Abstract: The purpose of this paper is to develop a multi-product economic production quantity model under vendor management inventory policy and restrictions including limited warehouse space, budget, and number of orders, average shortage time and maximum permissible shortage. Since the “costs” cannot be predicted with certainty, it is assumed that data behave under uncertain environment. The problem is first formulated into the framework of a bi-objective of multi-product economic production quantity model. Then, the problem is solved with three multi-objective decision-making (MODM) methods. Then following this, three methods had been compared on information on the optimal value of the two objective functions and the central processing unit (CPU) time with the statistical analysis method and the multi-attribute decision-making (MADM). The results are compared with statistical analysis method and the MADM. The results of the study demonstrate that augmented-constraint in terms of optimal value of the two objective functions and the CPU time perform better than global criteria, and goal programming. Sensitivity analysis is done to illustrate the effect of parameter variations on the optimal solution. The contribution of this research is the use of random costs data in developing a multi-product economic production quantity model under vendor management inventory policy with several constraints.
Abstract: This paper presents a methodology for serial production planning problem in wire and cable manufacturing process that addresses the problem of input-output imbalance in different consecutive stations, hoping to minimize the halt of machines in each stage. To this end, a linear Goal Programming (GP) model is developed, in which four main categories of constraints as per the number of runs per machine, machines’ sequences, acceptable inventories of machines at the end of each period, and the necessity of fulfillment of the customers’ orders are considered. The model is formulated based upon on the real data obtained from IKO TAK Company, an important supplier of wire and cable for oil and gas and automotive industries in Iran. By solving the model in GAMS software the optimal number of runs, end-of-period inventories, and the possible minimum idle time for each machine are calculated. The application of the numerical results in the target company has shown the efficiency of the proposed model and the solution in decreasing the lead time of the end product delivery to the customers by 20%. Accordingly, the developed model could be easily applied in wire and cable companies for the aim of optimal production planning to reduce the halt of machines in manufacturing stages.
Abstract: To have effective production planning, it is necessary to control the quality of processes. This paper aims at improving the performance of the disposable essentials process using statistical quality control and goal programming in a vague environment. That is expressed uncertainty because there is always a measurement error in the real world. Therefore, in this study, the conditions are examined in a vague environment that is a distance-based environment. The disposable essentials process in Kach Company was studied. Statistical control tools were used to characterize the existing process for four factor responses including the average of disposable glasses’ weights, heights, crater diameters, and volumes. Goal programming was then utilized to find the combination of optimal factors setting in a vague environment which is measured to apply uncertainty of the initial information when some of the parameters of the models are vague; also, the fuzzy regression model is used to predict the responses of the four described factors. Optimization results show that the process capability index values for disposable glasses’ average of weights, heights, crater diameters and volumes were improved. Such increasing the quality of the products and reducing the waste, which will reduce the cost of the finished product, and ultimately will bring customer satisfaction, and this satisfaction, will mean increased sales.
Abstract: This paper aims at improving the performance of the tableting process using statistical quality control and fuzzy goal programming. The tableting process was studied. Statistical control tools were used to characterize the existing process for three critical responses including the averages of a tablet’s weight, hardness, and thickness. At initial process factor settings, the estimated process capability index values for the tablet’s averages of weight, hardness, and thickness were 0.58, 3.36, and 0.88, respectively. The L9 array was utilized to provide experimentation design. Fuzzy goal programming was then employed to find the combination of optimal factor settings. Optimization results showed that the process capability index values for a tablet’s averages of weight, hardness, and thickness were improved to 1.03, 4.42, and 1.42, respectively. Such improvements resulted in significant savings in quality and production costs.
Abstract: This study optimized the performance of plastic extrusion process of drip irrigation pipes using fuzzy goal programming. Two main responses were of main interest; roll thickness and hardness. Four main process factors were studied. The L18 array was then used for experimental design. The individual-moving range control charts were used to assess the stability of the process, while the process capability index was used to assess process performance. Confirmation experiments were conducted at the obtained combination of optimal factor setting by fuzzy goal programming. The results revealed that process capability was improved significantly from -1.129 to 0.8148 for roll thickness and from 0.0965 to 0.714 and hardness. Such improvement results in considerable savings in production and quality costs.
