The Design of Self-evolving Artificial Immune System II for Permutation Flow-shop Problem

Artificial Immune System is adopted as a Heuristic Algorithm to solve the combinatorial problems for decades. Nevertheless, many of these applications took advantage of the benefit for applications but seldom proposed approaches for enhancing the efficiency. In this paper, we continue the previous research to develop a Self-evolving Artificial Immune System II via coordinating the T and B cell in Immune System and built a block-based artificial chromosome for speeding up the computation time and better performance for different complexities of problems. Through the design of Plasma cell and clonal selection which are relative the function of the Immune Response. The Immune Response will help the AIS have the global and local searching ability and preventing trapped in local optima. From the experimental result, the significant performance validates the SEAIS II is effective when solving the permutation flows-hop problems.

Just-In-Time for Reducing Inventory Costs throughout a Supply Chain: A Case Study

Supply Chain Management (SCM) is the integration between manufacturer, transporter and customer in order to form one seamless chain that allows smooth flow of raw materials, information and products throughout the entire network that help in minimizing all related efforts and costs. The main objective of this paper is to develop a model that can accept a specified number of spare-parts within the supply chain, simulating its inventory operations throughout all stages in order to minimize the inventory holding costs, base-stock, safety-stock, and to find the optimum quantity of inventory levels, thereby suggesting a way forward to adapt some factors of Just-In-Time to minimizing the inventory costs throughout the entire supply chain. The model has been developed using Micro- Soft Excel & Visual Basic in order to study inventory allocations in any network of the supply chain. The application and reproducibility of this model were tested by comparing the actual system that was implemented in the case study with the results of the developed model. The findings showed that the total inventory costs of the developed model are about 50% less than the actual costs of the inventory items within the case study.

UAE National ID Programme Case Study

This article provides some insight into the implementation of the national ID programme in the United Arab Emirates (UAE). The fundamental aim is to contribute to the existing body of knowledge in the field, as it sheds light on some of the lessons learned from the programme that is believed to widening the knowledge horizons of those involved in such initiatives.

Analysis of a WDM System for Tanzania

Internet infrastructures in most places of the world have been supported by the advancement of optical fiber technology, most notably wavelength division multiplexing (WDM) system. Optical technology by means of WDM system has revolutionized long distance data transport and has resulted in high data capacity, cost reductions, extremely low bit error rate, and operational simplification of the overall Internet infrastructure. This paper analyses and compares the system impairments, which occur at data transmission rates of 2.5Gb/s and 10 Gb/s per wavelength channel in our proposed optical WDM system for Internet infrastructure in Tanzania. The results show that the data transmission rate of 2.5 Gb/s has minimum system impairments compared with a rate of 10 Gb/s per wavelength channel, and achieves a sufficient system performance to provide a good Internet access service.

Simulation of a Sustainable Cement Supply Chain; Proposal Model Review

In recent years, sustainable supply chain management (SSCM) has been widely researched in academic domain. However, due to the traditional operational role and the complexity of supply chain management in the cement industry, a relatively small amount of research has been conducted on cement supply chain simulation integrated with sustainability criteria. This paper analyses the cement supply chain operations using the Push-Pull supply chain frameworks, the Life Cycle Assessment (LCA) methodology; and proposal integration approach, proposes three supply chain scenarios based on Make-To-Stock (MTS), Pack-To-Order (PTO) and Grind- To-Order (GTO) strategies. A Discrete-Event Simulation (DES) model of SSCM is constructed using Arena software to implement the three-target scenarios. We conclude with the simulation results that (GTO) is the optimal supply chain strategy that demonstrates the best economic, ecological and social performance in the cement industry.

