Strategic Investment in Infrastructure Development to Facilitate Economic Growth in the United States

The COVID-19 pandemic is unprecedented in terms of its global reach and economic impacts. Historically, investment in infrastructure development projects has been touted to boost the economic growth of a nation. The State and Local governments responsible for delivering infrastructure assets work under tight budgets. Therefore, it is important to understand which infrastructure projects have the highest potential of boosting economic growth in the post-pandemic era. This paper presents relationships between infrastructure projects and economic growth. Statistical relationships between investment in different types of infrastructure projects (transit, water and wastewater, highways, power, manufacturing etc.) and indicators of economic growth are presented using historic data between 2002 and 2020 from the U.S. Census Bureau and U.S. Bureau of Economic Analysis (BEA). The outcome of the paper is the comparison of statistical correlations between investment in different types of infrastructure projects and indicators of economic growth. The comparison of the statistical correlations is useful in ranking the types of infrastructure projects based on their ability to influence economic prosperity. Therefore, investment in the infrastructures with the higher rank will have a better chance of boosting the economic growth. Once, the ranks are derived, they can be used by the decision-makers in infrastructure investment related decision-making process.

Automated Vehicle Traffic Control Tower: A Solution to Support the Next Level Automation

Automated vehicles (AVs) have the potential to enhance road capacity, improving road safety and traffic efficiency. Research and development on AVs have been going on for many years. However, when the complicated traffic rules and real situations interacted, AVs fail to make decisions on contradicting situations, and are not able to have control in all conditions due to highly dynamic driving scenarios. This limits AVs’ usage and restricts the full potential benefits that they can bring. Furthermore, regulations, infrastructure development, and public acceptance cannot keep up at the same pace as technology breakthroughs. Facing these challenges, this paper proposes automated vehicle traffic control tower (AVTCT) acting as a safe, efficient and integrated solution for AV control. It introduces a concept of AVTCT for control, management, decision-making, communication and interaction with various aspects in transportation. With the prototype demonstrations and simulations, AVTCT has the potential to overcome the control challenges with AVs and can facilitate AV reaching their full potential. Possible functionalities, benefits as well as challenges of AVTCT are discussed, which set the foundation for the conceptual model, simulation and real application of AVTCT.

Deep Injection Wells for Flood Prevention and Groundwater Management

With its arid climate, Qatar experiences low annual rainfall, intense storms, and high evaporation rates. However, the fast-paced rate of infrastructure development in the capital city of Doha has led to recurring instances of surface water flooding as well as rising groundwater levels. Public Work Authority (PWA/ASHGHAL) has implemented an approach to collect and discharge the flood water into a) positive gravity systems; b) Emergency Flooding Area (EFA) – Evaporation, Infiltration or Storage off-site using tankers; and c) Discharge to deep injection wells. As part of the flood prevention scheme, 21 deep injection wells have been constructed to discharge the collected surface and groundwater table in Doha city. These injection wells function as an alternative in localities that do not possess either positive gravity systems or downstream networks that can accommodate additional loads. These injection wells are 400-m deep and are constructed in a complex karstic subsurface condition with large cavities. The injection well system will discharge collected groundwater and storm surface runoff into the permeable Umm Er Radhuma Formation, which is an aquifer present throughout the Persian Gulf Region. The Umm Er Radhuma formation contains saline water that is not being used for water supply. The injection zone is separated by an impervious gypsum formation which acts as a barrier between upper and lower aquifer. State of the art drilling, grouting, and geophysical techniques have been implemented in construction of the wells to assure that the shallow aquifer would not be contaminated and impacted by injected water. Injection and pumping tests were performed to evaluate injection well functionality (injectability). The results of these tests indicated that majority of the wells can accept injection rate of 200 to 300 m3 /h (56 to 83 l/s) under gravity with average value of 250 m3 /h (70 l/s) compared to design value of 50 l/s. This paper presents design and construction process and issues associated with these injection wells, performing injection/pumping tests to determine capacity and effectiveness of the injection wells, the detailed design of collection system and conveying system into the injection wells, and the operation and maintenance process. This system is completed now and is under operation, and therefore, construction of injection wells is an effective option for flood control.