Abstract: In this paper, the goal programming methodology for
solving multiple objective problem of the technological variants and
production plan optimization has been applied. The optimization
criteria are determined and the multiple objective linear programming
model for solving a problem of the technological variants and
production plan optimization is formed and solved. Then the obtained
results are analysed. The obtained results point out to the possibility
of efficient application of the goal programming methodology in
solving the problem of the technological variants and production plan
optimization. The paper points out on the advantages of the
application of the goal programming methodology compare to the
Surrogat Worth Trade-off method in solving this problem.
Abstract: Management is required to understand all information security risks within an organization, and to make decisions on which information security risks should be treated in what level by allocating how much amount of cost. However, such decision-making is not usually easy, because various measures for risk treatment must be selected with the suitable application levels. In addition, some measures may have objectives conflicting with each other. It also makes the selection difficult. Moreover, risks generally have trends and it also should be considered in risk treatment. Therefore, this paper provides the extension of the model proposed in the previous study. The original model supports the selection of measures by applying a combination of weighted average method and goal programming method for multi-objective analysis to find an optimal solution. The extended model includes the notion of weights to the risks, and the larger weight means the priority of the risk.
Abstract: This research proposes a preemptive fuzzy goal programming model for multi-objective multi-mode resource constrained project scheduling problem. The objectives of the problem are minimization of the total time and the total cost of the project. Objective in a multi-mode resource-constrained project scheduling problem is often a minimization of makespan. However, both time and cost should be considered at the same time with different level of important priorities. Moreover, all elements of cost functions in a project are not included in the conventional cost objective function. Incomplete total project cost causes an error in finding the project scheduling time. In this research, preemptive fuzzy goal programming is presented to solve the multi-objective multi-mode resource constrained project scheduling problem. It can find the compromise solution of the problem. Moreover, it is also flexible in adjusting to find a variety of alternative solutions.
Abstract: Portfolio optimization problem has received a lot of attention from both researchers and practitioners over the last six decades. This paper provides an overview of the current state of research in portfolio optimization with the support of mathematical programming techniques. On top of that, this paper also surveys the solution algorithms for solving portfolio optimization models classifying them according to their nature in heuristic and exact methods. To serve these purposes, 40 related articles appearing in the international journal from 2003 to 2013 have been gathered and analyzed. Based on the literature review, it has been observed that stochastic programming and goal programming constitute the highest number of mathematical programming techniques employed to tackle the portfolio optimization problem. It is hoped that the paper can meet the needs of researchers and practitioners for easy references of portfolio optimization.
Abstract: We model the process of a data center as a multi- objective problem of mapping independent tasks onto a set of data center machines that simultaneously minimizes the energy consump¬tion and response time (makespan) subject to the constraints of deadlines and architectural requirements. A simple technique based on multi-objective goal programming is proposed that guarantees Pareto optimal solution with excellence in convergence process. The proposed technique also is compared with other traditional approach. The simulation results show that the proposed technique achieves superior performance compared to the min-min heuristics, and com¬petitive performance relative to the optimal solution implemented in UNDO for small-scale problems.
Abstract: Proper maintenance and preservation of significant cultural heritages or historic buildings is necessary. It can not only enhance environmental benefits and a sense of community, but also preserve a city's history and people’s memory. It allows the next generation to be able to get a glimpse of our past, and achieve the goal of sustainable preserved cultural assets. However, the management of maintenance work has not been appropriate for many designated heritages or historic buildings so far. The planning and implementation of the reuse has yet to have a breakthrough specification. It leads the heritages to a mere formality of being “reserved”, instead of the real meaning of “conservation”. For the restoration and preservation of cultural heritages study issues, it is very important due to the consideration of historical significance, symbolism, and economic benefits effects. However, the decision makers such as the officials from public sector they often encounter which heritage should be prioritized to be restored first under the available limited budgets. Only very few techniques are available today to determine the appropriately restoration priorities for the diverse historical heritages, perhaps because of a lack of systematized decision-making aids been proposed before. In the past, the discussions of management and maintenance towards cultural assets were limited to the selection of reuse alternatives instead of the allocation of resources. In view of this, this research will adopt some integrated research methods to solve the existing problems that decision-makers might encounter when allocating resources in the management and maintenance of heritages and historic buildings.