The Status Info Processing and Keeping System for Production Equipment

With the globalized production and logistics environment, the need for reducing the product development interval and lead time, having a faster response to orders, conforming to quality standards, fair tracking, and boosting information exchanging activities with customers and partners, and coping with changes in the management environment, manufacturers are in dire need of an information management system in their manufacturing environments. There are lots of information systems that have been designed to manage the condition or operation of equipment in the field but existing systems have a decentralized architecture, which is not unified. Also, these systems cannot effectively handle the status data extraction process upon encountering a problem related to protocols or changes in the equipment or the setting. In this regard, this paper will introduce a system for processing and saving the status info of production equipment, which uses standard representation formats, to enable flexible responses to and support for variables in the field equipment. This system can be used for a variety of manufacturing and equipment settings and is capable of interacting with higher-tier systems such as MES.

Process-Oriented Learning Requirements for Employees and for Organizations

Using activity theory, organisational theory and didactics as theoretical foundations, a comprehensive model of the organisational dimensions relevant for learning and knowledge transfer will be developed. In a second step, a Learning Assessment Guideline will be elaborated. This guideline will be designed to permit a targeted analysis of organisations to identify the status quo in those areas crucial to the implementation of learning and knowledge transfer. In addition, this self-analysis tool will enable learning managers to select adequate didactic models for e- and blended learning. As part of the European Integrated Project "Process-oriented Learning and Information Exchange" (PROLIX), this model of organisational prerequisites for learning and knowledge transfer will be empirically tested in four profit and non-profit organisations in Great Britain, Germany and France (to be finalized in autumn 2006). The findings concern not only the capability of the model of organisational dimensions, but also the predominant perceptions of and obstacles to learning in organisations.

An Integrated Design Evaluation and Assembly Sequence Planning Model using a Particle Swarm Optimization Approach

In the traditional concept of product life cycle management, the activities of design, manufacturing, and assembly are performed in a sequential way. The drawback is that the considerations in design may contradict the considerations in manufacturing and assembly. The different designs of components can lead to different assembly sequences. Therefore, in some cases, a good design may result in a high cost in the downstream assembly activities. In this research, an integrated design evaluation and assembly sequence planning model is presented. Given a product requirement, there may be several design alternative cases to design the components for the same product. If a different design case is selected, the assembly sequence for constructing the product can be different. In this paper, first, the designed components are represented by using graph based models. The graph based models are transformed to assembly precedence constraints and assembly costs. A particle swarm optimization (PSO) approach is presented by encoding a particle using a position matrix defined by the design cases and the assembly sequences. The PSO algorithm simultaneously performs design evaluation and assembly sequence planning with an objective of minimizing the total assembly costs. As a result, the design cases and the assembly sequences can both be optimized. The main contribution lies in the new concept of integrated design evaluation and assembly sequence planning model and the new PSO solution method. The test results show that the presented method is feasible and efficient for solving the integrated design evaluation and assembly planning problem. In this paper, an example product is tested and illustrated.

Information Systems Outsourcing Reasons and Risks: An Empirical Study

Outsourcing, a management practice strongly consolidated within the area of Information Systems, is currently going through a stage of unstoppable growth. This paper makes a proposal about the main reasons which may lead firms to adopt Information Systems Outsourcing. It will equally analyse the potential risks that IS clients are likely to face. An additional objective is to assess these reasons and risks in the case of large Spanish firms, while simultaneously examining their evolution over time.

Investigating Relationship between Product Features and Supply Chain Integration

This paper addresses integration issues in supply chain, and tries to investigate how different aspects of integration are linked with some product features. Integration in this study is interpreted as "internal", "upstream" (supply), and "downstream" (demand). Two features of product innovative and quality are considered. To examine the relationships between supply chain integrations – as mentioned above, and product features, this research follows the survey method in automotive industry.The results imply that supply chain upstream integration has a higher impact on product quality, comparing to internal and supply chain downstream integrations. It is also found that the influence of supply chain downstream integration on product innovation is greater than other variables. In brief, this study mainly tackles the importance of specific level of supply chain integrations and its effects on two product features.