Key Issues in Transfer Stage of BOT Project: Experience from China

The build-operate-transfer (BOT) project delivery system has provided effective routes to mobilize private sector funds, innovative technologies, management skills and operational efficiencies for public infrastructure development and have been widely used in China during the last 20 years. Many BOT projects in China will be smoothly transferred to the government soon and the transfer stage, which is considered as the last stage, must be studied carefully and handled well to achieve the overall success of BOT projects. There will be many issues faced by both the public sector and private sector in the transfer stage of BOT projects, including project post-assessment, technology and documents transfer, personal training and staff transition, etc. and sometimes additional legislation is needed for future operation and management of facilities. However, most previous studies focused on the bidding, financing, and building and operation stages instead of transfer stage. This research identifies nine key issues in the transfer stage of BOT projects through a comprehensive study on three cases in China, and the expert interview and expert discussion meetings are held to validate the key issues and give detail analysis. A proposed framework of transfer management is prepared based on the experiences derived and lessons drawn from the case studies and expert interview and discussions, which is expected to improve the transfer management of BOT projects in practice.

Economic Assessment Methodology to Support Decisions for Transport Infrastructure Development

The decades after the end of the second War provide evidence that infrastructures investments contibute to economic development, on terms of productivity and income growth. In order to force productivity and increase competitiveness the financing of large transport infrastructure projects are on the top of the agenda in strategic planning process. Such a decision may take form some days to some decades and stakeholders as well as decision makers need tools in order to estimate the economic impact on natioanl economy of such an investment. The key question in such decisions is if the effects caused by the new infrastructure could be able to boost economic development on one hand, and create new jobs and activities on the other. This paper deals with the review of estimation of the mega transport infrastructure projects economic effects in economy.

Building Information Modelling for Construction Delay Management

The Kingdom of Saudi Arabia (KSA) is not an exception in relying on the growth of its construction industry to support rapid population growth. However, its need for infrastructure development is constrained by low productivity levels and cost overruns caused by factors such as delays to project completion. Delays in delivering a construction project are a global issue and while theories such as Optimism Bias have been used to explain such delays, in KSA, client-related causes of delays are also significant. The objective of this paper is to develop a framework-based approach to explore how the country’s construction industry can manage and reduce delays in construction projects through building information modelling (BIM) in order to mitigate the cost consequences of such delays.  It comprehensively and systematically reviewed the global literature on the subject and identified gaps, critical delay factors and the specific benefits that BIM can deliver for the delay management.  A case study comprising of nine hospital projects that have experienced delay and cost overruns was also carried out. Five critical delay factors related to the clients were identified as candidates that can be mitigated through BIM’s benefits. These factors are: Ineffective planning and scheduling of the project; changes during construction by the client; delay in progress payment; slowness in decision making by the client; and poor communication between clients and other stakeholders. In addition, data from the case study projects strongly suggest that optimism bias is present in many of the hospital projects. Further validation via key stakeholder interviews and documentations are planned.

The Fiscal and Macroeconomic Impacts of Reforming Energy Subsidy Policy in Malaysia

The rationalization of a gradual subsidies reforms plan has been set out by the Malaysian government to achieve the high-income nation target. This paper attempts to analyze the impacts of energy subsidy reform policy on fiscal deficit and macroeconomics variables in Malaysia. The Computable General Equilibrium (CGE) Model is employed. Three simulations based on different groups of scenarios have been developed. Importantly, the overall results indicate that removal of fuel subsidy has significantly improved the real GDP and reduced the government fiscal deficit. On the other hand, the removal of the fuel subsidy has increased most of the local commodity prices, especially energy commodities. The findings of the study could provide some imperative inputs for policy makers, especially to identify the right policy mechanism. This is especially ensures the subsidy savings from subsidy removal could be transferred back into the domestic economy in the form of infrastructure development, compensation and increases in others sector output contributions towards a sustainable economic growth.

Decision Framework for Cross-Border Railway Infrastructure Projects

Transport infrastructure assets are key components of the national asset portfolio. The decision to invest in a new infrastructure in transports could take from a few years to some decades. This is mainly because of the need to reserve and spent many capitals, the long payback period, the number of the stakeholders involved in decision process and –many times- the investment and business risks are high. Therefore, the decision assessment framework is an essential challenge linked with the key decision factors meet the stakeholder expectations highlighting project trade-offs, financial risks, business uncertainties and market limitations. This paper examines the decision process for new transport infrastructure projects in cross border regions, where a wide range of stakeholders with different expectation is involved. According to a consequences analysis systemic approach, the relationship of transport infrastructure development, economic system development and stakeholder expectation is analyzed. Adopting the on system of system methodological approach, the decision making framework, variables, inputs and outputs are defined, highlighting the key shareholder’s role and expectations. The application provides the methodology outputs presenting the proposed decision framework for a strategic railway project in north Greece deals with the upgrade of the existing railway corridor connecting Greece, Turkey and Bulgaria.