The purpose of this study is to develop a sustainable decision making model for local governments to resolve these problems. We propose an alternative decision support model to prioritize restoration needs within the limited budgets. The model is constructed based on fuzzy Delphi, fuzzy analysis network process (FANP) and goal programming (GP) methods. In order to avoid misallocate resources; this research proposes a precise procedure that can take multi-stakeholders views, limited costs and resources into consideration. Also, the combination of many factors and goals has been taken into account to find the highest priority and feasible solution results. To illustrate the approach we propose in this research, seven cultural heritages in Taipei city as one example has been used as an empirical study, and the results are in depth analyzed to explain the application of our proposed approach.
Abstract: Our study is concerned with the development of an Emergency Medical Services (EMS) ambulance location and allocation model called the Time-based Ambulance Zoning Optimization Model (TAZ_OPT). This paper presents the framework of the study. The model is formulated using the goal programming (GP), where the goals are to determine the satellite locations of ambulances and the number of ambulances to be allocated at these locations. The model aims at maximizing the expected demand coverage based on probability of reaching the emergency location within targetted time, and minimizing the ambulance busyness likelihood value. Among the benefits of the model is the increased accessibility and availability of ambulances, thus, enhanced quality of the EMS ambulance services.
Abstract: One of the mayor problems of programming a cruise
circuit is to decide which destinations to include and which don-t.
Thus a decision problem emerges, that might be solved using a linear
and goal programming approach. The problem becomes more
complex if several boats in the fleet must be programmed in a limited
schedule, trying their capacity matches best a seasonal demand and
also attempting to minimize the operation costs. Moreover, the
programmer of the company should consider the time of the
passenger as a limited asset, and would like to maximize its usage.
The aim of this work is to design a method in which, using linear and
goal programming techniques, a model to design circuits for the
cruise company decision maker can achieve an optimal solution
within the fleet schedule.
Abstract: Availability of raw materials is important for
Indonesia as a furniture exporting country. Teak log as raw materials
is supplied to the furniture industry by Perum Perhutani (PP). PP
needs to involve carbon trading for nature conservation. PP also has
an obligation in the Corporate Social Responsibility program. PP and
furniture industry also must prosecute the regulations related to
ecological issues and labor rights. This study has the objective to
create the relationship model between supplier and manufacturer to
fulfill teak log demand that involving teak forest carbon
sequestration. A model is formulated as Goal Programming to get the
favorable solution for teak log procurement and support carbon
sequestration that considering economical, ecological, and social
aspects of both supplier and manufacturer. The results show that the
proposed model can be used to determine the teak log quantity
involving carbon trading to achieve the seven goals to be satisfied the
sustainability considerations.
Abstract: This research presents a fuzzy multi-objective model
for a machine selection problem in a flexible manufacturing system
of a tire company. Two main objectives are minimization of an
average machine error and minimization of the total setup time.
Conventionally, the working team uses trial and error in selecting a
pressing machine for each task due to the complexity and constraints
of the problem. So, both objectives may not satisfy. Moreover, trial
and error takes a lot of time to get the final decision. Therefore, in
this research preemptive fuzzy goal programming model is developed
for solving this multi-objective problem. The proposed model can
obtain the appropriate results that the Decision Making (DM) is
satisfied for both objectives. Besides, alternative choice can be easily
generated by varying the satisfaction level. Additionally, decision
time can be reduced by using the model, which includes all
constraints of the system to generate the solutions. A numerical
example is also illustrated to show the effectiveness of the proposed
model.