Modelling and Analysis of a Robust Control of Manufacturing Systems: Flow-Quality Approach

This paper proposes a modeling method of the laws controlling manufacturing systems with temporal and non temporal constraints. A methodology of robust control construction generating the margins of passive and active robustness is being elaborated. Indeed, two paramount models are presented in this paper. The first utilizes the P-time Petri Nets which is used to manage the flow type disturbances. The second, the quality model, exploits the Intervals Constrained Petri Nets (ICPN) tool which allows the system to preserve its quality specificities. The redundancy of the robustness of the elementary parameters between passive and active is also used. The final model built allows the correlation of temporal and non temporal criteria by putting two paramount models in interaction. To do so, a set of definitions and theorems are employed and affirmed by applicator examples.

A Hybrid Genetic Algorithm for the Sequence Dependent Flow-Shop Scheduling Problem

Flow-shop scheduling problem (FSP) deals with the scheduling of a set of jobs that visit a set of machines in the same order. The FSP is NP-hard, which means that an efficient algorithm for solving the problem to optimality is unavailable. To meet the requirements on time and to minimize the make-span performance of large permutation flow-shop scheduling problems in which there are sequence dependent setup times on each machine, this paper develops one hybrid genetic algorithms (HGA). Proposed HGA apply a modified approach to generate population of initial chromosomes and also use an improved heuristic called the iterated swap procedure to improve initial solutions. Also the author uses three genetic operators to make good new offspring. The results are compared to some recently developed heuristics and computational experimental results show that the proposed HGA performs very competitively with respect to accuracy and efficiency of solution.

Defects in Open Source Software: The Role of Online Forums

Free and open source software is gaining popularity at an unprecedented rate of growth. Organizations despite some concerns about the quality have been using them for various purposes. One of the biggest concerns about free and open source software is post release software defects and their fixing. Many believe that there is no appropriate support available to fix the bugs. On the contrary some believe that due to the active involvement of internet user in online forums, they become a major source of communicating the identification and fixing of defects in open source software. The research model of this empirical investigation establishes and studies the relationship between open source software defects and online public forums. The results of this empirical study provide evidence about the realities of software defects myths of open source software. We used a dataset consist of 616 open source software projects covering a broad range of categories to study the research model of this investigation. The results of this investigation show that online forums play a significant role identifying and fixing the defects in open source software.

Kaikaku - Radical Improvement in Production

Considering today-s increasing speed of change, radical and innovative improvement - Kaikaku, is a necessity parallel to continuous incremental improvement - Kaizen, especially for SME-s in order to attain the competitive edge needed to be profitable. During 2011, a qualitative single case study with the objective of realizing a kaikaku in production has been conducted. The case study was run as a one year project using a collaborative approach including both researchers and company representatives. The case study was conducted with the purpose of gaining further knowledge about kaikaku realization as well as its implications. The empirical results provide insights about the great productivity results achieved by applying a specific kaikaku realization approach. However, it also sheds light on the difficulty and contradiction of combining innovation management and production system development.

A Hybrid Multi Objective Algorithm for Flexible Job Shop Scheduling

Scheduling for the flexible job shop is very important in both fields of production management and combinatorial optimization. However, it quit difficult to achieve an optimal solution to this problem with traditional optimization approaches owing to the high computational complexity. The combining of several optimization criteria induces additional complexity and new problems. In this paper, a Pareto approach to solve the multi objective flexible job shop scheduling problems is proposed. The objectives considered are to minimize the overall completion time (makespan) and total weighted tardiness (TWT). An effective simulated annealing algorithm based on the proposed approach is presented to solve multi objective flexible job shop scheduling problem. An external memory of non-dominated solutions is considered to save and update the non-dominated solutions during the solution process. Numerical examples are used to evaluate and study the performance of the proposed algorithm. The proposed algorithm can be applied easily in real factory conditions and for large size problems. It should thus be useful to both practitioners and researchers.

