Abstract: Overtopping is known as one the most important reasons for the failure of earth dams. In some cases, it has resulted in heavy damages and losses. Therefore, enhancing the safety of earth dams against overtopping has received much attention in the past four decades. In this paper, at first, the overtopping phenomena and its destructive consequences will be introduced. Then, overtopping failure mechanism of embankments will be described. Finally, different types of protection systems for stabilization of earth dams against overtopping will be presented. These include timber cribs, riprap and gabions, reinforced earth, roller compacted concrete, and the precast concrete blocks.
Abstract: Rehabilitation of dam components such as foundations, buttresses, spillways and overtopping protection require a wide range of construction and design methodologies. Geotechnical Engineering considerations play an important role in the design and construction of foundations of new dams. Much investigation is required to assess and evaluate the existing dams. The application of roller compacting concrete (RCC) has been accepted as a new method for constructing new dams or rehabilitating old ones. In the past 40 years there have been so many changes in the usage of RCC and now it is one of most satisfactory solutions of water and hydropower resource throughout the world. The considerations of rehabilitation and construction of dams might differ due to upstream reservoir and its influence on penetrating and dewatering of downstream, operations requirements and plant layout. One of the advantages of RCC is its rapid placement which allows the dam to be operated quickly. Unlike ordinary concrete it is a drier mix, and stiffs enough for compacting by vibratory rollers. This paper evaluates some different aspects of RCC and focuses on its preparation progress.
Abstract: High performance turf reinforcement mat (HPTRM) is
one of the most advanced flexible armoring technologies for severe
erosion challenges. The effect of turbulence on the slope stability of
an earthen levee strengthened by high performance turf reinforcement
mat (HPTRM) is investigated in this study for combined storm surge
and wave overtopping conditions. The results show that turbulence
has strong influence on the slope stability during the combined storm
surge and wave overtopping conditions. Among the surge height,
peak wave force and turbulent force. The turbulent force has the
ability to stabilize the earthen levee at the large wave force the
turbulent force has strongest effect on the FS. The surge storm acts as
an independent force on the slope stability of the earthen levee. It just
adds to the effects of the turbulent force and wave force on the slope
stability of HPTRM strengthened levee.
Abstract: Riprap is mostly used to prevent erosion by flows
down the steep slopes in river engineering. A total of 53 stability tests
performed on angular riprap with a median stone size ranging from
15 to 278 mm and slope ranging from 1 to 40% are used in this study.
The existing equations for the prediction of medium size of angular
stones are checked for their accuracy using the available data.
Predictions of median size using these equations are not satisfactory
and results show deviation by more than ±20% from the observed
values. A multivariable power regression analysis is performed to
propose a new equation relating the median size with unit discharge,
bed slope, riprap thickness and coefficient of uniformity. The
proposed relationship satisfactorily predicts the median angular stone
size with ±20% error. Further, the required size of the rounded stone
is more than the angular stone for the same unit discharge and the
ratio increases with unit discharge and also with embankment slope
of the riprap.
Abstract: To estimate the risks of dam failure phenomenon, it is necessary to understand this phenomenon and the involved governing factors. Overtopping and piping are the two main reasons of earthdam failures. In the piping context, the piping is determined as a phenomenon which is occurred between two phases, the water liquid and the solid soil. In this investigation, the onset of piping and its development, as well as the movement of water in soil, are numerically approached. In this regard, a one-dimensional numerical model based on the mass-conserving finite-volume method is developed and applied in order to simulate the piping phenomenon in a continuous circular tunnel of given initial length and radius, located between upstream and downstream. The simulation result includes the time-variations of radius along the tunnel until the radius value reaches its critical and the piping phenomenon converts to overtopping.