Abstract: As the data-driven economy is growing faster than
ever and the demand for energy is being spurred, we are facing
unprecedented challenges of improving energy efficiency in data
centers. Effectively maximizing energy efficiency or minimising the
cooling energy demand is becoming pervasive for data centers. This
paper investigates overall energy consumption and the energy
efficiency of cooling system for a data center in Finland as a case
study. The power, cooling and energy consumption characteristics
and operation condition of facilities are examined and analysed.
Potential energy and cooling saving opportunities are identified and
further suggestions for improving the performance of cooling system
are put forward. Results are presented as a comprehensive evaluation
of both the energy performance and good practices of energy
efficient cooling operations for the data center. Utilization of an
energy recovery concept for cooling system is proposed. The
conclusion we can draw is that even though the analysed data center
demonstrated relatively high energy efficiency, based on its power
usage effectiveness value, there is still a significant potential for
energy saving from its cooling systems.
Abstract: The rapidly increasing costs of power line extensions
and fossil fuel, combined with the desire to reduce carbon dioxide
emissions pushed the development of hybrid power system suited for
remote locations, the purpose in mind being that of autonomous local
power systems. The paper presents the suggested solution for a “high
penetration" hybrid power system, it being determined by the
location of the settlement and its “zero policy" on carbon dioxide
emissions. The paper focuses on the technical solution and the power
flow management algorithm of the system, taking into consideration
local conditions of development.
Abstract: This paper presents a methodology to harvest the kinetic energy of the raindrops using piezoelectric devices. In the study 1m×1m PVDF (Polyvinylidene fluoride) piezoelectric membrane, which is fixed by the four edges, is considered for the numerical simulation on deformation of the membrane due to the impact of the raindrops. Then according to the drop size of the rain, the simulation is performed classifying the rainfall types into three categories as light stratiform rain, moderate stratiform rain and heavy thundershower. The impact force of the raindrop is dependent on the terminal velocity of the raindrop, which is a function of raindrop diameter. The results were then analyzed to calculate the harvestable energy from the deformation of the piezoelectric membrane.
Abstract: This paper reviews the optimization available
transmission capability (ATC) of power systems using a device of
FACTS named SSSC equipped with energy storage devices. So that,
emplacement and improvement of parameters of SSSC will be
illustrated. Thus, voltage magnitude constraints of network buses,
line transient stability constraints and voltage breakdown constraints
are considered. To help the calculations, a comprehensive program in
DELPHI is provided, which is able to simulate and trace the
parameters of SSSC has been installed on a specific line.
Furthermore, the provided program is able to compute ATC, TTC
and maximum value of their enhancement after using SSSC.
Abstract: Voltage flicker problems have long existed in several
of the distribution areas served by the Taiwan Power Company. In
the past, those research results indicating that the estimated ΔV10
value based on the conventional method is significantly smaller than
the survey value. This paper is used to study the relationship between
the voltage flicker problems and harmonic power variation for the
power system with electric arc furnaces. This investigation discussed
thought the effect of harmonic power fluctuation with flicker
estimate value. The method of field measurement, statistics and
simulation is used. The survey results demonstrate that 10 ΔV
estimate must account for the effect of harmonic power variation.
Abstract: This purpose of this paper is to develop and validate a
model to accurately predict the cell temperature of a PV module that
adapts to various mounting configurations, mounting locations, and
climates while only requiring readily available data from the module
manufacturer. Results from this model are also compared to results
from published cell temperature models. The models were used to
predict real-time performance from a PV water pumping systems in
the desert of Medenine, south of Tunisia using 60-min intervals of
measured performance data during one complete year. Statistical
analysis of the predicted results and measured data highlight possible
sources of errors and the limitations and/or adequacy of existing
models, to describe the temperature and efficiency of PV-cells and
consequently, the accuracy of performance of PV water pumping
systems prediction models.
Abstract: The objective of this paper was to designing a
ventilation system to enhance the performance of roof solar collector
(RSC) for reducing heat accumulation inside the house. The RSC has
1.8 m2 surface area made of CPAC monier roof tiles on the upper part
and gypsum board on the lower part. The space between CPAC
monier and gypsum board was fixed at 14 cm.
Ventilation system of modified roof solar collector (modified
RSC) consists of 9 tubes of 0.15m diameter and installed in the
lower part of RSC. Experimental result showed that the temperature
of the room, and attic temperature. The average temperature
reduction of room of house used modified RSC is about 2oC. and the
percentage of room temperature reduction varied between 0 to 10%.
Therefore, modified RSC is an interesting option in the sense that it
promotes solar energy and conserve energy.