Investigations Into the Turning Parameters Effect on the Surface Roughness of Flame Hardened Medium Carbon Steel with TiN-Al2O3-TiCN Coated Inserts based on Taguchi Techniques

The aim of this research is to evaluate surface roughness and develop a multiple regression model for surface roughness as a function of cutting parameters during the turning of flame hardened medium carbon steel with TiN-Al2O3-TiCN coated inserts. An experimental plan of work and signal-to-noise ratio (S/N) were used to relate the influence of turning parameters to the workpiece surface finish utilizing Taguchi methodology. The effects of turning parameters were studied by using the analysis of variance (ANOVA) method. Evaluated parameters were feed, cutting speed, and depth of cut. It was found that the most significant interaction among the considered turning parameters was between depth of cut and feed. The average surface roughness (Ra) resulted by TiN-Al2O3- TiCN coated inserts was about 2.44 μm and minimum value was 0.74 μm. In addition, the regression model was able to predict values for surface roughness in comparison with experimental values within reasonable limit.

Exploitation of Public Technology for Industrial Use

The purpose of study is to demonstrate how the characteristics of technology and the process required for development of technology affect technology transfer from public organisations to industry on the technology level. In addition, using the advantage of the analytic level and the novel means of measuring technology convergence, we examine the characteristics of converging technologies as compared to non-converging technologies in technology transfer process. In sum, our study finds that a technology from the public sector is likely to be transferred when its readiness level is closer to generation of profit, when its stage of life cycle is early and when its economic values is high. Our findings also show that converging technologies are less likely to be transferred.

STEP Implementation on Turn-mill Manufacturing Environment

Researches related to standard product model and development of neutral manufacturing interfaces for numerical control machines becomes a significant topic since the last 25 years. In this paper, a detail description of STEP implementation on turnmill manufacturing has been discussed. It shows requirements of information contents from ISO14649 data model. It covers to describe the design of STEP-NC framework applicable to turn-mill manufacturing. In the framework, EXPRESS-G and UML modeling tools are used to depict the information contents of the system and established the bases of information model requirement. A product and manufacturing data model applicable for STEP compliant manufacturing. The next generation turn-mill operations requirements have been represented by a UML diagram. An object oriented classes of ISO1449 has been developed on Visual Basic dot NET platform for binding the static information model represented by the UML diagram. An architect of the proposed system implementation has been given on the bases of the design and manufacturing module of STEP-NC interface established. Finally, a part 21 file process plan generated for an illustration of turn-mill components.

An Algorithm of Finite Capacity Material Requirement Planning System for Multi-stage Assembly Flow Shop

This paper aims to develop an algorithm of finite capacity material requirement planning (FCMRP) system for a multistage assembly flow shop. The developed FCMRP system has two main stages. The first stage is to allocate operations to the first and second priority work centers and also determine the sequence of the operations on each work center. The second stage is to determine the optimal start time of each operation by using a linear programming model. Real data from a factory is used to analyze and evaluate the effectiveness of the proposed FCMRP system and also to guarantee a practical solution to the user. There are five performance measures, namely, the total tardiness, the number of tardy orders, the total earliness, the number of early orders, and the average flow-time. The proposed FCMRP system offers an adjustable solution which is a compromised solution among the conflicting performance measures. The user can adjust the weight of each performance measure to obtain the desired performance. The result shows that the combination of FCMRP NP3 and EDD outperforms other combinations in term of overall performance index. The calculation time for the proposed FCMRP system is about 10 minutes which is practical for the planners of the factory.

Development of a Simple laser-based 2D Compensating System for the Contouring Accuracy of Machine Tools

The dynamical contouring error is a critical element for the accuracy of machine tools. The contouring error is defined as the difference between the processing actual path and commanded path, which is implemented by following the command curves from feeding driving system in machine tools. The contouring error is resulted from various factors, such as the external loads, friction, inertia moment, feed rate, speed control, servo control, and etc. Thus, the study proposes a 2D compensating system for the contouring accuracy of machine tools. Optical method is adopted by using stable frequency laser diode and the high precision position sensor detector (PSD) to performno-contact measurement. Results show the related accuracy of position sensor detector (PSD) of 2D contouring accuracy compensating system was ±1.5 μm for a calculated range of ±3 mm, and improvement accuracy is over 80% at high-speed feed rate.