Sustainable Development Variables to Assess Transport Infrastructure in Remote Destinations

The assessment variables of the accessibility and the sustainability of access infrastructure for remote regions may vary significant by location and a wide range of factors may affect the decision process. In this paper, the environmental disturbance implications of transportation system to key demand and supply variables impact the economic system in remote destination are descripted. According to a systemic approach, the key sustainability variables deals with decision making process that have to be included in strategic plan for the critical transport infrastructure development and their relationship to regional socioeconomic system are presented. The application deals with the development of railway in remote destinations, where the traditional CBA not include the external cost generated by the environmental impacts that may have a range of diverse impacts on transport infrastructure and services. The analysis output provides key messages to decision and policy makers towards sustainable development of transport infrastructure, especially for remote destinations where accessibility is a key factor of regional economic development and social stability. The key conclusion could be essential useful for relevant applications in remote regions in the same latitude.

E-Government, China Internet Plus, and the One Belt One Road Initiative: The Africa Connection

The lack of Information and Communication Technologies (ICT) infrastructure in African countries is hampering the successful adoption, development and implementation of e-government in Africa. Electronic government is the use of ICTs to modernize government public administration processes and to provide government services to citizens with a purpose to enhance efficiency, accountability, and transparency in government’s interaction with the citizenry. ICT application in public administration has the potential to modernize and create smarter government and improvement in public service delivery. China’s Internet Plus policy and One Belt One Road strategy present a golden opportunity for countries in Africa to attract the huge financial investment through Chinese IT companies to develop and close Africa’s ICT infrastructure gap. This study recommends the establishment of One Belt One Road ICT Infrastructure Fund for Africa (OBOR ICT Fund for Africa) to enable countries in Africa to source solely for the purpose of ICT infrastructure development in the public sector/government machinery which would in turn promote the adoption and development of e-government in the public sectors of respective countries in Africa.

Modelling the States of Public Client Participation in Public Private Partnership Arrangements

The degree to which a public client actively participates in Public Private Partnership (PPP) schemes, is seen as a determinant of the success of the arrangement, and in particular, efficiency in the delivery of the assets of any infrastructure development. The asset delivery is often an early barometer for judging the overall performance of the PPP. Currently, there are no defined descriptors for the degree of such participation. The lack of defined descriptors makes the association between the degree of participation and efficiency of asset delivery, difficult to establish. This is particularly so if an optimum effect is desired. In addition, such an association is important for the strategic decision to embark on any PPP initiative. This paper presents a conceptual model of different levels of participation that characterise PPP schemes. The modelling was achieved by a systematic review of reported sources that address essential aspects and structures of PPP schemes, published from 2001 to 2015. As a precursor to the modelling, the common areas of Public Client Participation (PCP) were investigated. Equity and risk emerged as two dominant factors in the common areas of PCP, and were therefore adopted to form the foundation of the modelling. The resultant conceptual model defines the different states of combined PCP. The defined states provide a more rational basis for establishing how the degree of PCP affects the efficiency of asset delivery in PPP schemes.

Constructing a New World Order through a Narrative of Infrastructural Development: The Case of the BRICS

The aim of this research is to understand how the emerging power bloc BRICS employs infrastructure development narratives to construct a new world order. BRICS is an international body consisting of five emerging countries that collaborate on economic and political issues: Brazil, Russia, India, China, and South Africa. This study explores the projection of infrastructure development narratives through an analysis of BRICS’ attention to infrastructure investment and financing, its support of the New Partnership on African Development and the establishment of the New Development Bank in Shanghai. The theory of Strategic Narratives is used to explore BRICS’ commitment to infrastructure development and to distinguish three layers: system narratives (BRICS as a global actor to propose development reform), identity narratives (BRICS as a collective identity joining efforts to act upon development aspirations) and issue narratives (BRICS committed to a range of issues of which infrastructure development is prominent). The methodology that is employed is a narrative analysis of BRICS’ official documents, media statements, and website imagery. A comparison of these narratives illuminates tensions at the three layers and among the five member states. Identifying tensions among development infrastructure narratives provides an indication of how policymaking for infrastructure development could be improved. Subsequently, it advances BRICS’ ability to act as a global actor to construct a new world order.