Abstract: This paper presents the development of an electricity simulation model taking into account electrical network constraints, applied on the Belgian power system. The base of the model is optimizing an extensive Unit Commitment (UC) problem through the use of Mixed Integer Linear Programming (MILP). Electrical constraints are incorporated through the implementation of a DC load flow. The model encloses the Belgian power system in a 220 – 380 kV high voltage network (i.e., 93 power plants and 106 nodes). The model features the use of pumping storage facilities as well as the inclusion of spinning reserves in a single optimization process. Solution times of the model stay below reasonable values.
Abstract: Direct search methods are evolutionary algorithms used to solve optimization problems. (DS) methods do not require any information about the gradient of the objective function at hand while searching for an optimum solution. One of such methods is Pattern Search (PS) algorithm. This paper presents a new approach based on a constrained pattern search algorithm to solve a security constrained power system economic dispatch problem (SCED). Operation of power systems demands a high degree of security to keep the system satisfactorily operating when subjected to disturbances, while and at the same time it is required to pay attention to the economic aspects. Pattern recognition technique is used first to assess dynamic security. Linear classifiers that determine the stability of electric power system are presented and added to other system stability and operational constraints. The problem is formulated as a constrained optimization problem in a way that insures a secure-economic system operation. Pattern search method is then applied to solve the constrained optimization formulation. In particular, the method is tested using one system. Simulation results of the proposed approach are compared with those reported in literature. The outcome is very encouraging and proves that pattern search (PS) is very applicable for solving security constrained power system economic dispatch problem (SCED).
Abstract: A hybrid Photovoltaic/Thermal (PV/T) solar system integrates photovoltaic and solar thermal technologies into one single solar energy device, with dual generation of electricity and heat energy. The aim of the present study is to evaluate the potential for introduction of the PV/T technology into Northern China. For this purpose, outdoor experiments were conducted on a prototype of a PV/T water-heating system. The annual thermal and electrical performances were investigated under the climatic conditions of Beijing. An economic analysis of the system was then carried out, followed by a sensitivity study. The analysis revealed that the hybrid system is not economically attractive with the current market and energy prices. However, considering the continuous commitment of the Chinese government towards policy development in the renewable energy sector, and technological improvements like the increasing cost-effectiveness of PV cells, PV/Thermal technology may become economically viable in the near future.
Abstract: The utilize of renewable energy sources becomes
more crucial and fascinatingly, wider application of renewable
energy devices at domestic, commercial and industrial levels is not
only affect to stronger awareness but also significantly installed
capacities. Moreover, biomass principally is in form of woods and
converts to be energy for using by humans for a long time.
Gasification is a process of conversion of solid carbonaceous fuel
into combustible gas by partial combustion. Many gasified models
have various operating conditions because the parameters kept in
each model are differentiated. This study applied the experimental
data including three inputs variables including biomass consumption;
temperature at combustion zone and ash discharge rate and gas flow
rate as only one output variable. In this paper, response surface
methods were applied for identification of the gasified system
equation suitable for experimental data. The result showed that linear
model gave superlative results.
Abstract: Wastages such as grated coconut meat, spent tea and used sugarcane had contributed negative impacts to the environment. Vermicomposting method is fully utilized to manage the wastes towards a more sustainable approach. The worms that are used in the vermicomposting are Eisenia foetida and Eudrillus euginae. This research shows that the vermicompost of wastages has voltage of electrical energy and is able to light up the Light-Emitting Diode (LED) device. Based on the experiment, the use of replicated and double compartments of the component will produce double of voltage. Hence, for conclusion, this harmless and low cost technology of vermicompost can act as a dry cell in order to reduce the usage of hazardous chemicals that can contaminate the environment.
Abstract: In this paper, a new K-means clustering based
approach for identification of voltage control areas is developed.
Voltage control areas are important for efficient reactive power
management in power systems operating under deregulated
environment. Although, voltage control areas are formed using
conventional hierarchical clustering based method, but the present
paper investigate the capability of K-means clustering for the
purpose of forming voltage control areas. The proposed method is
tested and compared for IEEE 14 bus and IEEE 30 bus systems. The
results show that this K-means based method is competing with
conventional hierarchical approach
Abstract: The condition of lightning surge causes the traveling waves and the temporary increase in voltage in the transmission line system. Lightning is the most harmful for destroying the transmission line and setting devices so it is necessary to study and analyze the temporary increase in voltage for designing and setting the surge arrester. This analysis describes the figure of the lightning wave in transmission line with 115 kV voltage level in Thailand by using ATP/EMTP program to create the model of the transmission line and lightning surge. Because of the limit of this program, it must be calculated for the geometry of the transmission line and surge parameter and calculation in the manual book for the closest value of the parameter. On the other hand, for the effects on surge protector when the lightning comes, the surge arrester model must be right and standardized as metropolitan electrical authority's standard. The candidate compared the real information to the result from calculation, also. The results of the analysis show that the temporary increase in voltage value will be rise to 326.59 kV at the line which is done by lightning when the surge arrester is not set in the system. On the other hand, the temporary increase in voltage value will be 182.83 kV at the line which is done by lightning when the surge arrester is set in the system and the period of the traveling wave is reduced, also. The distance for setting the surge arrester must be as near to the transformer as possible. Moreover, it is necessary to know the right distance for setting the surge arrester and the size of the surge arrester for preventing the temporary increase in voltage, effectively.
