Electricity is recognized as fundamental to
industrialization and improving the quality of life of the people.
Harnessing the immense untapped hydropower potential in Tripura
region opens avenues for growth and provides an opportunity to
improve the well-being of the people of the region, while making
substantial contribution to the national economy. Gumti hydro power
plant generates power to mitigate the crisis of power in Tripura,
India. The first unit of hydro power plant (5MW) was commissioned
in June 1976 & another two units of 5 MW was commissioned
simultaneously. But out of 15MW capacity at present only 8MW-
9MW power is produced from Gumti hydro power plant during rainy
season. But during lean season the production reduces to 0.5MW due
to shortage of water. Now, it is essential to implement some
mitigation measures so that the further atrocities can be prevented
and originality will be possible to restore. The decision making
ability of the Analytic Hierarchy Process (AHP) and Concordance
Analysis Techniques (CAT) are utilized to identify the better decision
or solution to the present problem. Some related attributes are
identified by the method of surveying within the experts and the
available reports and literatures. Similar criteria are removed and
ultimately seven relevant ones are identified. All the attributes are
compared with each other and rated accordingly to their importance
over the other with the help of Pair wise Comparison Matrix. In the
present investigation different mitigation measures are identified and
compared to find the best suitable alternative which can solve the
present uncertainties involving the existence of the Gumti Hydro
Power Plant.





References:
[1] Mohd., M., Mohd., A., and Mohd., I.A.H, “Basic design aspects of
micro hydro power plant and its development in Malaysia”, National
power & energy conference Proceedings, Kualampur, Malaysia, pp220-
223, 2004.
[2] Belton, V. and Gear, T., “On a Short-coming of Saaty's Method of
Analytic Hierarchies”, Omega, pp. 228-230. 1983.
[3] Saaty, T.L., “Fundamentals of Decision Making and Priority Theory
with the AHP”, RWS Publications, Pittsburgh, PA, U.S.A, 1994.
[4] Dyer, J.S., and Wendell, R.E., “A Critique of the Analytic Hierarchy
Process”, Working Paper, 84/85, Department of Management, The
University of Texas at Austin, Austin, TX, pp. 4-24, 1985.
[5] Saaty, T.L., “Axiomatic Foundations of the Analytic Hierarchy
Process”, Management Science, Vol. 32, pp. 841-855, 1983.
[6] Saaty, T.L., “A Scaling Method for Priorities in Hierarchical
Structures”, Journal of Mathematical Psychology, Vol. 15, pp. 57-68,
1977.
[7] Saaty, T.L., “The Analytic Hierarchy Process”, McGraw-Hill
International, New York, NY, U.S.A., 1980.
[8] Dyer, J.S., “Remarks on the Analytic Hierarchy Process”, Management
Science, Vol. 36, pp. 249-258. 1990.
[9] Sharma, A., “Validation of the monsoonal river inflow forecasting
model-A case study” Journal of applied Hydrology, Vol. xv, pp.1-12,
2002.