Sediment Transport Monitoring in the Port of Veracruz Expansion Project

The construction of most coastal infrastructure developments around the world are usually made considering wave height, current velocities and river discharges; however, little effort has been paid to surveying sediment transport during dredging or the modification to currents outside the ports or marinas during and after the construction. This study shows a complete survey during the construction of one of the largest ports of the Gulf of Mexico. An anchored Acoustic Doppler Current Velocity profiler (ADCP), a towed ADCP and a combination of model outputs were used at the Veracruz port construction in order to describe the hourly sediment transport and current modifications in and out of the new port. Owing to the stability of the system the new port was construction inside Vergara Bay, a low wave energy system with a tidal range of up to 0.40 m. The results show a two-current system pattern within the bay. The north side of the bay has an anticyclonic gyre, while the southern part of the bay shows a cyclonic gyre. Sediment transport trajectories were made every hour using the anchored ADCP, a numerical model and the weekly data obtained from the towed ADCP within the entire bay. The sediment transport trajectories were carefully tracked since the bay is surrounded by coral reef structures which are sensitive to sedimentation rate and water turbidity. The survey shows that during dredging and rock input used to build the wave breaker sediments were locally added (< 2500 m2) and local currents disperse it in less than 4 h. While the river input located in the middle of the bay and the sewer system plant may add more than 10 times this amount during a rainy day or during the tourist season. Finally, the coastal line obtained seasonally with a drone suggests that the southern part of the bay has not been modified by the construction of the new port located in the northern part of the bay, owing to the two subsystem division of the bay.

The Evaluation of Costs and Greenhouse Gas Reduction Using Technologies for Energy from Sewage Sludge

Sewage sludge is a biomass resource that can create a solid fuel and electricity. Utilizing sewage sludge as a renewable energy can contribute to the reduction of greenhouse gases. In Japan, the "National Plan for the Promotion of Biomass Utilization" and the “Priority Plan for Social Infrastructure Development" were approved at cabinet meetings in December 2010 and August 2012, respectively, to promote the energy utilization of sewage sludge. This study investigated costs and greenhouse gas emission in different sewage sludge treatments with technologies for energy from sewage sludge. Expenses were estimated based on capital costs and O&M costs including energy consumption of solid fuel plants and biogas power generation plants for sewage sludge. Results showed that the cost of sludge digestion treatment with solid fuel technologies was 8% lower than landfill disposal. The greenhouse gas emission of sludge digestion treatment with solid fuel technologies was also 6,390t as CO2 smaller than landfill disposal. Biogas power generation reduced the electricity of a wastewater treatment plant by 30% and the cost by 5%.

Megalopolisation: An Effect of Large Scale Urbanisation in Post-Reform China

Megalopolis is a group of densely populated metropolitan areas that combine to form an urban complex. Since China introduced the economic reforms in late 1970s, the Chinese urban system has experienced unprecedented growth. The process of urbanisation prevailed in the 1980s, and the process of predominantly large city growth appeared to continue through 1990s and 2000s. In this study, the magnitude and pattern of urbanisation in China during 1990s were examined using remotely sensed imagery acquired by TM/ETM+ sensor onboard the Landsat satellites. The development of megalopolis areas in China was also studied based on the GIS analysis of the increases of urban and built-up area from 1990 to 2000. The analysis suggests that in the traditional agricultural zones in China, e.g., Huang-Huai-Hai Plains, Changjiang River Delta, Pearl River Delta and Sichuan Basin, the urban and built-up areas increased by 1.76 million hectares, of which 0.82 million hectares are expansion of urban areas, an increase of 24.78% compared with 1990 at the national scale. The Yellow River Delta, Changjiang River Delta and Pearl River Delta also saw an increase of urban and built-up area by 63.9%, 66.2% and 83.0% respectively. As a result, three major megalopolises were developed in China: the Guangzhou-Shenzhen-Hong Kong- Macau (Pearl River Delta: PRD) megalopolis area, the Shanghai- Nanjing-Hangzhou (Changjiang River Delta: CRD) megalopolis area and the Beijing-Tianjing-Tangshan-Qinhuangdao (Yellow River Delta-Bohai Sea Ring: YRD) megalopolis area. The relationship between the processed of megalopolisation and the inter-provincial population flow was also explored in the context of social-economic and transport infrastructure development in Post-reform China.

