Abstract: Steel corrosion in concrete is considered as a main
engineering problems for many countries and lots of expenses has been paid for their repair and maintenance annually. This problem
may occur in all engineering structures whether in coastal and offshore or other areas. Hence, concrete structures should be able to
withstand corrosion factors existing in water or soil. Reinforcing
steel corrosion enhancement can be measured by use of concrete
electrical resistance; and maintaining high electric resistivity in concrete is necessary for steel corrosion prevention. Lots of studies
devoted to different aspects of the subjects worldwide. In this paper, an evaluation of the effects of W/C ratio, cementitious materials, and
percent increase in silica fume were investigated on electric resistivity of high strength concrete. To do that, sixteen mix design
with one aggregate grading was planned. Five of them had varying amount of W/C ratio and other eleven mixes was prepared with
constant W/C ratio but different amount of cementitious materials.
Silica fume and super plasticizer were used with different proportions
in all specimens. Specimens were tested after moist curing for 28 days. A total of 80 cube specimens (50 mm) were tested for concrete
electrical resistance. Results show that concrete electric resistivity can be increased with increasing amount of cementitious materials
and silica fume.
Abstract: Dengue disease is an infectious vector-borne viral
disease that is commonly found in tropical and sub-tropical regions,
especially in urban and semi-urban areas, around the world and
including Malaysia. There is no currently available vaccine or
chemotherapy for the prevention or treatment of dengue disease.
Therefore prevention and treatment of the disease depend on vector
surveillance and control measures. Disease risk mapping has been
recognized as an important tool in the prevention and control
strategies for diseases. The choice of statistical model used for
relative risk estimation is important as a good model will
subsequently produce a good disease risk map. Therefore, the aim of
this study is to estimate the relative risk for dengue disease based
initially on the most common statistic used in disease mapping called
Standardized Morbidity Ratio (SMR) and one of the earliest
applications of Bayesian methodology called Poisson-gamma model.
This paper begins by providing a review of the SMR method, which
we then apply to dengue data of Perak, Malaysia. We then fit an
extension of the SMR method, which is the Poisson-gamma model.
Both results are displayed and compared using graph, tables and
maps. Results of the analysis shows that the latter method gives a
better relative risk estimates compared with using the SMR. The
Poisson-gamma model has been demonstrated can overcome the
problem of SMR when there is no observed dengue cases in certain
regions. However, covariate adjustment in this model is difficult and
there is no possibility for allowing spatial correlation between risks in
adjacent areas. The drawbacks of this model have motivated many
researchers to propose other alternative methods for estimating the
risk.
Abstract: All practical real-time scheduling algorithms in multiprocessor systems present a trade-off between their computational complexity and performance. In real-time systems, tasks have to be performed correctly and timely. Finding minimal schedule in multiprocessor systems with real-time constraints is shown to be NP-hard. Although some optimal algorithms have been employed in uni-processor systems, they fail when they are applied in multiprocessor systems. The practical scheduling algorithms in real-time systems have not deterministic response time. Deterministic timing behavior is an important parameter for system robustness analysis. The intrinsic uncertainty in dynamic real-time systems increases the difficulties of scheduling problem. To alleviate these difficulties, we have proposed a fuzzy scheduling approach to arrange real-time periodic and non-periodic tasks in multiprocessor systems. Static and dynamic optimal scheduling algorithms fail with non-critical overload. In contrast, our approach balances task loads of the processors successfully while consider starvation prevention and fairness which cause higher priority tasks have higher running probability. A simulation is conducted to evaluate the performance of the proposed approach. Experimental results have shown that the proposed fuzzy scheduler creates feasible schedules for homogeneous and heterogeneous tasks. It also and considers tasks priorities which cause higher system utilization and lowers deadline miss time. According to the results, it performs very close to optimal schedule of uni-processor systems.
Abstract: In this study, workplace environmental monitoring
systems were established using USN(Ubiquitous Sensor Networks)
and LabVIEW. Although existing direct sampling methods enable
finding accurate values as of the time points of measurement, those
methods are disadvantageous in that continuous management and
supervision are difficult and costs for are high when those methods are
used. Therefore, the efficiency and reliability of workplace
management by supervisors are relatively low when those methods are
used. In this study, systems were established so that information on
workplace environmental factors such as temperatures, humidity and
noises is measured and transmitted to the PC in real time to enable
supervisors to monitor workplaces through LabVIEW on the PC.
When any accidents have occurred in workplaces, supervisors can
immediately respond through the monitoring system and this system
enables integrated workplace management and the prevention of
safety accidents. By introducing these monitoring systems, safety
accidents due to harmful environmental factors in workplaces can be
prevented and these monitoring systems will be also helpful in finding
out the correlation between safety accidents and occupational diseases
by comparing and linking databases established by this monitoring
system with existing statistical data.