkabir Tunnel Using Analytical Methods and DEM and SGR Method

In this paper, groundwater seepage into Amirkabir
tunnel has been estimated using analytical and numerical methods for
14 different sections of the tunnel. Site Groundwater Rating (SGR)
method also has been performed for qualitative and quantitative
classification of the tunnel sections. The obtained results of above
mentioned methods were compared together. The study shows
reasonable accordance with results of the all methods unless for two
sections of tunnel. In these two sections there are some significant
discrepancies between numerical and analytical results mainly
originated from model geometry and high overburden. SGR and the
analytical and numerical calculations, confirm high concentration of
seepage inflow in fault zones. Maximum seepage flow into tunnel has
been estimated 0.425 lit/sec/m using analytical method and 0.628
lit/sec/m using numerical method occured in crashed zone. Based on
SGR method, six sections of 14 sections in Amirkabir tunnel axis are
found to be in "No Risk" class that is supported by the analytical and
numerical seepage value of less than 0.04 lit/sec/m.





References:
[1] Goodman, RE, Moye, DG, Schalkwyk, AV, Javandel, I, (1965)
Groundwater inflows during tunnel driving. Bull. Ass. Eng. Geologists
2, pp. 35–56.
[2] Freeze RA, Cherry JA, (1979) Groundwater: Prentice-Hall, Englewood
Cliffs, New Jersey.
[3] Heuer RE (1995) Estimating rock-tunnel water inflow. In Proceeding of
the Rapid Excavation and Tunneling Conference. Ed. G. E. Williamson
and I. M. Growring; pp. 41-60.
[4] Lei S (1999) An analytical solution for steady flow into a tunnel. Ground
Water 37, pp. 23–26.
[5] El Tani M (1999) Water inflow into tunnels. Proceedings of the World
Tunnel Congress ITA- ITES 1999, Oslo, pp. 61–70, Balkema.
[6] Karlsrud K (2001) Water control when tunneling under urban areas in
the Olso region. NFF publication, 2001. 12(4): pp. 27-33
[7] Lombardi G (2002) Private communication.
[8] El Tani M (2003) Circular tunnel in a semi-infinite aquifer. Tunn.
Undergr. Space Technol. 18 (1), pp. 49-55.
[9] Farhadian H, Aalianvari A, Katibeh H, (2012) Optimization of
Analytical Equations of Groundwater Seepage into Tunnels: A Case
Study of Amirkabir Tunnel. J. Geo. Soc. India 80, pp. 96-100.
[10] Katibeh H, Aalianvari A (2009) Development of a new method for
tunnel site rating from groundwater hazard point of view. J. App. Sci. 9,
pp. 1496-1502.
[11] Jing I, Hudson JA (2002) Numerical methods in Roch Mechanics.
International journal of rock mechanincs and mining science, vol. 39,
pp. 409-427.
[12] Itasca (2004) UDEC manuals, Minneapolis: Itasca Consulting group Inc.
[13] SCE Company (2006) Geological and Engineering Geological Report
for Amirkabir Water Conveyance Tunnel Project (Lot1), unpublished
report.