From Ritual City to Modern City: The City Space Transformation of Xi’an in the Early 20th Century

The urban layout of Xi’an city (the capital Chang’an in the Tang dynasty) was shaped by feudal etiquette, but this dominant factor was replaced by modern city planning during the period of the Republic of China. This makes Xi’an a representative case to explore the transformation process of Chinese cities in the early 20th century. By analyzing the contrast and connection between the historical texts of city planning and the realistic construction activities recorded by the maps and images, this paper reviews the transformation process of the urban space of Xi’an in the early 20th century and divides it into four phases according to important events that significantly impacted planning and construction activities. Based on this, the entire transformation of Xi’an’s city planning and practices can be characterized by three aspects: 1) the dominant force of the city plan and construction changed with the establishment of modern city administrations; 2) the layout of the city was continuously broadened to meet the demand of modern economy and city life; and, 3) the ritual space was transformed into practical space for commercial and recreational activities.

Systemic Approach to Risk Measurement of Drainage Systems in Urban Areas

The work delineates the threats of maladjustment of the capacity of rain canals, designed and built in the early 20th century, in connection to heavy rainfall, especially in summer. This is the cause of the so called 'urban floods.' It directly relates to fierce raise of paving in the cities. Resolving this problem requires a change in philosophy of draining the rainfall by wider use of retention, infiltration and usage of rainwater. In systemic approach to managing the safety of urban drainage systems the risk, which is directly connected to safety failures, has been accepted as a measure. The risk level defines the probability of occurrence of losses greater than the ones forecast for a given time frame. The procedure of risk modelling, enabling its numeric analysis by using appropriate weights, is a significant issue in this paper.

Measuring Relative Efficiency of Korean Construction Company using DEA/Window

Sub-prime mortgage crisis which began in the US is regarded as the most economic crisis since the Great Depression in the early 20th century. Especially, hidden problems on efficient operation of a business were disclosed at a time and many financial institutions went bankrupt and filed for court receivership. The collapses of physical market lead to bankruptcy of manufacturing and construction businesses. This study is to analyze dynamic efficiency of construction businesses during the five years at the turn of the global financial crisis. By discovering the trend and stability of efficiency of a construction business, this study-s objective is to improve management efficiency of a construction business in the ever-changing construction market. Variables were selected by analyzing corporate information on top 20 construction businesses in Korea and analyzed for static efficiency in 2008 and dynamic efficiency between 2006 and 2010. Unlike other studies, this study succeeded in deducing efficiency trend and stability of a construction business for five years by using the DEA/Window model. Using the analysis result, efficient and inefficient companies could be figured out. In addition, relative efficiency among DMU was measured by comparing the relationship between input and output variables of construction businesses. This study can be used as a literature to improve management efficiency for companies with low efficiency based on efficiency analysis of construction businesses.