Abstract: This paper presents a genetic algorithm based permutation and non-permutation scheduling heuristics (GAPNP) to solve a multi-stage finite capacity material requirement planning (FCMRP) problem in automotive assembly flow shop with unrelated parallel machines. In the algorithm, the sequences of orders are iteratively improved by the GA characteristics, whereas the required operations are scheduled based on the presented permutation and non-permutation heuristics. Finally, a linear programming is applied to minimize the total cost. The presented GAPNP algorithm is evaluated by using real datasets from automotive companies. The required parameters for GAPNP are intently tuned to obtain a common parameter setting for all case studies. The results show that GAPNP significantly outperforms the benchmark algorithm about 30% on average.
Abstract: This paper aims to present non-population search algorithms called tabu search (TS), simulated annealing (SA) and variable neighborhood search (VNS) to minimize the total cost of capacitated MRP problem in multi-stage assembly flow shop with two alternative machines. There are three main steps for the algorithm. Firstly, an initial sequence of orders is constructed by a simple due date-based dispatching rule. Secondly, the sequence of orders is repeatedly improved to reduce the total cost by applying TS, SA and VNS separately. Finally, the total cost is further reduced by optimizing the start time of each operation using the linear programming (LP) model. Parameters of the algorithm are tuned by using real data from automotive companies. The result shows that VNS significantly outperforms TS, SA and the existing algorithm.
Abstract: Decision support based upon risk analysis into
comparison of the electricity generation from different renewable
energy technologies can provide information about their effects on
the environment and society. The aim of this paper is to develop the
assessment framework regarding risks to health and environment,
and the society-s benefits of the electric power plant generation from
different renewable sources. The multicriteria framework to
multiattribute risk analysis technique and the decision analysis
interview technique are applied in order to support the decisionmaking
process for the implementing renewable energy projects to
the Bangkok case study. Having analyses the local conditions and
appropriate technologies, five renewable power plants are postulated
as options. As this work demonstrates, the analysis can provide a tool
to aid decision-makers for achieving targets related to promote
sustainable energy system.