Abstract: The sustainable measures on air quality management are recognized as one of the most serious environmental concerns in the mining region. The mining operations emit various types of pollutants which have significant impacts on the environment. This study presents a stochastic control strategy by developing the air pollution control model to achieve a cost-effective solution. The optimization method is formulated to predict the cost of treatment using linear programming with an objective function and multi-constraints. The constraints mainly focus on two factors which are: production of metal should not exceed the available resources, and air quality should meet the standard criteria of the pollutant. The applicability of this model is explored through a case study of an open pit metal mine, Utah, USA. This method simultaneously uses meteorological data as a dispersion transfer function to support the practical local conditions. The probabilistic analysis and the uncertainties in the meteorological conditions are accomplished by Monte Carlo simulation. Reasonable results have been obtained to select the optimized treatment technology for PM2.5, PM10, NOx, and SO2. Additional comparison analysis shows that baghouse is the least cost option as compared to electrostatic precipitator and wet scrubbers for particulate matter, whereas non-selective catalytical reduction and dry-flue gas desulfurization are suitable for NOx and SO2 reduction respectively. Thus, this model can aid planners to reduce these pollutants at a marginal cost by suggesting control pollution devices, while accounting for dynamic meteorological conditions and mining activities.
Abstract: Wet scrubbers have found widespread use in cleaning
contaminated gas streams because of their ability to remove
particulates and based on the applications of scrubbing of marine
engine exhaust gases by spraying sea-water. In order to examine the
flow characteristics inside the scrubber, the model is designated with
flow properties of hot air and water sprayer. The flow dynamics of
evaporation of hot air by the injection of water droplets is the key
factor considered in this paper. The flow behavior inside the scrubber
was investigated from the previous works and to sum up the
evaporation rate with respect to the concentration of water droplets are
predicted to bring out the competent modelling. The numerical
analysis using CFD facilitates in understanding the problem better and
empathies the behavior of the model over its entire operating envelope.
Abstract: The present study shows a method to recover lead metal from wastewater of wet scrubber in secondary lead smelter. The wastewater is loaded with 42,000 ppm of insoluble lead compounds (TSP) submicron in diameter. The technical background benefits the use of cationic polyfloc solution to flocculate these colloidal solids before press filtration. The polymer solution is injected in the wastewater stream in a countercurrent flow design. The study demonstrates the effect of polymer dose, temperature, pH, flow velocity of the wastewater and different filtration media on the filtration extent. Results indicated that filtration rate (¦r), quality of purified water, purifying efficiency (¦e) and floc diameter decrease regularly with increase in mass flow rate and velocity up to turbulence of 0.5 m.sec-1. Laminar flow is in favor of flocculation. Polyfloc concentration of 0.75 – 1.25 g/m3 wastewater is convenient. Increasing temperature of the wastewater and pneumatic pressure of filtration enhances ¦r. High pH value deforms floc formation and assists degradation of the filtration fabric. The overall efficiency of the method amounts to 93.2 %. Lead metal was recovered from the filtrate cake using carbon as a reducing agent at 900°C.