Production Scheduling Improvements in an Automotive Sector Company

The paper attempts to overcome the fluctuations occurring in demand of the components in an automotive sector company. Resource and time being the strict constraints, the production is not able to match the pace of the fluctuating demand. So, we introduce some production schedules that help in meeting out the required demand. The merits and demerits of the approaches are also highlighted.





References:
<p>[1] Schneider Jeff G., Boyan Justin A., Moore Andrew W., &ldquo;Value function based production scheduling&rdquo; The Robotics Institute and Computer Science Department, Carnegie Mellon University, Pittsburgh, PA 15213.
[2] Elkinsa Debra A., Huanga Ningjian, Alden Jeffrey M., (2004), &ldquo;Agile manufacturing systems in the automotive industry&rdquo;, Int. J. Production Economics 91, 201&ndash;214.
[3] Narsimhan Seetharama L., McLeavy Dennis W., Billington Peter J., (1995), &ldquo;Production planning and inventory control&rdquo;, Prentice hall of India, 2nd edition.
[4] Goldratt E.M., Cox J., &ldquo;The Goal&rdquo;, (1984), Croton-on-Husdon, N.Y: North River Press.
[5] Goldratt E.M., Cox J., &ldquo;The Racel&rdquo;, (1986), Croton-on-Husdon, N.Y: North River Press.
[6] Umble M.M. and Srikanth M.L. (1990), &ldquo;Synchronous Manufacturing&rdquo;, Cincinnati: South-Western.
[7] Goldratt E.M., (1990), &ldquo;What is this thing called Theory of Constraints&rdquo;, Croton-on-Husdon, N.Y: North River Press.</p>

<p> </p>