Determination of the Economic Planning Depth for Assembly Process Planning

In order to be competitive, companies have to reduce their production costs while meeting increasing quality requirements. Therefore, companies try to plan their assembly processes as detailed as possible. However, increasing product individualization leading to a higher number of variants, smaller batch sizes and shorter product life cycles raise the question to what extent the effort of detailed planning is still justified. An important approach in this field of research is the concept of determining the economic planning depth for assembly process planning based on production specific influencing factors. In this paper first solution hypotheses as well as a first draft of the resulting method will be presented.




References:
[1] B. Lotter, H.-P. Wiendahl, Montage in der industriellen Produktion –
Ein Handbuch für die Praxis. Berlin, Germany. Springer, 2012.
[2] H.-P. Wiendahl, Betriebsorganisation für Ingenieure. Munich,
Germany. Hanser, 2012.
[3] C.-G. Grundig, Fabrikplanung. Munich, Germany: Hanser, 2013.
[4] G. Schuh, Produktionsplanung und –steuerung. Berlin, Germany:
Springer, 2006.
[5] C. Brecher, and L. Schapp, Strategien und Trends in der
Montagetechnik und –organisation. Aachen, Germany: Apprimus, 2009.
[6] A. Kampker, P. Burggäf, and Y. Bäumers, “Economic Level of Detail
for Assembly Planning,” Industrial Engineering and Engineering
Management (IEEM), pp. 516–520, 2014
[7] G. Schuh, A. Kampker, P. Burggäf, and C. Nee, “Production system
with respect for variable quantities for an economical electric vehicle
production,” Industrial Engineering and Engineering Management
(IEEM), pp. 1123–1128, 2011.
[8] P. Burggräf, Wertorientierte Fabrikplanung. Aachen, Germany:
Apprimus, 2012.
[9] F. Giehler, “Erhöhung der Planungsproduktivität am Beispiel der
Auftragsabwicklung im Werkzeugbau,“ Dissertation, WZL Laboratory
for Machine Tools and Production Engineering, RWTH Aachen Univ.,
Aachen, Germany, 210.
[10] T. Baberg, “Rationalisierung in der Arbeitsplanung unter
Berücksichtigung dynamischer Unternehmensver-änderungen und der
Auswirkungen auf die Fertigungskosten,” Dissertation, WZL Laboratory
for Machine Tools and Production Engineering, RWTH Aachen Univ.,
Aachen, Germany, 1980.
[11] P. Goswami, “Beiträge zur Systematisierung der Arbeitsvorbereitung
bezogen auf ihre Organisation sowie auf die Angewandten Techniken im
Hinblick auf die Optimale Fertigungsplanung,” Dissertation, ETH
Zurich, Zurich, Switzerland, 1973.
[12] S. Jacobs, “Systematik zum Aufbau einer Planungsbasis für die
Vorgabezeitermittlung im Werkzeugbau,” Dissertation, WZL
Laboratory for Machine Tools and Production Engineering, RWTH
Aachen Univ., Aachen, Germany, 1990.
[13] I. Kosmas, “Strategien und Hilfsmittel für die Montagevorbereitung in
Unternehmen der Einzel- und Kleinserienproduktion,” Dissertation,
WZL Laboratory for Machine Tools and Production Engineering,
RWTH Aachen Univ., Aachen, Germany, 1988.
[14] H. Hoeth, and L. Wienand, Rationalisierungsmethoden für die
Arbeitsplanung – Eine Anleitung für metallverarbeitende Betriebe.
Eschborn, Germany: RKW, vol. 1, 1986.
[15] K.-G. Konrad, “Planzeiten für Konstruktion und Arbeitsplanung,”
Dissertation, WZL Laboratory for Machine Tools and Production
Engineering, RWTH Aachen Univ., Aachen, Germany, 1987.
[16] M. Miese, “Systematische Montageplanung in Unternehmen mit Einzelund
Kleinserienproduktion,” Dissertation, WZL Laboratory for Machine
Tools and Production Engineering, RWTH Aachen Univ., Aachen,
Germany, 1973.
[17] T. Gartzen, Diskrete Migration als Anlaufstrategie für Montagesysteme.
Aachen, Germany: Apprimus, 2012,
[18] E. Abele, J. Elzenheimer, and A. Rüstig, “Anlaufmanagement in der
Serienproduktion” ZWF Zeitschrift für wirtschaftlichen Fabrikbetrieb,
vol. 98, no. 4, pp. 172–176, 2003.
[19] R.-D. Hoeschen, “Planung von Montagesystemen im Rahmen der
Technischen Investitionsplanung,” Dissertation, WZL Laboratory for
Machine Tools and Production Engineering, RWTH Aachen Univ.,
Aachen, Germany, 1978.
[20] S. F. Gottschalk, Dedicated Flexibility –Komplexitätsoptimale
Gestaltung manueller Serienmontage. Aachen, Germany: Shaker, 2006.
[21] B. Franzkoch, Wertorientiertes Verfügbarkeitsmanagement. Aachen,
Germany: Apprimus, 2010.
[22] J. Beese, MI - Planung des Ablaufs der Produktmontage. Karlsruhe,
Germany: Kernforschungszentrum, 1990.
[23] H.-J. Bullinger, Systematische Montageplanung. Munic, Germany:
Hanser, 1986.
[24] G. Spur, T. Stöferle, Handbuch der Fertigungstechnik – Fügen,
Handhaben und Montieren. Munic, Germany: Hanser, 1986.
[25] W. Everesheim, Organisation in der Produktionstechnik
3 - Arbeitsvorbereitung. Berlin, Germany: Springer, 2002.