Abstract: Project selection problems on management
information system (MIS) are often considered a multi-criteria
decision-making (MCDM) for a solving method. These problems
contain two aspects, such as interdependencies among criteria and
candidate projects and qualitative and quantitative factors of projects.
However, most existing methods reported in literature consider these
aspects separately even though these two aspects are simultaneously
incorporated. For this reason, we proposed a hybrid method using
analytic network process (ANP) and fuzzy logic in order to represent
both aspects. We then propose a goal programming model to conduct
an optimization for the project selection problems interpreted by a
hybrid concept. Finally, a numerical example is conducted as
verification purposes.
Abstract: In general, small-scale vegetables farmers experience
problems in improving the safety and quality of vegetables supplied
to high-class consumers in modern retailers. They also lack of
information to access market. The farmers group and/or cooperative
(FGC) should be able to assist its members by providing training in
handling and packing vegetables and enhancing marketing
capabilities to sell commodities to the modern retailers. This study
proposes an agri-food supply chain (ASC) model that involves the
corporate social responsibility (CSR) activities to cultivate the
capabilities of farmers to access market. Multi period ASC model is
formulated as Weighted Goal Programming (WGP) to analyze the
impacts of CSR programs to empower the FGCs in managing the
small-scale vegetables farmers. The results show that the proposed
model can be used to determine the priority of programs in order to
maximize the four goals to be achieved in the CSR programs.
Abstract: To improve the dynamics response of the vehicle
passive suspension, a two-terminal mass is suggested to connect in
parallel with the suspension strut. Three performance criteria, tire grip,
ride comfort and suspension deflection, are taken into consideration to
optimize the suspension parameters. However, the three criteria are
conflicting and non-commensurable. For this reason, the Chebyshev
goal programming method is applied to find the best tradeoff among
the three objectives. A simulation case is presented to describe the
multi-objective optimization procedure. For comparison, the
Chebyshev method is also employed to optimize the design of a
conventional passive suspension. The effectiveness of the proposed
design method has been clearly demonstrated by the result. It is also
shown that the suspension with a two-terminal mass in parallel has
better performance in terms of the three objectives.
Abstract: This paper aims to develop a model that assists the
international retailer in selecting the country that maximizes the
degree of fit between the retailer-s goals and the country
characteristics in his initial internationalization move. A two-stage
multi criteria decision model is designed integrating the Analytic
Hierarchy Process (AHP) and Goal Programming. Ethical, cultural,
geographic and economic proximity are identified as the relevant
constructs of the internationalization decision. The constructs are
further structured into sub-factors within analytic hierarchy. The
model helps the retailer to integrate, rank and weigh a number of
hard and soft factors and prioritize the countries accordingly. The
model has been implemented on a Turkish luxury goods retailer who
was planning to internationalize. Actual entry of the specific retailer
in the selected country is a support for the model. Implementation on
a single retailer limits the generalizability of the results; however, the
emphasis of the paper is on construct identification and model
development. The paper enriches the existing literature by proposing
a hybrid multi objective decision model which introduces new soft
dimensions i.e. perceived distance, ethical proximity, humane
orientation to the decision process and facilitates effective decision
making.
Abstract: Plastic waste is a big issue in Thailand, but the amount of recycled plastic in Thailand is still low due to the high investment and operating cost. Hence, the rest of plastic waste are burnt to destroy or sent to the landfills. In order to be financial viable, an effective reverse logistics infrastructure is required to support the product recovery activities. However, there is a conflict between reducing the cost and raising environmental protection level. The purpose of this study is to build a goal programming (GP) so that it can be used to help analyze the proper planning of the Thailand-s plastic recycling system that involves multiple objectives. This study considers three objectives; reducing total cost, increasing the amount of plastic recovery, and raising the desired plastic materials in recycling process. The results from two priority structures show that it is necessary to raise the total cost budget in order to achieve targets on amount of recycled plastic and desired plastic materials.