A Study of Flow and Sedimentation at the Basins of Khoozestan Province Rivers: A Case Study of Boneh Basht Pumping Station

The present paper is a case study about exploitation of Kheir Abad river (Khoozestan, Iran) water resources and the problems caused by river sediments around the pumping stations. The weak points and strong points of Boneh Basht pumping station have been studied by experienced experts, work teams, and consulting engineers and technical and executive solutions have been suggested. Therefore, the suggestions of this article are based on the performed studies and are proposed in order to evaluate the logical solutions. Rather complicated processes resulting from the interaction of water flows and sediments observed at Boneh Basht pumping station occur at other pumping stations in almost the same way. Therefore, Boneh Basht pumping station can be selected as a sample (pilot) and up-to-date theories and experiences can be applied to this station and the results can be offered to other stations.

A Study of Methods for Preservation of River Banks in order to Reduce Sediments

Reducing river sediments through path correction and preservation of river walls leads to considerable reduction of sedimentation at the pumping stations. Path correction and preservation of walls is not limited to one particular method but, depending on various conditions, a combination of several methods can be employed. In this article, we try to review and evaluate methods for preservation of river banks in order to reduce sediments.

Assessing the Problems of Pumping Stations: A Case Study of Boneh Basht Pumping Station

Establishing pumping stations is one of the most common ways of providing water from rivers. There are many issues involved in the design and operation of pumping stations most important of which is the problem of sedimentation. One of the significant issues which must be taken into consideration in designing pumping stations is the operation method and technical matters related to it. Safety and convenience of operation is one of the issues that must be always considered by the designer. Some of the major issues in making decisions regarding the type of design for the station are geographical condition, the location of the station and availability of experts in maintenance and operation of the station. Dimensions of the station must allow free movement for checking and operating pumps after installation of pumps and plumbing system.