Abstract: Multi objective non-convex economic dispatch problems of a thermal power plant are of grave concern for deciding the cost of generation and reduction of emission level for diminishing the global warming level for improving green-house effect. This paper deals with ramp rate constraints for achieving better inequality constraints so as to incorporate valve point loading for cost of generation in thermal power plant through ramp rate biogeography based optimization involving mutation and migration. Through 50 out of 100 trials, the cost function and emission objective function were found to have outperformed other classical methods such as lambda iteration method, quadratic programming method and many heuristic methods like particle swarm optimization method, weight improved particle swarm optimization method, constriction factor based particle swarm optimization method, moderate random particle swarm optimization method etc. Ramp rate biogeography based optimization applications prove quite advantageous in solving non convex multi objective economic dispatch problems subjected to nonlinear loads that pollute the source giving rise to third harmonic distortions and other such disturbances.
Abstract: Ancillary services are support services which are
essential for humanizing and enhancing the reliability and security of
the electric power system. Reactive power ancillary service is one of
the important ancillary services in a restructured electricity market
which determines the cost of supplying ancillary services and finding
of how this cost would change with respect to operating decisions.
This paper presents a new formation that can be used to minimize the
Independent System Operator (ISO)’s total payment for reactive
power ancillary service. The modified power flow tracing algorithm
estimates the availability of reserve reactive power for ancillary
service. In order to find optimum reactive power dispatch,
Biogeography based optimization method (BPO) is proposed. Market
Reactive Clearing Price (MRCP) is then estimated and it encourages
generator companies (GENCOs) to participate in an ancillary service.
Finally, optimal weighting factor and real time utilization factor of
reactive power give the minimum ISO’s total payment. The
effectiveness of proposed design is verified using IEEE 30 bus
system.