Abstract: This study examines causal link between energy use and economic growth for five South Asian countries over period 1971-2006. Panel cointegration, ECM and FMOLS are applied for short and long run estimates. In short run unidirectional causality from per capita GDP to per capita energy consumption is found, but not vice versa. In long run one percent increase in per capita energy consumption tend to decrease 0.13 percent per capita GDP. i.e. Energy use discourage economic growth. This short and long run relationship indicate energy shortage crisis in South Asia due to increased energy use coupled with insufficient energy supply. Beside this long run estimated coefficient of error term suggest that short term adjustment to equilibrium are driven by adjustment back to long run equilibrium. Moreover, per capita energy consumption is responsive to adjustment back to equilibrium and it takes 59 years approximately. It specifies long run feedback between both variables.
Abstract: In a liberalized electricity market, it is not surprising
that different customers require different power quality (PQ) levels at
different price. Power quality related to several power disturbances is
described by many parameters, so how to define a comprehensive
hierarchy evaluation system of power quality (PQCHES) has become
a concerned issue. In this paper, based on four electromagnetic
compatibility (EMC) levels, the numerical range of each power
disturbance is divided into five grades (Grade I –Grade V), and the
“barrel principle" of power quality is used for the assessment of
overall PQ performance with only one grade indicator. A case study
based on actual monitored data of PQ shows that the site PQ grade
indicates the electromagnetic environment level and also expresses the
characteristics of loads served by the site.
The shortest plank principle of PQ barrel is an incentive
mechanism, which can combine with the rewards/penalty mechanism
(RPM) of consumed energy “on quality demand", to stimulate utilities
to improve the overall PQ level and also stimulate end-user more
“smart" under the infrastructure of future SmartGrid..
Abstract: The load flow study in a power system constitutes a study of paramount importance. The study reveals the electrical performance and power flows (real and reactive) for specified condition when the system is operating under steady state. This paper gives an overview of different techniques used for load flow study under different specified conditions.
Abstract: This paper presents a model for analysis the induced voltage of transmission lines (energized) acting on neighboring distribution lines (de-energized). From environmental restrictions, 22 kV distribution lines need to be installed under 115 kV transmission lines. With the installation of the two parallel circuits like this, they make the induced voltage which can cause harm to operators. This work was performed with the ATP-EMTP modeling to analyze such phenomenon before field testing. Simulation results are used to find solutions to prevent danger to operators who are on the pole.
Abstract: This paper deals with stakeholders’ decisions within energy neutral urban redevelopment processes. The decisions of these stakeholders during the process will make or break energy neutral ambitions. An extensive form of game theory model gave insight in the behavioral differences of stakeholders regarding energy neutral ambitions and the effects of the changing legislation. The results show that new legislation regarding spatial planning slightly influences the behavior of stakeholders. An active behavior of the municipality will still result in the best outcome. Nevertheless, the municipality becomes more powerful when acting passively and can make the use of planning tools to provide governance towards energy neutral urban redevelopment. Moreover, organizational support, recognizing the necessity for energy neutrality, keeping focused and collaboration among stakeholders are crucial elements to achieve the objective of an energy neutral urban (re)development.
Abstract: This paper focuses on developing an integrated
reliable and sophisticated model for ultra large wind turbines And to
study the performance and analysis of vector control on large wind
turbines. With the advance of power electronics technology, direct
driven multi-pole radial flux PMSG (Permanent Magnet Synchronous
Generator) has proven to be a good choice for wind turbines
manufacturers. To study the wind energy conversion systems, it is
important to develop a wind turbine simulator that is able to produce
realistic and validated conditions that occur in real ultra MW wind
turbines. Three different packages are used to simulate this model,
namely, Turbsim, FAST and Simulink. Turbsim is a Full field wind
simulator developed by National Renewable Energy Laboratory
(NREL). The wind turbine mechanical parts are modeled by FAST
(Fatigue, Aerodynamics, Structures and Turbulence) code which is
also developed by NREL. Simulink is used to model the PMSG, full
scale back to back IGBT converters, and the grid.