Reutilization of Organic and Peat Soils by Deep Cement Mixing

Limited infrastructure development on peats and organic soils is a serious geotechnical issues common to many countries of the world especially Malaysia which distributed 1.5 mill ha of those problematic soil. These soils have high water content and organic content which exhibit different mechanical properties and may also change chemically and biologically with time. Constructing structures on peaty ground involves the risk of ground failure and extreme settlement. Nowdays, much efforts need to be done in making peatlands usable for construction due to increased landuse. Deep mixing method employing cement as binders, is generally used as measure again peaty/ organic ground failure problem. Where the technique is widely adopted because it can improved ground considerably in a short period of time. An understanding of geotechnical properties as shear strength, stiffness and compressibility behavior of these soils was requires before continues construction on it. Therefore, 1- 1.5 meter peat soil sample from states of Johor and an organic soil from Melaka, Malaysia were investigated. Cement were added to the soil in the pre-mixing stage with water cement ratio at range 3.5,7,14,140 for peats and 5,10,30 for organic soils, essentially to modify the original soil textures and properties. The mixtures which in slurry form will pour to polyvinyl chloride (pvc) tube and cured at room temperature 250C for 7,14 and 28 days. Laboratory experiments were conducted including unconfined compressive strength and bender element , to monitor the improved strength and stiffness of the 'stabilised mixed soils'. In between, scanning electron miscroscopic (SEM) were observations to investigate changes in microstructures of stabilised soils and to evaluated hardening effect of a peat and organic soils stabilised cement. This preliminary effort indicated that pre-mixing peat and organic soils contributes in gaining soil strength while help the engineers to establish a new method for those problematic ground improvement in further practical and long term applications.

The Integration between Transportation Solutions, Economic Development and Community Development as an Approach for Sustainability – A Case Study of Curitiba, Brazil

Sustainability and sustainable development have been the main theme of many international conferences, such the UN Rio de Janeiro 1992 Earth Summit This was followed by the appearance of the global conferences at the late of the nineties and the early of 2000 to confirm the importance of the sustainable development .it was focused on the importance of the economic development as it is considered an effective tool in the operations of the sustainable development. Industry plays a critical role in technological innovations and research and development activities, which are crucial for the economic and social development of any country. Transportation and mobility are an important part or urban economics and the quality of life. To analyze urban transportation and its environmental impacts, a comprehensive approach is needed. So this research aims to apply new approach for the development of the urban communities that insure the continuity and facing the deterioration. This approach aims to integrate sustainable transport solutions with economic development and community development. For that purpose we will concentrate on one of the most sustainable cities in the world (Curitiba in Brazil) which provides the world with a model in how to integrate sustainable transport considerations into business development, road infrastructure development, and local community development.

Planning of Road Infrastructure Financing: Computational Finance Viewpoint

Lack of resources for road infrastructure financing is a problem that currently affects not only eastern European economies but also many other countries especially in relation to the impact of global financial crisis. In this context, we are talking about the socalled short-investment problem as a result of long-term lack of investment resources. Based on an analysis of road infrastructure financing in the Czech Republic this article points out at weaknesses of current system and proposes a long-term planning methodology supported by system approach. Within this methodology and using created system dynamic model the article predicts the development of short-investment problem in the Country and in reaction on the downward trend of certain sources the article presents various scenarios resulting from the change of the structure of financial sources. In the discussion the article focuses more closely on the possibility of introduction of tax on vehicles instead of taxes with declining revenue streams and estimates its approximate price in relation to reaching various solutions of short-investment in time.

Introducing the Main Factors of Accidents on the Roads of Iran and Studying its Causes and Strategies Applied to Decrease it

Road transportation system is the most important method of transporting the goods. Considering the most suitable geographical situation of Iran to transport the goods between Europe and Asia and placement of this country in direction of international corridors (east- west) , (north-south) and Asian land transport to infrastructure development “A.L.T.I.D" and Transport corridor Europe - Caucasus - Asia “T.R.A.C.E.C.A", noticing the security of road transportation system in this country is so important. In this paper the main factors of accidents on the roads of Iran are categorized regarding the rate of accidents occurred. Then apart from studying the main reasons of accidents of every category, the main factors of these events are studied and its strategies in Iran are introduced.

Development of Performance Indicators in Operational Level for Pre-hospital EMS in Thailand

The objective of this research is to develop the performance indicators (PIs) in operational level for the Pre-hospital Emergency Medical Service (EMS) system employing in Thailand. This research started with ascertaining the current pre-hospital care system. The team analyzed the strategies of Narerthorn, a government unit under the ministry of public health, and the existing PIs of the pre-hospital care. Afterwards, the current National Strategic Plan of EMS development (2008-2012) of the Emergency Medical Institute of Thailand (EMIT) was considered using strategic analysis to developed Strategy Map (SM) and identified the Success Factors (SFs). The analysis results from strategy map and SFs were used to develop the Performance Indicators (PIs). To verify the set of PIs, the team has interviewed with the relevant practitioners for the possibilities to implement the PIs. To this paper, it was to ascertain that all the developed PIs support the objectives of the strategic plan. Nevertheless, the results showed that the operational level PIs suited only with the first dimension of National Strategic Plan (infrastructure and information technology development). Besides, the SF was the infrastructure development (to contribute the EMS system to people throughout with standard and efficiency both in normally and disaster conditions). Finally, twenty-nine indicators were developed from the analysis results of SM and SFs.