Abstract: Energization of a transformer results in sudden flow of current which is an effect of core magnetization. This current will be dominated by the presence of second harmonic, which in turn is used to segregate fault and inrush current, thus guaranteeing proper operation of the relay. This additional security in the relay sometimes obstructs or delays differential protection in a specific scenario, when the 2nd harmonic content was present during a genuine fault. This kind of scenario can result in isolation of the transformer by Buchholz and pressure release valve (PRV) protection, which is acted when fault creates more damage in transformer. Such delays involve a huge impact on the insulation failure, and chances of repairing or rectifying fault of problem at site become very dismal. Sometimes this delay can cause fire in the transformer, and this situation becomes havoc for a sub-station. Such occurrences have been observed in field also when differential relay operation was delayed by 10-15 ms by second harmonic blocking in some specific conditions. These incidences have led to the need for an alternative solution to eradicate such unwarranted delay in operation in future. Modern numerical relay, called as intelligent electronic device (IED), is embedded with advanced protection features which permit higher flexibility and better provisions for tuning of protection logic and settings. Such flexibility in transformer protection IEDs, enables incorporation of alternative methods such as dynamic switching of second harmonic feature for blocking the differential protection with additional security. The analysis and precautionary measures carried out in this case, have been simulated and discussed in this paper to ensure that similar solutions can be adopted to inhibit analogous issues in future.
Abstract: In this paper, various methods of providing restricted
earth fault protection are discussed. The proper operation of high and
low impedance Restricted Earth Fault (REF) protection for various
applications has been discussed. The maloperation of a relay due to
improper placement of CTs has been identified and a simple/unique
solution has been proposed in this work with a case study. Moreover,
it is found that the proper placement of CT in high impedance method
will provide the same result with reduced CT. This methodology has
been successfully implemented in Al Takreer refinery for a 2000
KVA transformer. The outcome of the paper may be included in
IEEEC37.91 standard to give the proper guidance for protection
engineers to sort out the issues related to mal functioning of REF
relays.
Abstract: In this paper, monitoring and control of tap changer
mechanism of a transformer implementation in an Intelligent
Electronic Device (IED) is discussed. It has been a custom for
decades to provide a separate panel for on load tap changer control
for monitoring the tap position. However, this facility cannot either
record or transfer the information to remote control centers. As there
is a technology shift towards the smart grid protection and control
standards, the need for implementing remote control and monitoring
has necessitated the implementation of this feature in numerical
relays. This paper deals with the programming, settings and logic
implementation which is applicable to both IEC 61850 compatible
and non-compatible IEDs thereby eliminating the need for separate
tap changer control equipment. The monitoring mechanism has been
implemented in a 28MVA, 110 /6.9kV transformer with 16 tap
position with GE make T60 IED at Ultratech cement limited
Gulbarga, Karnataka and is in successful service.