Effect of Type of Pile and Its Installation Method on Pile Bearing Capacity by Physical Modeling in Frustum Confining Vessel

Various factors such as the method of installation, the pile type, the pile material and the pile shape, can affect the final bearing capacity of a pile executed in the soil; among them, the method of installation is of special importance. The physical modeling is among the best options in the laboratory study of the piles behavior. Therefore, the current paper first presents and reviews the frustum confining vessel (FCV) as a suitable tool for physical modeling of deep foundations. Then, by describing the loading tests of two open-ended and closed-end steel piles, each of which has been performed in two methods, “with displacement" and "without displacement", the effect of end conditions and installation method on the final bearing capacity of the pile is investigated. The soil used in the current paper is silty sand of Firuzkuh, Iran. The results of the experiments show that in general the without displacement installation method has a larger bearing capacity in both piles, and in a specific method of installation the closed ended pile shows a slightly higher bearing capacity.

Sewer Culvert Installation Method to Accommodate Underground Construction in an Urban Area with Narrow Streets (The Development of Shield Switching Type Micro-Tunneling Method and the Introduction of Construction Examples)

In recent years, a reconstruction project for sewer  pipelines has been progressing in Japan with the aim of renewing old  sewer culverts. However, it is difficult to secure a sufficient base area  for shafts in an urban area because many streets are narrow with a  complex layout. As a result, construction in such urban areas is  generally very demanding.  In urban areas, there is a strong requirement for a safe, reliable and  economical construction method that does not disturb the public’s  daily life and urban activities. With this in mind, we developed a new  construction method called the “shield switching type micro-tunneling  method,” which integrates the micro-tunneling method and shield  method.  In this method, pipeline is constructed first for sections that are  gently curved or straight using the economical micro-tunneling  method, and then the method is switched to the shield method for  sections with a sharp curve or a series of curves without establishing  an intermediate shaft.  This paper provides the information, features and construction  examples of this newly developed method.